Is there any precedent concerning an exclusion in a quote when the contract documents clearly state the work to be done? We use the AIA documents and are located in Georgia

Dear Paul (Georgia, USA)
Thank you for your question.  There are hundreds, if not thousands, of legal precedents concerning latent ambiguities in contract documents, including those issued by AIA.  Virtually all disputes arising out of what is, or is NOT, included in the definition of the scope of work revolve around such latent ambiguities which were missed, or not discovered, prior to the bid submittals and bid acceptance.  And certainly, some of the disputed contracts contain exclusion clauses, which tend to exclude certain work from the contract either by geographic coverage limits (Stationing, say 123+45.67, graphical depictions or foot print, say 1-foot outside foundation wall, or elevations, say, all work except 3-rd floor).  Based on the general nature of your query, I cannot be more specific.  But, generally, exclusion clauses are used and are fine contractual mechanism, except when they create more problems in interpretation.
I do not think it helps your question any, but this is best I can do here to relate to the way you framed your query.

Gerry Sverdlin, PE, Esq.
Doha, Qatar

Construction Law

All Answers

Answers by Expert:

Ask Experts


Gerry Sverdlin


Questions I can answer or provide assistance to reflect the following subjects: contract terms and conditions, interpretation of ambiguity, construction management and practices, claims for costs and time, variation / change orders, disputes, dispute resolution techniques and organizations, claims for extra work or materials, delay analysis, disruption or interference, defective design and negligent supervision, construction risks and mitigation, warranties and insurance. Questions I can NOT answer: too numerous to list here.


Mr. Sverdlin provided over 20 years of services in dispute resolution and expert opinion of complex construction claims for extra work, delay & acceleration, defective design & installation, unauthorized deviations, differing site conditions, productivity loss, labor & material shortage, owner’s interferences, force majeure, bonding, warranties and insurance coverage. Mr. Sverdlin participated in dispute resolution proceedings regarding 10 mile sub-aqueous outfall tunnel at Deer Island Treatment Plant – Boston Harbor Project, and claims arising out of construction of the South Boston / South Bay Interchanges for the Central Artery/Tunnel Project in Boston, Massachusetts, USA, and multiple proceedings Middle East. Specialties: Mr. Sverdlin established expertise in construction contract preparation under EJCDC, AIA, FIDIC and agency-specific bespoke contract frameworks: procurement administration, resolving defects in scope of work coverage, specification and estimates, change order processing, project controls & cost recovery. Engineering practice encompasses design & procurement management of highway & rail transportation systems, wastewater treatment and drainage networks, key performance indicator regimen.

2011 - CIArb Member Grade 1999 - Attorney at Law – Massachusetts Bar, BBO # 642980 1992 - Registered Professional Engineer - PE: Lic. MA-36839 - Civil Affiliated Memberships: MBA - Massachusetts Bar Association DRBF - Dispute Review Board Foundation TASA - Technical Advisory Service for Attorneys

2010 - 2011 - American University in Dubai -Grad. Sch. of Business Administration Construction Contracts, Means & Methods, Claims & Changes, Project Controls March 2009 - Chamber of Commerce, Colombo, Sri Lanka – Construction Management Seminar Changes & Claims, EOT/Delay Damages, Loss of Productivity – Measured Mile 2000- 2007– Boston Architectural Ctr & Wentworth Inst. of Technology - Construction Law 1991- 1993 - Northeastern University, Boston, MA – Land Surveying, Sewage Disposal System Numerous continuing education specialty courses Suffolk University Law School - Juris Doctor, law -1993 – 1997 Northeastern University - MS, Construction / Public Works Management - 1993 Polytechnic University - BS, Civil Engineering 1982 – 1985

Past/Present Clients
Representative Projects Dubai International Airport UAE Muscat & Salalah Int'l Airports Oman South River Dredging Mechanical Scituate, MA Permitting / Boundary Dispute (Title V) Worcester, MA Hazardous Material Site Assessment New Bedford, MA Groundwater Pollution Monitoring Burlington - Woburn, MA Hazardous Material Disposal - Site Clean-up Wrentham, MA Sewer Rehabilitation Project – STEP Abu Dhabi, UAE Dubai Metro - Road & Transportation Authority, Dubai, UAE Boston Harbor Project - Deer Island MWRA - BHP Winthrop, MA 1,200 MGD Waste-Water Treatment Plant Doha North Sewerage Treatment Works Ashghal, Doha, Qatar 254K m3/d STP, 25-km triple force mains, 33-km Interceptor Sewers 10,000 l/s PS Central Artery / Tunnel Project - MHD / MTA Boston, MA 116 lane-miles Old Colony Railroad - Commuter Rail (Boston, MA 70+ mi) Cherry St. Reconstruction Full-Depth Bridgewater, MA 2.1 mi Scenic Roads Reconstruction Town-wide Wayland, MA 8.7 mi Strawberry Hill Rd Reconstruction Full-Depth Concord, MA 1.7 mi Craigsville Beach Rd Reconstruction Full-Depth Hyannis, MA 3.4 mi Water Main Replacement Southborough, MA EMAAR – Gulf III Towers, Dubai, UAE Mixed-Use Hi-Rise Peabody Properties Residential Hi-Rise Lynn, MA Bristol Properties Shopping Mall Attleboro, MA May Institute (children w/special needs) Institutional Randolph, MA Bear Hill Executive Park Commercial Waltham, MA Prospect Hill Executive Park Commercial Waltham, MA Residential Community Subdivision 128 lots Hopkinton,MA Retirement Community Subdivision Residential – 126-lots Warren,MA Independence Mall Retail Kingston, MA Mashnee Village Subdivision Residential – 54-lots Buzzards Bay, MA Hyannis Industrial Park Heavy Commercial

©2016 All rights reserved.