Construction Law/Questions

SubjectDate AskedExpert
Taking over cert.3/22/2012Peter M. Elliott
Construction tenders evaluation3/21/2012Daniel Kazado
Performance Bond3/20/2012Peter M. Elliott
Performance Bond - Fidic (1999) - Red Book3/20/2012ALI IRVALI
Question on variation works3/20/2012Florin NICULESCU
design by nominated subcontractor3/19/2012John Dowse
omission for an item unavailble in tender drawings3/19/2012ALI IRVALI
Variation Claim3/19/2012Peter M. Elliott
Variation Order3/19/2012Liaqat Hayat
variation order3/17/2012John Dowse
Calendar vs Working Days3/16/2012Mike Testro
Material samples return3/15/2012John Dowse
RENTENTION IN CONSTRUCTION INDUSTRY3/15/2012John Dowse
Omission/ FIDIC 1999 YELLOW BOOK3/15/2012Peter M. Elliott
Fidic red book3/15/2012Peter M. Elliott
professional fees3/14/2012Peter M. Elliott
Omission/ FIDIC 1999 YELLOW BOOK3/14/2012Peter M. Elliott
Fidic red book3/13/2012Peter M. Elliott
Fidic red book3/13/2012Peter M. Elliott
Price adjustment clause 70.13/13/2012Liaqat Hayat
Fidic Clause 70.13/13/2012Wael Ghadban
Price adjustment clause 70.13/13/2012Liaqat Hayat
termination by employer and no return of performance bond3/12/2012Peter M. Elliott
Contract Claim Period3/12/2012Peter M. Elliott
Payment of materials offsite3/12/2012Alina Valentina Oprea
delay damages3/11/2012ALI IRVALI
Pn3/10/2012Senthil Kumar Sellamuthu
construction - extension of time3/9/2012Ashish Gurav
about silver book3/8/2012Alina Valentina Oprea
FIDIC 1987 Fourth Addition3/8/2012Wael Ghadban
Turnover3/8/2012Senthil Kumar Sellamuthu
FIDIC 1987 Fourth Addition3/7/2012Wael Ghadban
termination by employer and no return of performance bond3/7/2012Peter M. Elliott
delay damages3/6/2012ALI IRVALI
FIDIC Omission and New Rate Calulation3/6/2012ALI IRVALI
Re-measurement under FIDIC 99 Red Book3/6/2012Peter M. Elliott
Construction law3/5/2012Bogdan Oprea
time at large3/5/2012Senthil Kumar Sellamuthu
Variation and new contract sum3/3/2012Florin NICULESCU
adverse weather3/2/2012Florin NICULESCU
Negative change order3/1/2012Wael Ghadban
adverse weather3/1/2012Florin NICULESCU
Claims Reservation Paragraphs3/1/2012John Dowse
Time Control3/1/2012Wael Ghadban
eot & time at large2/29/2012Mike Testro
Time Control2/28/2012Wael Ghadban
Omission of Contractor's scope2/28/2012Senthil Kumar Sellamuthu
Construction Law2/28/2012Bogdan Oprea
Notices2/28/2012Florin NICULESCU
Variation - Omission2/27/2012Senthil Kumar Sellamuthu
Interpretation of contract documents in case of discrepancy2/27/2012John Dowse
Prime cost sums2/27/2012Mike Testro
Delays by both parties & concurrency evident2/27/2012John Dowse
EOT claims2/26/2012Liaqat Hayat
Delays by both parties & concurrency evident2/26/2012John Dowse
Extension of Time2/26/2012Mike Testro
Performance Guarantee2/26/2012Wael Ghadban
the Employer's own contractor2/25/2012Peter M. Elliott
Interpretation of contract documents in case of discrepancy2/25/2012John Dowse
Rate Only2/24/2012Senthil Kumar Sellamuthu
Monthly payment clause 60.2 FIDIC 19872/24/2012Wael Ghadban
lump sum tender vs BQ tender2/23/2012Senthil Kumar Sellamuthu
Monthly payment clause 60.2 FIDIC 19872/23/2012Wael Ghadban
Monthly payment clause 60.2 FIDIC 19872/23/2012ALI IRVALI
Construction Law2/23/2012Bogdan Oprea
Variation in LS contract2/22/2012John Dowse
cost control engineer2/22/2012Liaqat Hayat
COST CONTROL ENGINEER2/22/2012Senthil Kumar Sellamuthu
Variation under FIDIC R.B. SCl 13.12/21/2012Peter M. Elliott
Variation under FIDIC R.B. SCl 13.12/20/2012Peter M. Elliott
compensation cost of external aggregate brought at site2/20/2012Liaqat Hayat
Subcontract termination2/18/2012John Dowse
Difference in contracts2/18/2012Senthil Kumar Sellamuthu
the Employer's own contractor2/17/2012Peter M. Elliott
Clause-70.1 Price Adjustment2/16/2012Liaqat Hayat
Clause 70.12/16/2012Wael Ghadban
provisional sum2/15/2012John Dowse
Fixed Paridity2/15/2012ALI IRVALI
POMI2/14/2012Wael Ghadban
price adjustment2/14/2012Liaqat Hayat
Commencement date2/14/2012Peter M. Elliott
Degree of importance of Pre-Tender Meeting2/14/2012Alina Valentina Oprea
Commencement date2/13/2012Peter M. Elliott
Defects Liability2/13/2012Senthil Kumar Sellamuthu
Withholding Tax Burden2/13/2012Liaqat Hayat
CONTRCTOR'S CLAIMS2/13/2012ALI IRVALI
Withholding Tax Burden2/13/2012Liaqat Hayat
Time being at large in FIDIC red book contracts2/12/2012Wael Ghadban
POMI2/12/2012Wael Ghadban
Breach in contract due to non payment of interim certificate2/11/2012Florin NICULESCU
pc rate2/11/2012John Dowse
Notice of penalty for delay.2/10/2012Mike Testro
DAY WORKS SHEETS2/10/2012Peter M. Elliott
Drawing descrepancies2/8/2012Mike Testro
document priority2/8/2012Wael Ghadban
Clause 14 programme2/8/2012Florin NICULESCU
Advance Payment2/8/2012Florin NICULESCU
Factor C calculation for diesel consumption2/7/2012Senthil Kumar Sellamuthu
pc rate2/6/2012John Dowse
Provisional item2/6/2012Wael Ghadban
Work to be excuted by other nominated contractors.2/6/2012John Dowse
