AllExperts > Encyclopedia 
Search      
Find out about volunteering to AllExperts

West Coast Main Line: Encyclopedia BETA


Free Encyclopedia
 Home · Index · Browse A-Z  · Questions and Answers ·
Encyclopedia

Browse A-Z
ABCDEFGHIJKLMNOPQRSTUVWXYZNum


License
Disclaimer

 
 
 
 
Free Online Courses
12 Weeks to Weight Loss
Take Charge of Stress
Learn How to Bake
Budgeting 101
Deeper Faith
DIY Fashion Makeover

       MORE E-COURSES
 
   

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z  Misc

West Coast Main Line

WCML_and_M1.jpg

The WCML running alongside the M1 motorway at Watford Gap in Northamptonshire

The West Coast Main Line (WCML) is one of the most important intercity railway lines in the United Kingdom, part of the British railway system. The line links London and Glasgow on a 401-mile route which runs via the West Midlands, the North West and southern Scotland.

The WCML also serves other important towns and cities including Milton Keynes, Northampton, Rugby, Nuneaton, Coventry, Birmingham, Wolverhampton, Stafford, Stoke-on-Trent, Macclesfield, Crewe, Warrington, Wigan, Stockport, Manchester, Liverpool, Preston, Lancaster, Carlisle and Edinburgh.

A Virgin Pendolino and freight train on the WCML

History

The line was built in stages between the 1830s and the 1870s, with the first stages being the Grand Junction Railway (Warrington - Birmingham) and the London and Birmingham Railway, both completed in the 1830s. These lines together with the Liverpool and Manchester Railway, the North Union Railway and the Manchester and Birmingham Railway amalgamated in 1846 to form the London and North Western Railway (LNWR). North of Carlisle, the Caledonian Railway remained independent and built its mainline to Glasgow in 1849. One important section, the North Staffordshire Railway, which opened its line in 1848 from Macclesfield (connecting with the LNWR from Manchester) via Stoke-on-Trent to Norton Bridge and Colwich, also remained independent until the forced amalgamations of 1922.

Partly to appease the concerns and anger of landowners along the route, in places the line was built so that it avoided large estates and rural towns, but also to reduce construction costs the line in places followed natural contours, resulting in many curves and bends. The WCML also passes through some of the more hilly areas of the British mainland, such as the Chilterns (Tring cutting), the Watford Gap and Northampton uplands followed by the Trent Valley, the mountains of Cumbria with a summit at Shap and the Beattock summit in the Leadhills area of southern Lanarkshire. This has left a legacy of lower maximum speeds on the line compared to the East Coast Main Line route, and the principal solution to the problem has been the adoption of tilting trains, formerly British Rail's ill-fated APT, and latterly the Pendolino trains introduced by Virgin in 2003.

The route to Scotland was marketed by the LNWR as 'The Premier Line' but operations were complicated by incompatible braking systems since the LNWR used the vacuum brake and the Caledonian used the Westinghouse air brake. Through trains were therefore of necessity composed of dual braked and jointly owned "West Coast Joint Stock" (so named). Following amalgamation, in 1922, it became part of the London, Midland and Scottish Railway (LMS) and the vacuum brake quickly became standard. In 1947, following nationalisation, it came under control of British Railways London Midland and Scottish Regions, when the term "West Coast Main Line" officially came into use, although the term is something of a misnomer given that the line only runs along the coast on a brief section just north of Lancaster.

The WCML is not a single railway; rather it can be thought of as a network of routes which diverge and rejoin the central spine which runs between London Euston and Glasgow Central. The route from Rugby to Birmingham Wolverhampton and Stafford was the original main line until the shorter line was built via the Trent Valley. There is a loop that serves Northampton and a branch north of Crewe to Liverpool. The WCML includes loops that branch off to serve Manchester, one from Colwich Junction in the Trent Valley south of Stafford via Stoke-on-Trent, one north of Stafford also via Stoke-on-Trent and one via Crewe and Wilmslow. The Windsor Link north-south junction line in Manchester constructed by British Rail in 1988 has made possible a through service via Bolton back to the main line at Preston. A further branch at Carstairs links Edinburgh to the WCML, giving it a direct connection to the East Coast route.
WCML_near_Ansty.jpg

A Class 87 with a train of Mark 3 coaches on the WCML in Warwickshire

Modernisation by British Rail

The line was modernised and electrified in stages between 1959 and 1974 - initial electrification was in 1959 between Crewe and Manchester and Liverpool, with the rest of the southern section of the line following in stages to 1967; the line from Weaver Junction (where the route to Liverpool diverges) to Glasgow was electrified in 1974. This era was notable for time consuming and congestion causing routine changes from at first steam and later diesel to electric traction at busy change-over stations like Birmingham New Street, Crewe and Preston. Electrification did not arrive on the short Carstairs Junction - Edinburgh Waverley branch until 1989, since this was at the time considered part of the ECML.

