Question
I HAVE A NUMBER OF CONCRETE SECTIONS AT OUR HOA THAT TEND TO RAISE AS MUCH AS 3 INCHES WHEN THE TEMPERATURE IS BELOW FREEZING.  I AM LOOKING TO HAVE THESE SECTIONS REMOVED AND TO POUR A NEW 4 INCH SLAB.  I AM LOOKING TO REMOVE 6 TO 8 INCHES OF THE CURRENT SUB BASE MATERIAL (MOSTLY CLAY I THINK) AND PLACE THIS DEPTH OF STONE FOR A NEW SUB BASE.  IS THIS SUFFICIENT TO SOLVE THE LIFTING PROBLEM AND WHAT SIZE STONE IS BEST FOR THIS APPLICATION.

THANKS FOR YOUR ADVICE     RON

Answer
Ron,


Carefully remove the clay subsoil and try not to disturb areas where your sections of slab are to remain , best to excavate the perimeter at a 45 degree splay just beyond the area of repair.
You dont indicate any damproof membrane or reinforcement or expansion movement joints in your question.

Normal preparation as follows working down from concrete finish slab.
100mm concrete slab, A252 mesh fabric with 40mm top cover acts as anti crack reinforcement, laid on visqueen 1200 guage plastic dpm on 20mm sand blinder on 250-300mm type one inch hardcore.
Ensure the hardcore is compacted in layers no greater than 200mm in thickness.
Normal concrete sets /slabs etc should have movement joints every 6m approx to allow expansion and contraction with temprature.
An induced stihl saw cut to a depth of 30mm will also help and induce any natural cracking drying out to be directed to that particular point.

Movement joints shall have 12-15mm expansion foam full depth of slab or no less than 150 if slab is greater and ensure reinforcement is set back at a minimum of 75mm from the joint.

Hope this helps , if you require further information please feel free to write.

Regards
Bill  

Building Homes or Extensions

All Answers


Answers by Expert:


Ask Experts

Volunteer


Bill-C

Expertise

Questions on UK construction from Setting out Projects through to completion. Mainly concreting ,drainage ,bricklaying, masonry,carpentry and decorating,plaster work ,render/roughcasting.From new build construction to historical restoration, renovation. How to set out ,levelling and survey matters.

Experience

Timeserved bricklayer , developing to Construction Site Manager and Educated to Site Engineer. Having been in the Industry for 35 years carrying out all types of general construction . renovation and historical renovation and remedial works.Now mainly on luxury dwellings to the value of £2M. Having been self employed and advising main Contractors and Developers through Construction phases and managing the works from concept to completion.Having a broad spectrum of experience.

Education/Credentials
Scottish Apprenticeship in the crat of bricklaying. Scottish Construction Industry Site Managers Site Civil Engineering Construction and Surveying Set out. Scottish Civil Engineering Analysis of Concrete and Mortar Asbestos encountering. Scaffolding Inspectors Certification Planning, Programming and Management

©2012 About.com, a part of The New York Times Company. All rights reserved.