Over laps for reinforcement in Slabs,Beams etc.,2/5/2012Liaqat Hayat
Clause 1.9 of FIDIC General Conditions of Contract2/5/2012John Dowse
FIDIC 1999 - DAB Provisions2/5/2012Alina Valentina Oprea
EOT - Prolongation Claim2/3/2012Peter M. Elliott
international bidding projects Measurement2/3/2012ALI IRVALI
letter of credit in FIDIC2/2/2012Peter M. Elliott
Fidic 1992 - clause 52.1 - instruction to increase qty2/2/2012Peter M. Elliott
FIDIC Red Book2/2/2012Liaqat Hayat
The right of sub contractor to apply new rates to Contract BOQ2/2/2012John Dowse
international bidding projects Measurement2/2/2012ALI IRVALI
liability of architect in defects2/2/2012Wael Ghadban
FIDIC Redbook 1999 Clause 16.2 and 19.6 Termination by Contractor2/1/2012Peter M. Elliott
extention of time - fidic 19992/1/2012Ashish Gurav
Performance Garantee2/1/2012Alina Valentina Oprea
Reducing the supply scope2/1/2012Florin NICULESCU
FIDIC Redbook 1999 Clause 16.2 and 19.6 Termination by Contractor1/31/2012Peter M. Elliott
Performance Garantee1/31/2012Alina Valentina Oprea
Reducing the supply scope1/31/2012Florin NICULESCU
Deductions.1/27/2012Senthil Kumar Sellamuthu
Deductions.1/27/2012Ashish Gurav
Programe of works1/27/2012Wael Ghadban
Additional Claims for Variation1/25/2012Senthil Kumar Sellamuthu
Fixed Sum in BOQ1/24/2012ALI IRVALI
Contractor to bear travel costs1/24/2012Florin NICULESCU
Contractor to bear travel costs1/24/2012Florin NICULESCU
Rate Enhancement1/22/2012Peter M. Elliott
FIDIC 1999 Red book clause 19.6 (b) - Dubai1/22/2012Peter M. Elliott
DAB Decision1/19/2012ALI IRVALI
performance bond and contract sum1/19/2012Ashish Gurav
Rights of the employer regarding Claim matter1/19/2012Senthil Kumar Sellamuthu
Electricity / water connections to building1/18/2012Senthil Kumar Sellamuthu
Consultant withdrwal before sustaitial completion1/18/2012Senthil Kumar Sellamuthu
Right to claim additional costs due to EoT in FIDIC 19991/18/2012Peter M. Elliott
Rate Enhancement1/17/2012Peter M. Elliott
Rate Enhancement1/17/2012Peter M. Elliott
hadis1/17/2012ALI IRVALI
BOQ Item price/amount allocated to Provisional Sum1/17/2012Senthil Kumar Sellamuthu
Contract law1/17/2012Bogdan Oprea
BOQ Item price/amount allocated to Provisional Sum1/17/2012Senthil Kumar Sellamuthu
Feasability study1/17/2012Florin NICULESCU
variation and additional work1/17/2012Senthil Kumar Sellamuthu
Discrepancy1/17/2012Senthil Kumar Sellamuthu
Discrepancy1/16/2012Senthil Kumar Sellamuthu
LIBOR application1/16/2012Daniel Kazado
Claims1/16/2012ALI IRVALI
Fidic 1999 - Engineer's Instructions1/16/2012Alina Valentina Oprea
Force Majeure1/16/2012Alina Valentina Oprea
DELAY PANALTY TO SUB CONTRACTOR1/15/2012Senthil Kumar Sellamuthu
DELAY PANALTY TO SUB CONTRACTOR1/15/2012Senthil Kumar Sellamuthu
Calling on Performance Bond1/15/2012John Dowse
B.O.Q PROSUM1/12/2012John Dowse
Drawings, Specifications & BOQ1/12/2012Peter M. Elliott
Partial Omission of Work1/11/2012Peter M. Elliott
Contract Claim1/11/2012Senthil Kumar Sellamuthu
Contract Claim1/11/2012Senthil Kumar Sellamuthu
Fidic Red Book Release of Retention1/11/2012Peter M. Elliott
Release of retention sums1/11/2012Liaqat Hayat
Drawings, Specifications & BOQ1/10/2012Peter M. Elliott
Fidic - Document priorty1/9/2012Alina Valentina Oprea
Contemporary Records1/9/2012Florin NICULESCU
Contemporary Records1/9/2012Florin NICULESCU
Reimbursement of Direct Loss and/or Expenses1/9/2012John Dowse
Suspension of the Work1/3/2012Senthil Kumar Sellamuthu
Termination of MEP Subcontractor1/2/2012Peter M. Elliott
Query related to Contract1/2/2012Peter M. Elliott
WORK PROGRAM12/31/2011Mike Testro
WORK PROGRAM12/31/2011Nasir Gilani Syed
Taking -Over Certificate12/30/2011kifle semu
Dispute12/28/2011Daniel Kazado
Variation Order12/23/2011Mike Testro
Request of Perfomance Bond12/23/2011ALI IRVALI
Interim payment Certificates12/23/2011John Dowse
Instructions/Variations+12/21/2011Peter M. Elliott
Claims for variations for a lump sum contract signed under fidic 199212/21/2011Ashish Gurav
Price reduction: plant and design build 1999 FIDIC12/20/2011Liaqat Hayat
force majeure12/19/2011Alina Valentina Oprea
Fidic12/19/2011Alina Valentina Oprea
About Discrepancies between bill of Quantities and Drawings12/17/2011John Dowse
Discrepancies between contract documents12/17/2011kifle semu
Retention12/16/2011John Dowse
time related over head cost and equipment mobiliation cost claim12/16/2011John Dowse
Discrepancies between contract documents12/16/2011kifle semu
About Discrepancies between bill of Quantities and Drawings12/16/2011John Dowse
force majeure12/15/2011Alina Valentina Oprea
PC RATE12/15/2011Ashish Gurav
Defition of “prolongation” and “prolongation cost”12/15/2011ALI IRVALI
Fidic12/14/2011Alina Valentina Oprea
Termination of Contract12/14/2011Mike Testro
Fidic RedBook 1999 _ Potensial Claim Sale12/13/2011Peter M. Elliott
Contract Conditions [FIDIC 2006 March Edition]12/13/2011ALI IRVALI
