Grantham Canal
Grantham Canal is a
canal that runs 33 miles (53 km) from
Grantham through 18
locks to West Bridgford where it joins the
River Trent. It was built primarily to allow for the transportation of coal to Grantham.
After a survey carried out by
William Jessop in the summer of
1791, a bill was put to Parliament in
1792 but was rejected. A revised route was developed, with the junction now at West Bridgford. A second bill was put forward and received the Royal Assent on
30 April 1793. Building work on the canal started in
1793, with Jessop in overall charge, but with James Green and William King as resident engineers: Green was appointed engineer for the section of canal from the Trent to the Leicestershire border, and Kind from there to Grantham.
The act authorised an initial £75,000 to be raised to pay for construction, together with an option to raise a further of £30,000, of which £20,000 should be raised by shares of £100 each among the initial subscribers, and £10,000 by mortgaging the future income of the canal. However, this amount proved insufficient, and there was also disagreement between the shareholders as to their liability to raise the additional £20,000. As a result a second act was sought. This received the Royal Assent on
3 March 1797, and made clear the obligations of existing shareholders to pay the extra subscription, and also authorised an additional £24,000 to be raised. The second act also removed restrictions in the first act, and allowed the company to set whatever rates it chose for using the canal.
The eastern section from the Leicestershire border was opened on
1 February 1797, with the rest of the canal later that year. The canal was built with locks 75 feet by 14 feet (22.9 metres by 4.3 metres), the same size as those on the
Nottingham Canal to allow boats to use both. The branch to Bingham authorised by the first act was not built.
Initially the canal did well, but, in common with most canals, competition from railways posed a major threat, and in
1845 the canal owners agreed to sell it to the Ambergate, Nottingham, Boston and Eastern Junction Railway when their line from Ambergate to Grantham was opened. Although the railway was completed in
1850, the railway company had changed their mind, but following a number of court cases, the sale took place in
1854. Railway mergers meant that the canal came under the control of the
Great Northern Railway in
1861, and later the
London and North Eastern Railway.
Traffic declined as the railway companies neglected the canal, and an Act of Parliament was passed in
1936, formally closing the canal, though there had been no boat traffic for ten years. The closure act stipulated that a 2 feet (60 cm) level of water should be maintained to support agricultural needs. This effectively guaranteed the continued existence of the canal channel, but structures such as locks and bridges deteriorated, and in the
1950s 46 of the 69 bridges over the canal were flattened as part of road improvements. Although the low bridges act as barriers to navigation, large parts of the canal are still in water.
In
1947 Britain's railways, and hence the canal, were nationalised. In
1963 control of the canal passed to
British Waterways. In 1968 the canal was placed into a "remaindered" state, which involved maintenance of the water level and general maintenance of the line.
The Grantham Canal Restoration Society was formed in the early
1970s. Together with British Waterways, the
Inland Waterways Association and the
Waterway Recovery Group, the Society began the work of
restoration of the canal to navigation, a process which is still ongoing. Following the restoration of the three locks at Woolsthorpe in the
1990s, a 10-mile (16-kilometre) section from the A1 to Redmile will be completed once the four locks at Stenwith are restored. The Polser Brook Aqueduct was restored in
2003, and five locks have so far been restored. The railway embankment at Woolsthorpe which blocked the canal has been removed. Approximately one quarter of the canal is now to navigable standard, and much improvement of the towpath has taken place.
At this time the two major challenges are relinking the canal to the River Trent and the final route into Grantham. The original route to the Trent has a number of low bridges, notably
A52: there are practical proposals for altnerative new cuts, though these pose additional problems in finding funding, since they are not restoration. At Grantham, the
A1 embankment blocks the line of the canal, and the terminal basin has been filled in: there are plans for a tunnel under the A1 as part of a cycle route to improve access to Grantham, and the basin could be redeveloped in due course.
There is also a 5-mile (8-kilometre) dry section between Cotgrave and Kinoulton, which has presented problems since construction in the 18th century: gypsum in the soil reacted with the waterproof clay leading to leaking. Following closure, this section then became colonised by an invasive shrub.
In early
2005, British Waterways appointed a full-time Grantham Canal restoration manager, Kevin Mann, for an initial 18-month trial period. He will be responsible for planning and managing funding schemes for the restoration, identifying development opportunities and the promotion and interpretation of the canal.
*http://www.granthamcanal.com/