Modernisation culminated in the adoption of air brakes for locomotive hauled express trains. Also under British Rail, freight train operations and practices changed drastically resulting in the virtual elimination of the traditional slow moving and generally unbraked pick-up goods train and the introduction of faster moving point to point train load operations using air braked vehicles.

The running of express passenger services on the WCML came under the InterCity brand in the late 1970s, which prior to privatisation in 1996 was known as "InterCity West Coast". "InterCity CrossCountry" with its hub at Birmingham was also greatly developed with the introduction of transferred HST units following the electrification of the East Coast Main Line. Following privatisation, the principal operator on the line has been Virgin Trains who operate all long-distance express services, but many regional operators along the route also run local commuter sevices.

Modernisation by Network Rail

The WCML is currently undergoing a major upgrade along almost its entire length. The original plans drawn up by Railtrack estimated that this upgrade would cost £2bn, be ready by 2005, and cut journey times London to Birmingham to 1hr (currently 1hr 40mins) and 1hr 45mins London to Manchester. This would be achieved through increasing the line speed to 225 km/h (140 mph), in place of the previous maximum of 175 km/h (110 mph).

However the plan was doomed from the beginning, since Railtrack had not assessed the technical viability of "moving block signalling" (see the Railway Signalling page for more details) prior to promising the speed increase to Virgin and the Government. No-one had attempted to implement moving block on a line as complex as the WCML anywhere on the world, and it soon became apparent to engineers that the technology was not mature enough to be used on the line. The bankruptcy of Railtrack in 2001 following the Hatfield crash brought a reappraisal of the plans whilst the original cost of the upgrade soared. The revised estimates indicate that the cost will £13bn, be ready by 2008 with a maximum speed for tilting trains of a more modest 200 km/h (125 mph). Services from Liverpool to the South West and the South Coast were withdrawn by Virgin in September 2003.

The first phase of the upgrade, south of Manchester, opened on 27 September 2004 with London to Birmingham journey times of 1hr 21mins and London to Manchester 2 hours 6 minutes. The final phase was announced as opening on December 12, 2005, bringing the journey from London to Glasgow to about 4½ hours, [1] although considerable work such as the quadrupling of the track in the Trent Valley (in progress and moving towards completion under budget), upgrading the slow lines, the second phase of remodelling Nuneaton, and the remodelling of Stafford, Rugby, Milton Keynes and Coventry stations are mostly now progressing. The upgrading of the Crewe to Manchester line via Wilmslow is nearing completion in Summer 2006.

Engineering work began again in late 2005 between Preston and Carlisle. This affected a number of stations; Lancaster, Oxenholme Lake District, and Penrith. Train services run as normal from Monday to Friday, with a replacement bus service at the weekend between Preston to Carlisle, calling at all the affected stations. From April 2006, train services at the weekend were no longer terminated at Preston, and continued to Oxenholme Lake District where Virgin Trains terminated and this became the starting point for southbound services. The Oxenholme to Carlisle section of line is due to reopen at weekends during the summer of 2006.

New trains for the route include 53 nine-car Pendolino trains and initially 30 four-car Desiro electric trains for Silverlink/Central Trains (with more anticipated) as well as Virgin Voyager and Super-Voyager trains for the cross-country services. Pendolino 2005 off-peak frequency of six trains per hour (rising to ten in the morning peak) is planned to increase to nine off-peak by 2009 including three per hour to both Birmingham and Manchester plus an hourly tilting Voyager service to Chester as well as improved services to Liverpool, Preston and Scotland. There will also be an hourly Desiro operation from London to Crewe serving Watford, Milton Keynes, Northampton, Rugby, Nuneaton, Atherstone, Tamworth, Lichfield, Rugeley, Stafford and Crewe.

Virgin Trains recently put forward plans to increase the line speed in places on the WCML and particularly on sections of the Trent Valley Line between Stafford and Rugby from 125 mph to 135 mph after the quadrupling of track had been completed. This would permit faster services and possibly allow additional train paths. 135 mph is claimed to be achievable by Pendolino trains while using existing signalling systems without the need for a cab signalling system. Network Rail are studying this proposal.

In promoting the above proposal Virgin Trains report that passenger numbers on Virgin West Coast have increased from 13.6 million in 1997/98 to 18.7 million in 2005/6, while numbers on Virgin CrossCountry have grown from 12.6 million to 20.4 million over the same period.

The route in detail

Network Rail, successor from 2001 to Railtrack plc, in its latest business plan published in April 2006, see http://www.networkrail.co.uk/aspx/3085.aspx, has divided its National network into 26 'Routes' for planning, maintenance and operational purposes. Although Route 18 is named 'West Coast Main Line' it includes several branch lines that had not previously been considered part of the WCML. Likewise several lines that have traditionally been seen as parts of the WCML, including all the northern terminal sections of the WCML, are incorporated in other 'Routes'.