Payment of Materials on site12/12/2011Peter M. Elliott
Contract Conditions [FIDIC 2006 March Edition]12/12/2011ALI IRVALI
Construction Law12/12/2011Ashish Gurav
Construction Law12/12/2011Liaqat Hayat
BQ Error12/11/2011Peter M. Elliott
Payment of Materials on site12/10/2011Peter M. Elliott
Re-measured Contract12/10/2011Ashish Gurav
Contract specification versus department specification12/8/2011ALI IRVALI
Additional Prliminary Costs12/7/2011John Dowse
Delay Payment12/7/2011Ashish Gurav
Contract Documents12/7/2011John Dowse
Variations12/6/2011Peter M. Elliott
Insurence Fidic clause 1812/6/2011Peter M. Elliott
IPC12/5/2011Senthil Kumar Sellamuthu
Time extenstion12/4/2011Ashish Gurav
Time extenstion12/4/2011Peter M. Elliott
Delay Payment12/3/2011Ashish Gurav
Interim Payment Application - FIDIC 2006 March edition12/2/2011ALI IRVALI
Interim payment Certificate12/2/2011Alina Valentina Oprea
Delay Payment11/29/2011Liaqat Hayat
Who is Guilty?11/28/2011John Dowse
All risk insurance11/27/2011Peter M. Elliott
All risk insurance11/27/2011Alina Valentina Oprea
kitchen extension11/26/2011Alina Valentina Oprea
kitchen extension11/26/2011Liaqat Hayat
Force maejure after expiry of defects liability period11/25/2011Peter M. Elliott
Contract specification versus department specification11/25/2011ALI IRVALI
Mark up on payments to a nominated sub contractor.11/24/2011Peter M. Elliott
Who is Guilty?11/24/2011John Dowse
Sub-clause 8.3. Programme11/24/2011Peter M. Elliott
Right of Access11/24/2011Peter M. Elliott
Stormwater DWG Vs Irrigation DWG11/24/2011Liaqat Hayat
Contract specification versus department specification11/24/2011ALI IRVALI
Damage Claim11/23/2011Florin NICULESCU
As built drawings for final bill11/23/2011Alina Valentina Oprea
Insurance after Handingover of works11/23/2011ALI IRVALI
Termination of Contract - Valuation of material11/22/2011Florin NICULESCU
EoT11/21/2011Peter M. Elliott
Force maejure after expiry of defects liability period11/21/2011Peter M. Elliott
FIDIC MARCH 2006. clause 12.3 (iii). New Rate in Variations Orders11/21/2011Daniel Kazado
General Preliminaries11/21/2011John Dowse
Difference between EPC and Turnkey11/20/2011Liaqat Hayat
Premature Termination of Main Contract11/20/2011Mike Testro
Laws in quantity survey11/19/2011Liaqat Hayat
Descripancy between Contract Drawings and Bill of Quanties11/19/2011Peter M. Elliott
Right to claim additional costs due to EoT in FIDIC 199911/18/2011Peter M. Elliott
Ommision of Work11/18/2011Peter M. Elliott
reduction in scope11/18/2011Ashish Gurav
Activities for Defects liability period11/17/2011Liaqat Hayat
FIDIC '87 - Materials On Site Payment11/17/2011John Dowse
Variation Order Equipment and tools11/16/2011Mike Testro
Additional work11/16/2011Liaqat Hayat
sub contractor and Supplier11/16/2011Peter M. Elliott
payment as per as built drawings11/16/2011John Dowse
As built Drawings use for payment in remeasure contract11/16/2011ALI IRVALI
FIDIC '87 - Materials On Site Payment11/15/2011John Dowse
Cost benifit analysis11/14/2011Senthil Kumar Sellamuthu
Entitlement11/13/2011John Dowse
Payment of Material delivered on Site under FIDIC Silver11/10/2011Alina Valentina Oprea
contingency payment11/6/2011Peter M. Elliott
Final Payment in FIDIC 1999 Design & Build11/6/2011Alina Valentina Oprea
Return of the performance security11/4/2011John Dowse
Application of 4.12 and 17.3(h)11/4/2011ALI IRVALI
FIDIC 87/92 and FIDIC9911/3/2011Daniel Kazado
CLAIMS UNDER EXTENSION OF TIME11/2/2011Peter M. Elliott
FIDIC (yellow book 1999)11/2/2011Peter M. Elliott
Advance payment11/1/2011Alina Valentina Oprea
2.4-Employer's financial arrangement11/1/2011ALI IRVALI
FIDIC 87/92 and FIDIC9911/1/2011Daniel Kazado
Providing allegation of Delays in a piece-meal mode10/31/2011John Dowse
Providing allegation of Delays in a piece-meal mode10/29/2011John Dowse
Notice of Delay, Notice to Claim and CLaim for EOT10/29/2011Florin NICULESCU
Law in construction industry10/28/2011Senthil Kumar Sellamuthu
Suspension/Stop of Work10/27/2011Mike Testro
Fidic10/27/2011Alina Valentina Oprea
outragious back charges10/26/2011Alina Valentina Oprea
Engineer to Omit Item which is Not in BOQ but shown in Drawing10/25/2011Peter M. Elliott
BOQ Rate uplift10/25/2011ALI IRVALI
FIDIC sub-Clause 1.9 and Engineer's Instructions10/24/2011Peter M. Elliott
Claims under FIDIC MDB version 200610/24/2011John Dowse
Payment of Items not in the BOQ10/24/2011Peter M. Elliott
Payment of Items not in the BOQ10/22/2011Peter M. Elliott
FIDIC sub-Clause 1.9 and Engineer's Instructions10/22/2011Peter M. Elliott
HOW TO GO FOR ARBITRATION10/21/2011Florin NICULESCU
HOW TO GO FOR ARBITRATRION10/21/2011Alina Valentina Oprea
FIDIC CONDITIONS OF SUB - CONTRACT10/20/2011ALI IRVALI
Liquidated damage for delay10/20/2011John Dowse
Quantity Surveying10/19/2011ALI IRVALI
Liquidated damage for delay10/19/2011Mike Testro
FIDIC Yellow Book10/19/2011Peter M. Elliott
Preliminaries10/19/2011Florin NICULESCU
Preliminaries10/19/2011Florin NICULESCU
