AboutPaul S. Brown, AIA Expertise How to work with an Architect. What to expect for design fees. What services are normally
included; what are not included? How do I find an Architect in my area? Why do I need an
Architect? How to be clear about your space needs. Why time must be managed properly.
Experience 24 years involvement in the practice of Architecture, including some teaching experience. Most of my work has been within the employment of various firms, but I have also done some small-scale projects on my own.
Particular interests include Environmental Design, "Green" Design, and Appropriate Technologies. LEED (TM) Accredited Professional.
I have some specific experience with Historic Preservation, Medical Facilities, Commercial Interiors, and Public School projects.
Education: Bachelor of Environmental Design Degree (Architecture), 1978, Miami University in Ohio. I am registered to practice professionally in the states of Massachusetts and Maine.
Question I am planning build an addition on to the back of our 28' x 55' ranch. The current roof pitch is 5/12. i want it to T. This is a standard 60's brick ranch. It also needs to run the full length (55'). Can you tell me the minimum width to keep pitch consistent.
Answer Hi Kristi:
I would like to help with this, but need some more information; or clarification. I am confused by the statements that you want it to 'T', but also want the addition to run the full length of the house. These two requirements seem to conflict with each other.
Also, the only way to keep the pitch 'consistent', which I think means 'the same', is to keep the width the same (assuming that the ridge and eave lines will meet). So, if your existing home is 28' wide, this would mean that the addition would need to be 28' wide, if you want it to 'T' into the existing house, have the ridge and eave lines meet, and keep the same 5/12 pitch.
I hope this helps,
Thanks,