Question
Dear Sir,

In our Contract which is based on 2010 FIDIC MDB Harmonized Conditions of Contract and a remeasurement Contract. It was observed that there is a discrepancy between the Bill of Quantities and Drawings/Technical Specifications. Drawings & Specifications shows that a RCC parapet wall is to be constructed on both sides of the bridge but relevant Bill of BoQ does not contain any such item instead a GI Pipe railing item is included which is not relevant to requisite work.

Preamble to BoQ does not explain this issue. However Sub-Clause 12.3 [Evaluation] states that if there is no such item of work in BoQ then the appropriate rate or price shall be the rate specified for similar work. It was noticed that the no similar work as per Sub-Clause b(iii) was available in the BoQ.

How this issue to be resolved/ remedied under the Contract?

I feel that Only Sub-Clause 12.3 (b) addressed this issue by evaluating a new rate of work. Conditions (ii) & (iii) are fulfilled but question is how the Engineer will issue Instruction for Variation in order to fulfill criteria (i) because this work is already specified in the Drawings & Specifications and these have priority over Bill of Quantities as per Sub-Clause 1.5 GCC.

Please advise.

Regards,

UMER SHABBIR

Answer
Dear Umer,


Thank you for your question.

Firstly, Works must executed as described in Drawings and Specifications.

Hence, that "RCC parapet wall" is not something new, it is already included in the Contract, there is no justification for a Variation Order - as you well spotted it yourself.

As such, the price for constructing the RCC parapet wall, must be already included in the Accepted Contract Price.

It is regretfully that Contractor did not properly scrutinized the Specifications, Drawings and BoQs at tendering time, but now, they have to live with that.

Unless, the Employer/ Engineer, agree to help the Contractor, but purely because of their good hearth and not under the Contract.

Sorry I can not give a more useful answer, but that is the situation the Contractor is in.

Hope the answer will at least help in properly understanding the situation.

Construction Law

All Answers


Answers by Expert:


Ask Experts

Volunteer


Florin NICULESCU

Expertise

Questions related to Civil Engineering Contracts, using FIDIC or other Conditions of Contract, concerning Procurement procedures and documents (pre-qualification, tendering and contracting) and Services/ Works Contracts implementation matters including Determinations, Payments, Time Extensions, VOs, Claims/Disputes. Additionally, questions related to dealing with International Financing Institutions. Can also answer questions in Romanian. Can not answer improperly formulated questions.

Experience

Over 20 years of experience in the field of design, works supervision, construction, management of aid funds and technical assistance for various types of contracts implementation, including severe conflictual contractual situations leading to Claims and disputes. Claims/ Contract management, Disputes adjudication, Arbitration.

Organizations
Member of Romanian Professional Association of Roads and Bridges; Listed on President's List of Adjudicators of Romanian Association of Consulting Engineers www.aric.org Former member of the Disputes Resolution Board Foundation (DRBF) of United States – nominee on DRBF President’s Disputes Board Members List www.drb.org and of DRBF Chapter for Eastern Europe http://dabdrb.googlepages.com Former member of Polish Association of Consulting Engineers (SIDiR) – nominee on SIDiR President’s Disputes Board Members National List http://www.sidir.pl/sidir/index.php?action=czlonkowie&a2=r Member of “AllExperts.com” volunteers pool http://www.allexperts.com/user.cgi?m=4&expID=85358&catID=914 Member of the "Constructions Disputes Resolution Services” International Panel of Construction ADR Specialists" of United States www.constructiondisputes-cdrs.com

Education/Credentials
- Graduate in 1994 the Construction Institute - Graduate of several FIDIC,Procurement and other courses - Graduate of first Disputes Board Members Mentoring Scheme (http://www1.fidic.org/resources/adjudicators/pupilage.html) - FIDIC Accredited Adjudicator

Past/Present Clients
- Several State organisations/Ministries , such as Ministry of Transport, National Admistration of Roads, Ministry of Regional Development (former Ministry of European Integration), Public Works and Housing, Central Contracting and Financing Unit in Romania and also in Turkey, Croatia and Macedonia - Numerous Western based private consultancy companies - full CV and other relevant information available at www.abinitio.ro

©2016 About.com. All rights reserved.