Fidic 1999 - Extension of Tme Notices10/18/2011John Dowse
taking over certificate10/18/2011John Dowse
add/omit variation10/18/2011Peter M. Elliott
Time at large10/17/2011Mike Testro
engineer decision10/17/2011John Dowse
engineer decision10/17/2011Peter M. Elliott
Variation in scope of work after Amendment in CA10/15/2011ALI IRVALI
Re-measurable Contract10/15/2011Peter M. Elliott
Arbitrators jurisdiction10/14/2011Liaqat Hayat
Time at large10/14/2011Mike Testro
Re-measurable Contract "Lump Sum" Items10/13/2011Peter M. Elliott
descrepency10/12/2011Shan Greer
Doctrine of Mitigation10/11/2011John Dowse
Minutes of Meeting10/11/2011John Dowse
FIDIC short form 199910/11/2011Liaqat Hayat
Provisional Sum in FIDIC 199910/10/2011John Dowse
Advance Payment10/10/2011Florin NICULESCU
Advance Payment10/10/2011Alina Valentina Oprea
Treatment of Advance Payment10/9/2011Peter M. Elliott
Adding a Provisional Sum Post Contract10/9/2011John Dowse
Treatment of Advance Payment10/8/2011Peter M. Elliott
Additional cost for delay10/8/2011Mike Testro
failure to give notice for EOT10/8/2011Peter M. Elliott
Financial charge for Accelaration cost10/7/2011ALI IRVALI
Doctrine of Mitigation10/7/2011John Dowse
Partial Handover10/7/2011Peter M. Elliott
Provisional Sum in FIDIC 199910/6/2011John Dowse
Partial Handover10/6/2011Florin NICULESCU
FIDOC red or yellow10/6/2011Florin NICULESCU
Productivity loss10/5/2011Mike Testro
Performance bond10/5/2011Peter M. Elliott
Financial charge for Accelaration cost10/5/2011ALI IRVALI
Written notice of claim and minutes of meetings10/3/2011John Dowse
Concurrent Delay10/3/2011Peter M. Elliott
Variations exceeding 15% of contract value10/1/2011Peter M. Elliott
Material/Sub-Contract Submittal/Approval9/29/2011Nasir Gilani Syed
Deduction for Lumpsum Contract without BoQ Date Asked: 2011-08-249/29/2011Peter M. Elliott
DAB decision-IPA-suspension of works by Contractor9/28/2011Peter M. Elliott
retention money9/28/2011Peter M. Elliott
Engineer's instructions out of its authority9/28/2011Peter M. Elliott
Nominated/Domestic Payments9/27/2011John Dowse
Contractor asking for a loan from the Employer9/26/2011Alina Valentina Oprea
Fidic Red Book Extension of Time9/23/2011Bogdan Oprea
additional cost in officially extended period by employer9/23/2011Peter M. Elliott
additional cost in officially extended period by employer9/23/2011Shan Greer
additional cost in officially extended period by employer9/23/2011Florin NICULESCU
contractors contract9/23/2011John Dowse
FIDIC 1999 Redbook Remedies for persistent under certification9/22/2011Peter M. Elliott
FIDIC's applications9/21/2011Florin NICULESCU
DIRECT OR INDIRECT LABOUR9/21/2011ALI IRVALI
Quantity decreased more than 25%9/21/2011John Dowse
Authority Delay9/21/2011ALI IRVALI
FIDIC, termination of contract by Employer9/20/2011Florin NICULESCU
FIDIC, termination of contract by Employer9/20/2011Florin NICULESCU
Authority Delay9/20/2011ALI IRVALI
release retention when TOC is issued for part of works9/19/2011John Dowse
safety issue9/17/2011Bogdan Oprea
fidic 19879/17/2011John Dowse
FIDIC 19879/17/2011Liaqat Hayat
Valuation unit rate9/16/2011ALI IRVALI
Fixed Price - No escalation - Project Delay9/14/2011Florin NICULESCU
FIDIC 1987 Cl. 13.19/14/2011Peter M. Elliott
Termination Notice from Subcontractor to Contractor9/13/2011ALI IRVALI
construction law-building specifications9/13/2011Peter M. Elliott
FIDIC contract - claim for "loading" on CAR9/13/2011Peter M. Elliott
Price escalation9/12/2011Liaqat Hayat
Employer's Claim9/12/2011Peter M. Elliott
Termination Notice from Subcontractor to Contractor9/12/2011ALI IRVALI
Interpretation Clasue 14.99/12/2011Florin NICULESCU
Price escalation9/11/2011Liaqat Hayat
About preliminary claims9/11/2011Nasir Gilani Syed
Fixed price - No escalation9/9/2011Florin NICULESCU
Advance Payment9/9/2011Alina Valentina Oprea
Time extension9/8/2011kifle semu
not approved interim certificate9/8/2011Florin NICULESCU
Fixed price - No escalation9/7/2011Florin NICULESCU
Fixed price - No escalation9/7/2011Florin NICULESCU
15 % Omission of work9/7/2011Alina Valentina Oprea
lump sum contract9/7/2011Peter M. Elliott
Lump Sum contract, dispute over extras9/6/2011Peter M. Elliott
Lump Sum contract, dispute over extras9/5/2011Peter M. Elliott
Extension of time - Revised programme9/5/2011Liaqat Hayat
FIDIC 1999 1st Ed Clause 3.1 Engineers Duties9/3/2011Peter M. Elliott
FIDIC "Red Book" 1999 Edition Sub-Clause 12.39/3/2011Peter M. Elliott
Accepting defects9/1/2011John Dowse
Fidic 20068/31/2011ALI IRVALI
QS calculations8/30/2011Peter M. Elliott
payment clauses8/29/2011ALI IRVALI
Sub Clause 13.8 of FIDIC 2006 MBD Harmonoized8/28/2011Liaqat Hayat
Agreed New Rates8/28/2011Peter M. Elliott
De-scope work & award to another agency8/27/2011Peter M. Elliott
EOT Prolongation8/27/2011ALI IRVALI
Adance Payment - Termination of Contract8/26/2011John Dowse
Appendix to Contract instead of Appendix to Tender8/26/2011Peter M. Elliott