The cities and towns served by the WCML are listed in the tables below. Stations on loops and branches are marked ** Those stations in italics are not served by main-line services run by Virgin Trains but only by local trains. Between Euston and Watford Junction the WCML is largely but not exactly parallelled by the operationally independent Watford DC Line with 17 intermediate stations, including three with additional platforms on the WCML.

The final table retraces the route specifically to indicate the many loops, branches, junctions and interchange stations on Route 18, which is the core of the WCML, with the new 'Route' names for connecting lines.

The North Wales Coast Line from Crewe to Holyhead and the line from Manchester to Preston are not electrified. Services from London to Holyhead and from Manchester to Scotland are mostly operated either by Virgin Super Voyager tilting diesel trains or, in the case of one of the Holyhead services, by a Pendolino set hauled from Crewe by a diesel locomotive.

London to Glasgow and Edinburgh (Network Rail Route 18)

Town/CityStationOrdnance Survey
grid reference
Branches and loops
LondonLondon Euston
WembleyWembley Central
HarrowHarrow and Wealdstone
BusheyBushey
WatfordWatford Junction
ApsleyApsley
Kings LangleyKings Langley
Hemel HempsteadHemel Hempstead
BerkhamstedBerkhamstead
TringTring
CheddingtonCheddington
Leighton BuzzardLeighton Buzzard
Bletchley, Milton KeynesBletchley
** Bedford** BedfordMarston Vale Line spur
Milton Keynes (centre)Milton Keynes Central
Wolverton, Milton KeynesWolverton
** Northampton** NorthamptonNorthampton Loop diverges north of Wolverton
** Long Buckby** Long BuckbyNorthampton Loop rejoins south of Rugby
RugbyRugbyRugby-Birmingham-Wolverhampton-Stafford
(see separate table below)
NuneatonNuneaton
AtherstoneAtherstone
PolesworthPolesworth
TamworthTamworth
LichfieldLichfield Trent Valley
RugeleyRugeley Trent Valley
StaffordStaffordRugby-Birmingham-Stafford rejoins
Manchester via Stoke-on-Trent diverges
either before or after Stafford (two routes)
** Stoke-on-Trent** Stoke-on-Trent
** Congleton** Congleton
** Macclesfield** Macclesfield
** Stockport** Stockport
** Manchester** Manchester Piccadilly
CreweCreweCrewe-Manchester-Preston and
Crewe-Chester-North Wales-Holyhead
(see separate tables below)
WinsfordWinsford
NorthwichHartford
Acton BridgeActon BridgeLiverpool route diverges north of Acton Bridge
** Runcorn** Runcorn
** Liverpool** Liverpool Lime Street
WarringtonWarrington Bank Quay
WiganWigan North Western
PrestonPrestonCrewe-Manchester-Preston rejoins
LancasterLancaster
Oxenholme (Kendal)Oxenholme Lake District
PenrithPenrith
CarlisleCarlisle
LockerbieLockerbie
Carstairs Carstairs Junction
Then either
MotherwellMotherwell
GlasgowGlasgow Central
or
HaymarketHaymarket
EdinburghEdinburgh Waverley'''

Branches and loops

=Rugby-Birmingham-Wolverhampton-Stafford (Network Rail Route 17)

=*Rugby
*Coventry
Canley
Tile Hill
Berkswell, Balsall Common
Hampton-in-Arden
*Birmingham International Airport
Marston Green
Lea Hall
Stechford
Adderley Park
*Birmingham (centre)
Smethwick
Smethwick
*Sandwell and Dudley
Dudley Port
Tipton
Coseley
*Wolverhampton
Penkridge
*Stafford
*Rugby
*Coventry
Canley
Tile Hill
Berkeswell
Hampton-in-Arden
*Birmingham International
Marston Green
Lea Hall
Stechford
Adderley Park
*Birmingham New Street
Smethwick Rolfe Street
Smethwick Galton Bridge
*Sandwell and Dudley
Dudley Port
Tipton
Coseley
*Wolverhampton
Penkridge
*Stafford

*

*>
Town/City ¦¦Station>Ordnance Survey
grid reference

=Crewe-Holyhead (North Wales Coast Line) (Network Rail Route 22)

=*Crewe
*Chester
*Flint
*Prestatyn
*Rhyl
*Colwyn Bay
*Llandudno Junction
**Llandudno
*Bangor
*Holyhead (for Dublin via ferry)
*Crewe
*Chester
*Flint
*Prestatyn
*Rhyl
*Colwyn Bay
*Llandudno Junction
**Llandudno
*Bangor
*Holyhead

*>
Town/City ¦¦Station>Ordnance Survey
grid reference

=Crewe-Manchester-Preston (Network Rail Route 20)