delay analysis methodology8/25/2011John Dowse
QS calculations8/25/2011Peter M. Elliott
delay analysis methodology8/24/2011John Dowse
Insurance under red book 19998/24/2011kifle semu
Deduction for Lumpsum Contract without BoQ8/24/2011Peter M. Elliott
Measurement8/23/2011John Dowse
Prelims & Overhead & Profit8/23/2011Peter M. Elliott
Excess Material8/23/2011ALI IRVALI
Excess Material8/22/2011ALI IRVALI
Contract Condition8/22/2011Alina Valentina Oprea
Contract Condition8/22/2011kifle semu
Contract Condition8/22/2011Peter M. Elliott
Sub Clause 18.2 (d) of FIDIC 20068/21/2011ALI IRVALI
Day Work Rate8/20/2011Peter M. Elliott
Clause 20.18/20/2011ALI IRVALI
Prolongation Cost8/20/2011Peter M. Elliott
Sub Clause 18.2 (d) of FIDIC 20068/20/2011Florin NICULESCU
Sub Clause 18.2 (d) of FIDIC 20068/20/2011Florin NICULESCU
Sub Clause 18.2 (d) of FIDIC 20068/20/2011ALI IRVALI
Payment or Cost fiddic 99 clause 208/19/2011ALI IRVALI
Time Extension/FIDIC 19998/17/2011Alina Valentina Oprea
clause 208/17/2011ALI IRVALI
Clause 20.1 fiddic 998/17/2011John Dowse
Engineer’s deduction form Contractor’s monthly statement8/17/2011Peter M. Elliott
Engineer’s deduction form Contractor’s monthly statement8/17/2011Florin NICULESCU
Insurance for Permanent Works8/17/2011Peter M. Elliott
Site Instruction8/16/2011Peter M. Elliott
Un necessary rejections from consultant8/16/2011ALI IRVALI
Insurance for Permanent Works8/15/2011Peter M. Elliott
lump sum contract8/13/2011Liaqat Hayat
Effective Contract Price8/12/2011Liaqat Hayat
OVERHEAD for Prolongation8/12/2011John Dowse
BOQ Quantities Vs Actual8/12/2011John Dowse
BOQ Quantities Vs Actual8/11/2011John Dowse
% of OH and profit to apply for Provisional sum when it awarded as a variation item under clause 58.2 a8/11/2011Florin NICULESCU
Extension of time.8/10/2011Peter M. Elliott
Valuation unit rate8/10/2011ALI IRVALI
Valuation unit rate8/10/2011Peter M. Elliott
Variation suggested by Contractor8/9/2011John Dowse
site clarification request and variation order8/9/2011Florin NICULESCU
site clarification request and variation order8/9/2011Peter M. Elliott
Prolongation cost8/9/2011John Dowse
variation order8/9/2011Florin NICULESCU
variation order8/9/2011Florin NICULESCU
variation order8/8/2011Peter M. Elliott
variation order8/8/2011Florin NICULESCU
site clarification request and variation order8/8/2011Peter M. Elliott
Power to fix rate8/7/2011Peter M. Elliott
Domestic subcontracting8/7/2011Peter M. Elliott
Domestic subcontracting8/7/2011Peter M. Elliott
site clarification request and variation order8/7/2011Peter M. Elliott
Builder's Works!8/4/2011John Dowse
Idle Cost and Prolongation Cost8/3/2011Senthil Kumar Sellamuthu
Termination of contract8/3/2011kifle semu
Power to fix rate8/3/2011Peter M. Elliott
Accelaration cost8/3/2011John Dowse
New rates - FIDIC 1999 Red book8/3/2011Peter M. Elliott
Preliminary and General items in construction8/2/2011Florin NICULESCU
change in quantity in re-measured contract8/2/2011Peter M. Elliott
Contract Sum7/29/2011Alina Valentina Oprea
Cummulative Payment7/28/2011Peter M. Elliott
unsuitable soil7/28/2011Peter M. Elliott
Performance Security7/25/2011Liaqat Hayat
Performance Security7/25/2011Peter M. Elliott
Performance Security7/25/2011Alina Valentina Oprea
Professional Indemnity Insurance7/25/2011John Dowse
indirect cost7/21/2011ALI IRVALI
completion certificate7/21/2011John Dowse
Value Engineering7/20/2011ALI IRVALI
Acceleration7/19/2011Peter M. Elliott
Net Cost7/18/2011ALI IRVALI
Power of Engineer to fix rate7/18/2011Peter M. Elliott
fidic 14.1-Program7/17/2011Peter M. Elliott
How to make Payment for Lump sum Project which is late handed over by employer7/16/2011John Dowse
Bid validity7/15/2011Peter M. Elliott
Employer's Requirements7/15/2011Alina Valentina Oprea
price adjustment7/15/2011John Dowse
Suspension of the Works7/14/2011Daniel Kazado
Demolition Package -Right of Ownership of residue material7/14/2011John Dowse
Advance payment recoup7/13/2011Alina Valentina Oprea
Replacement of the Engineer7/12/2011Alina Valentina Oprea
Replacement of the Engineer7/12/2011Liaqat Hayat
Employer Withholding Interim Payment7/12/2011John Dowse
negative variation7/12/2011Peter M. Elliott
Replacement of the Engineer7/12/2011Florin NICULESCU
Employer Withholding the Interim Payment of March 2011 and April 2011 (IPC 5 & 6)7/12/2011kifle semu
Employer Withholding the Interim Payment of March 2011 and April 2011 (IPC 5 & 6)7/12/2011kifle semu
price adjustment7/11/2011John Dowse
Termination7/11/2011Peter M. Elliott
variation order7/10/2011Peter M. Elliott
Termination7/10/2011Peter M. Elliott
lost of profit7/10/2011John Dowse
delay damage in period of execution time7/8/2011John Dowse
Main contractor is not processing our EOT claim7/8/2011Florin NICULESCU
Completion Certificate7/7/2011Peter M. Elliott
SUSPENSION OF THE WORKS7/7/2011John Dowse
lost of profit7/7/2011John Dowse
Additional Quantity7/7/2011Liaqat Hayat
Utility Relocation7/6/2011Florin NICULESCU
As Built Drawings7/6/2011John Dowse
As Built Drawings7/6/2011Shan Greer
Hydrology risk7/5/2011kifle semu
Conditions similar to FIDIC7/5/2011Florin NICULESCU
Unpriced Work in BOQ7/5/2011John Dowse
FIDIC - Extension Of Time7/5/2011Peter M. Elliott
Preliminaries Cost7/5/2011Daniel Kazado
Employer Entailment to Deduct7/5/2011Florin NICULESCU
Employer Entailment to Deduct7/5/2011Liaqat Hayat
Employer Entailment to Deduct7/5/2011Peter M. Elliott
Completion Certificate7/4/2011Peter M. Elliott
Escalation Claims Arising From EOT7/4/2011Peter M. Elliott
variation order7/4/2011Peter M. Elliott
Damages for late completion7/3/2011Peter M. Elliott
Material on Site7/3/2011Daniel Kazado
VARIATION IN QUANTITIES OF BOQ7/1/2011Bogdan Oprea
variation order7/1/2011Peter M. Elliott
liquidated damages and additional expences6/30/2011Peter M. Elliott
Employer's insistence on specific origin6/29/2011kifle semu
Return of Performance Guarantee6/29/2011Daniel Kazado
Adjustments for changes in costs6/29/2011Peter M. Elliott
Fidic Base Construction Contract6/29/2011Peter M. Elliott
EOT and LD6/27/2011John Dowse
Delayed Defect Liability Period6/26/2011Peter M. Elliott
Delayed Defect Liability Period6/26/2011Alina Valentina Oprea
FIDIC 1999 (Red) - Responding to Subcontractors Variation Claims6/26/2011Peter M. Elliott
Fiddic clause 12.36/25/2011John Dowse
FIDIC 1999 (Red) - Responding to Subcontractors Variation Claims6/25/2011Peter M. Elliott
Price escalation6/24/2011kifle semu
Mobilization Advance6/24/2011Liaqat Hayat
Adjustments for changes in costs6/24/2011Peter M. Elliott
FIDIC 1999 (Red) - Responding to Subcontractors Variation Claims6/23/2011Peter M. Elliott
additional preliminaries6/22/2011John Dowse
How to deal with this bad contractor?6/22/2011Peter M. Elliott
Discrepancy in the Contract Drawings Clarified on the Issued for Construction Drawings6/22/2011Peter M. Elliott
Client not interested to award the Works after issuing Letter of acceptance6/22/2011Peter M. Elliott
Clause 8.5 Delays caused by Authorities (Red Fidic)6/21/2011Alina Valentina Oprea
just starting6/19/2011John Dowse
How to deal with this bad contractor?6/18/2011Peter M. Elliott
Subcontractor to raise copy of the claim to Eng/Owner6/17/2011Florin NICULESCU
Delays caused by authorities6/17/2011John Dowse
how to change the BOQ price due to the hunge difference between site and BOQ6/16/2011Peter M. Elliott
Lump Sum Contract with Schedule of Prices & BOQ's6/16/2011Florin NICULESCU
tests after completion6/15/2011Liaqat Hayat
Lump Sum Contract with Schedule of Prices & BOQ's6/15/2011Peter M. Elliott
Lump Sum Contract with Schedule of Prices & BOQ's6/15/2011John Dowse
Lump Sum Contract with Schedule of Prices & BOQ's6/15/2011Daniel Kazado
Liquidated Damages6/15/2011Peter M. Elliott
Liquidated Damages6/15/2011Peter M. Elliott
Contract Document Discrepancies6/15/2011John Dowse
Remeasured Quantity6/14/2011Peter M. Elliott
Procedure for Variations6/14/2011Alina Valentina Oprea
Evalutation variation under FIDIC coc for construction for building and Engineering works designed by the Employer6/14/2011John Dowse
Variation Order6/13/2011Alina Valentina Oprea
Termination of Contract6/13/2011Liaqat Hayat
EOT at end of Maintenance Period6/13/2011Peter M. Elliott
Ommision of work6/13/2011Peter M. Elliott
Termination of Contract6/13/2011Daniel Kazado
Termination of Contract6/13/2011Senthil Kumar Sellamuthu
Termination of Contract6/13/2011Liaqat Hayat
Payments Delayed6/12/2011John Dowse
Variation Order6/12/2011Alina Valentina Oprea
bidding rates in three digits after decimal6/12/2011Liaqat Hayat
Joint Venture6/11/2011Peter M. Elliott
Joint Venture6/11/2011John Dowse
Joint Venture6/11/2011Alina Valentina Oprea
Price adjustment6/11/2011Liaqat Hayat
Remeasured Contract6/11/2011Liaqat Hayat
DRAWINGS ISSUE6/10/2011John Dowse
Defects Liability Period6/10/2011Liaqat Hayat
Variations - Applicable Rates ?6/9/2011Liaqat Hayat
Bid Proposal By Contractor Binding?6/9/2011John Dowse
Mistake in Lumpsum BOQ6/9/2011Peter M. Elliott
contract document6/8/2011Peter M. Elliott
Engineers duties & Authority6/8/2011Shan Greer
DRAWINGS ISSUE6/7/2011John Dowse
Prime cost rate6/7/2011Peter M. Elliott
contract document6/7/2011Peter M. Elliott
FIDIC Yellow Book 1999: Non-Availability of material and Error in Employer’s Requirement6/6/2011Senthil Kumar Sellamuthu
FIDIC Yellow Book 1999: Non-Availability of material and Error in Employer’s Requirement6/6/2011Peter M. Elliott
After Employer vis-a-vis Engineer6/6/2011Liaqat Hayat
Overtime6/6/2011Peter M. Elliott
Employer vis-a-vis Engineer6/6/2011Liaqat Hayat
Contract Law6/4/2011John Dowse
royalty charges6/4/2011Senthil Kumar Sellamuthu
BOQ6/3/2011Liaqat Hayat
Contract Rates6/3/2011John Dowse
escalation and extra claims6/3/2011Alina Valentina Oprea
warranty period6/2/2011Peter M. Elliott
Our Main Contract refused to do work6/2/2011Daniel Kazado
variation claim6/2/2011Nasir Gilani Syed