=*Crewe
*Wilmslow
*Stockport
*Manchester
*Bolton
*Preston
*Crewe
*Wilmslow
*Stockport
*Manchester Piccadilly
*Bolton
*Preston

*>
Town/City ¦¦Station>Ordnance Survey
grid reference

Network Rail Route 18 (WCML) - Branches and Junctions

LocationTypeRouteDetails
Camden JnctBranch18Watford DC Line (WDCL)
+Junction6North London Line from Primrose Hill joins WDCL and WCML
Willesden JnctJunction6North London Line from West Hampstead joins WDCL and WCML
+Junction2West London Line from Clapham Junction joins WCML
+Junction6North London Line from Richmond joins WCML
Willesden JunctionInterchange6North London Line with Watford DC Line
Watford JunctionBranch18Watford DC Line terminates at separate bay platforms
+Branch18St Albans Branch Line (AC single line single section) to St Albans
BletchleyBranch18Marston Vale Line to Bedford
Bletchley High Level (Denbigh Hall South Jnct)Branch16Freight only line to Newton Longville (remnant of mothballed Varsity Line to Oxford)
Hanslope JunctionLoop18Northampton Loop rejoins just south of Rugby
RugbyJunction17West Midlands Main Line to Coventry, Birmingham, Wolverhampton and Stafford
NuneatonJunction19The Birmingham to Peterborough Line from Peterborough
+Junction17The Coventry to Nuneaton Line
+Junction17The Birmingham to Peterborough Line to Birmingham
TamworthInterchange17The Cross Country Route (MR) Bristol and Birmingham to Derby and the North East
Lichfield TVInterchange17The Birmingham Cross-City Line Redditch to Lichfield
+Junction17north of the station
Rugeley TVJunction17The Chase Line from Birmingham to Rugeley and Stafford
Colwich JnctBranch18to Stoke-on-Trent and Manchester (Route 20 from Cheadle Hulme)
StaffordJunction17West Midlands Main Line from Coventry, Birmingham and Wolverhampton
Norton BridgeBranch18to Stone to join line from Colwich Jnct to Manchester (Route 20 from Cheadle Hulme)
Stoke-on-TrentJunction19from Derby
KidsgroveBranch18to Alsager and Crewe
Cheadle Hulme-20Route 18 London - Manchester Line becomes Route 20 through to Manchester
CreweBranch18from Kidsgrove (diesel service from Skegness, Grantham, Nottingham Derby and Stoke-on-Trent)
+Junction14The Welsh Marches Line from South Wales, Hereford and Shrewsbury
+Junction22to Chester and the North Wales Coast Line
+Junction20to Wilmslow, Manchester Airport, Stockport and Manchester
Hartford North Junction20(freight only) from Northwich
Weaver JnctBranch18Runcorn and Liverpool (Route 20 from Liverpool South Parkway railway station>Liverpool South Parkway)
Liverpool South Parkway -20Route 18 London to Liverpool Line becomes Route 20 to Liverpool
WarringtonJunction22from Llandudno and Chester to Manchester
Winwick JnctJunction20to Liverpool, Earlestown and Manchester
WiganJunction20from Manchester
+Junction20The Liverpool to Wigan Line
Euxton JnctJunction20The Manchester to Preston Line from Manchester
Farington JnctJunction20Ormskirk Branch Line, East Lancashire Line and Caldervale Line
Preston DockJunction23west
Preston Junction20to Blackpool
Morecambe South JnctJunction23to Morecambe
Hest Bank JnctJunction23from Morecambe
Carnforth JnctJunction23Furness Line to Barrow-in-Furness and also the Airedale Line to Leeds
OxenholmeJunction23to Windermere
PenrithJunction23Route 23 uses two junctions to the north of the station
CarlisleJunction23Route 23 Settle-Carlisle Railway and Route 9 from Newcastle
+Junction23The Cumbrian Coast Line from Barrow-in-Furness
Gretna JnctJunction26to the Glasgow South Western Line
Carstairs South JnctJunction24Route 18 West Coast Main Line becomes Route 24 to Edinburgh
Carstairs South-26Route 18 West Coast Main Line becomes Route 26 to Glasgow

See also

*East Coast Main Line
*Rail transport in the United Kingdom
*UK topics

External links

*Rail Industry www page which monitors the progress of the project
*Department of Transport - 2006 - West Coast Main Line - Update Report
*Network Rail Business Plans and Reports



Email this page
About Us | Advertise on This Site | User Agreement | Privacy Policy | Kids' Privacy Policy | Help
About and About.com are registered trademarks of About, Inc. The About logo is a trademark of About, Inc. All rights reserved.
This is the "GNU Free Documentation License" reference article from the English Wikipedia. All text is available under the terms of the GNU Free Documentation License. See also our Disclaimer.