Termination By the Employer6/2/2011Alina Valentina Oprea
warranty period6/2/2011Peter M. Elliott
escalation to engineer/cotractor6/2/2011Liaqat Hayat
fidic clause 51.1,51.2,52.1,52.26/2/2011Senthil Kumar Sellamuthu
tender prices6/1/2011Peter M. Elliott
Contract law6/1/2011Senthil Kumar Sellamuthu
BOQ6/1/2011Liaqat Hayat
fidic clause 51.1,51.2,52.1,52.25/31/2011Senthil Kumar Sellamuthu
fidic clause 51.1,51.2,52.1,52.25/31/2011Alina Valentina Oprea
Employer vis-a-vis Engineer5/31/2011Liaqat Hayat
Changing the conditions of contract5/30/2011Peter M. Elliott
FIDIC - deducting penalties5/30/2011Alina Valentina Oprea
Delayed Possession of Site5/30/2011Peter M. Elliott
Contract documents & Variation5/29/2011Peter M. Elliott
hy5/29/2011Liaqat Hayat
Back-2-back principle5/29/2011Daniel Kazado
Foreign componenet5/28/2011Peter M. Elliott
Fidic5/28/2011Liaqat Hayat
liquidated damages (LD)5/28/2011John Dowse
Lump Contract Variation5/27/2011Peter M. Elliott
liquidated damages (LD)5/27/2011John Dowse
Materials Stored Off Site5/26/2011Peter M. Elliott
What consitutes a material deviation5/26/2011Shan Greer
possession of site, change of scope5/26/2011Daniel Kazado
possession of site,scope change5/26/2011John Dowse
ASSESSING THE PROJECT CLAIM5/26/2011Peter M. Elliott
escalation to engineer/cotractor5/26/2011Liaqat Hayat
payment from retension money5/26/2011John Dowse
Lumpsum contract5/26/2011Florin NICULESCU
Project cost report5/24/2011John Dowse
Possible error-Bill Of Quantities5/23/2011John Dowse
Nominated subcontractor5/23/2011John Dowse
Fidic Sub clause 52.25/23/2011John Dowse
Ommision Clause in FIDIC5/23/2011Alina Valentina Oprea
Contradition between Dwgs and BOQ5/23/2011Peter M. Elliott
FIDIC - deducting penalties5/23/2011Alina Valentina Oprea
FIDIC - deduction of penalties5/23/2011John Dowse
FIDIC - deducting penalties5/23/2011Liaqat Hayat
Adjustment Item5/22/2011Senthil Kumar Sellamuthu
compounded interst rate5/22/2011Peter M. Elliott
contract price5/21/2011Liaqat Hayat
lumpsum contract5/21/2011Shan Greer
prime cost5/21/2011Peter M. Elliott
Nominated subcontractor5/19/2011John Dowse
Variation Claim5/19/2011Peter M. Elliott
Change to site office location5/19/2011Peter M. Elliott
Advice on sub-Cl. 12.3 of FIDIC5/19/2011Alina Valentina Oprea
IPC5/19/2011Liaqat Hayat
arbitration5/19/2011Alina Valentina Oprea
Variation Claim5/19/2011Peter M. Elliott
Right to claim5/18/2011John Dowse
prime cost5/18/2011John Dowse
EOT Claim5/18/2011Peter M. Elliott
EOT Claim5/18/2011Liaqat Hayat
Contractual Issues5/17/2011Liaqat Hayat
EOT Claim5/17/2011Alina Valentina Oprea
EOT Claim5/17/2011Daniel Kazado
EOT Claim5/17/2011Liaqat Hayat
EOT Claim5/17/2011Peter M. Elliott
What constitutes construction information5/17/2011John Dowse
Ommision Clause in FIDIC5/17/2011Alina Valentina Oprea
Change to site office location5/17/2011Peter M. Elliott
Inquiry5/17/2011Liaqat Hayat
Provisional Sum5/16/2011John Dowse
Extensions of Time5/16/2011Peter M. Elliott
Inquiry5/16/2011Liaqat Hayat
Contractors claim for EOT5/16/2011Daniel Kazado
Extensions of Time5/15/2011Peter M. Elliott
Extensions of Time5/15/2011Peter M. Elliott
fidic5/14/2011Peter M. Elliott
Contractual claims5/12/2011Peter M. Elliott
ncr5/12/2011John Dowse
Change of scope of works by clint5/11/2011Liaqat Hayat
Contract Termination5/11/2011Alina Valentina Oprea
Tender5/11/2011Liaqat Hayat
Contract Law5/11/2011Florin NICULESCU
cancellation of subcontract agreement5/10/2011John Dowse
VO for electrical work5/9/2011Florin NICULESCU
reduction in contract value5/9/2011John Dowse
EOT claim plus Margin5/9/2011Liaqat Hayat
Contracts not referring FIDIC5/9/2011Alina Valentina Oprea
Contracts Not Referring to FIDIC5/9/2011Liaqat Hayat
Clause 20 Care of Works and Clause 21 Insurance of Works etc5/9/2011Florin NICULESCU
Margin on EOT claim5/9/2011Florin NICULESCU
Getting paid5/8/2011John Dowse
performance security5/7/2011Bogdan Oprea
Penalties5/6/2011Peter M. Elliott
termination of contract by employer5/6/2011John Dowse
overhead cost and profit5/6/2011Liaqat Hayat
Overhead & Profit5/5/2011Peter M. Elliott
Fidic Red book: Conditions of Contract for Construction5/5/2011Daniel Kazado
oil price increased5/5/2011John Dowse
COPA SUB CLause 52.2 engrs power to fix rate5/5/2011John Dowse
Cancellation of Contract termination5/5/2011John Dowse
Cancellation of Contract termination5/5/2011Alina Valentina Oprea
Cancellationj of Contract Termination5/5/2011Liaqat Hayat
Canellation of contract termination5/5/2011Peter M. Elliott
Cancelling the termination5/5/2011Florin NICULESCU
FIDIC 1999, alternative rand names5/4/2011Alina Valentina Oprea
Traffic diversion & Managment5/4/2011John Dowse
Taking over Certificate5/3/2011Peter M. Elliott
C factor5/3/2011Liaqat Hayat
FIDIC Conditions of contract5/2/2011Alina Valentina Oprea
oil price increased5/2/2011Alina Valentina Oprea
applicable law4/30/2011Florin NICULESCU
Calculation of Factor 'C'4/29/2011Liaqat Hayat
provisional sums4/28/2011Florin NICULESCU
Liquidated Damges4/27/2011John Dowse
if contract terminated4/27/2011Daniel Kazado
Factor4/26/2011Liaqat Hayat
Preliminary and general4/26/2011Florin NICULESCU
if contract terminated4/26/2011Daniel Kazado
Fixed Rate Item4/26/2011Liaqat Hayat
Claim for Prolongation - Subcontractors Costs.4/26/2011John Dowse
Price escalation of material in Fixed Lump sum contract4/25/2011Alina Valentina Oprea
Fixed Rate Item4/25/2011Liaqat Hayat
Unilaterally Dealing With Closed Contracts4/23/2011Alina Valentina Oprea
Claim new rate4/23/2011Liaqat Hayat
escalation4/22/2011Liaqat Hayat
FIDIC construction 1999 first edition designed by employer4/21/2011Peter M. Elliott
Retention Release4/21/2011Peter M. Elliott
EOT for Employer Risk4/21/2011Peter M. Elliott
Payment of Retention Money4/21/2011Peter M. Elliott
Addendum to Contract Agreement.4/20/2011Liaqat Hayat
Unilaterally Dealing With Closed Contracts4/19/2011Alina Valentina Oprea
Quantifying Prolongation Cost4/19/2011Peter M. Elliott
price adjustment4/19/2011Florin NICULESCU
Negative Variation under Lump Sum Contract4/19/2011Peter M. Elliott
lump sum contracts4/18/2011John Dowse
termination of contract by contractor4/18/2011Peter M. Elliott
FIDIC Variation4/18/2011Florin NICULESCU
FIDIC Variation4/18/2011Florin NICULESCU
Fidic-99 Construction Programme Approval4/17/2011Peter M. Elliott
EOT4/17/2011Alina Valentina Oprea
FIDIC Red Book 1999 Contract Extension Problem4/16/2011Florin NICULESCU
FIDIC Red Book 1999 Contract Extension Problem4/16/2011Alina Valentina Oprea
FIDIC Red Book 1999 Contract Extension Problem4/16/2011Shan Greer
FIDIC Red Book 1999 Contract Extension Problem4/16/2011John Dowse
FIDIC Red Book 1999 Contract Extension Problem4/16/2011Liaqat Hayat
FIDIC Red Book 1999 Contract Extension Problem4/16/2011Daniel Kazado
Negative Change orders4/16/2011Liaqat Hayat
Replacement of Engineer by Employer with an Employee4/14/2011Liaqat Hayat
Replacement of Engineer by Employer with an Employee4/14/2011Peter M. Elliott
Provisional Sum4/14/2011Liaqat Hayat
FIDIC 1999 1st Ed - Matls On Site4/13/2011Peter M. Elliott
Provisional Sum4/13/2011Liaqat Hayat
Can MC can claim delay due to expedited programme when the NSC is well with in Cl 14 programme4/12/2011Alina Valentina Oprea
Adjustment for Cost4/12/2011John Dowse
Adjustment for Cost4/12/2011Liaqat Hayat
Provisional Sum4/12/2011Liaqat Hayat
CLOSED CONTRACT4/11/2011Florin NICULESCU
Unilaterally Dealing With Closed Contracts4/11/2011Alina Valentina Oprea
Termination4/11/2011Peter M. Elliott
Site Instruction & Variation Order4/10/2011Bogdan Oprea
Guarantees and Securities4/10/2011Florin NICULESCU
Extension of time4/10/2011Peter M. Elliott
Commencement of work4/10/2011Liaqat Hayat
Negative Variation4/10/2011Peter M. Elliott
Commencement of work4/9/2011Liaqat Hayat
EOT related claims4/8/2011Liaqat Hayat
EOT related claims4/7/2011Liaqat Hayat
EOT related claims4/7/2011Liaqat Hayat
variation valuation4/7/2011Peter M. Elliott
Variation - Quantities4/6/2011Florin NICULESCU
Extreme increse in executed quantity4/6/2011Florin NICULESCU
variation on piles4/6/2011Daniel Kazado
Home building4/6/2011Peter M. Elliott
Follow up question on EOT4/5/2011Peter M. Elliott
Mobilisation vs Advance Payment4/5/2011Florin NICULESCU
Variation - Quantities4/5/2011Florin NICULESCU
Negative Variation4/5/2011Florin NICULESCU
Negative Variation4/5/2011Peter M. Elliott
variation valuation4/5/2011Peter M. Elliott
variation valuation4/5/2011Liaqat Hayat
Clause 20.3 - Failure to Agree on the Composition of the Dispute Board4/5/2011Alina Valentina Oprea
Late Claim for Extension of Time4/4/2011Alina Valentina Oprea
variation on piles4/4/2011Daniel Kazado
claims4/4/2011Florin NICULESCU
FIDIC contract validity4/4/2011Bogdan Oprea
claims4/4/2011Florin NICULESCU
Daywork and its variation, fidic 19994/3/2011Peter M. Elliott
Daywork and its variation, fidic 19994/3/2011Liaqat Hayat
Daywork and its variation, fidic 19994/3/2011Nasir Gilani Syed
Reduce rate of progress4/2/2011Peter M. Elliott
Client rights4/2/2011Peter M. Elliott
claims4/2/2011Florin NICULESCU
Reduce rate of progress4/1/2011Peter M. Elliott
Abount Lump Sum Contract3/31/2011Daniel Kazado
Contract Termination3/31/2011Florin NICULESCU
JCT98 SBC Provisional Sums3/30/2011John Dowse
Contract Termination3/30/2011Florin NICULESCU
IPC3/30/2011Alina Valentina Oprea
Release of Performance Bond3/29/2011John Dowse
Advance payment as a subcontractor, what are the options?3/28/2011John Dowse
Clearing & Grabbing including unsuitable material or not3/28/2011Florin NICULESCU
Procedure of claim for payment of general items in Bill 13/28/2011Liaqat Hayat
Withhold IPC3/28/2011John Dowse
Procedure of claim for payment of general items in Bill 13/27/2011Liaqat Hayat
Request for clarification3/27/2011Florin NICULESCU
DAB3/27/2011Alina Valentina Oprea
refuse program schedule due to hide resorcess information3/26/2011Florin NICULESCU
Force Mejure / Employer Risk3/26/2011Alina Valentina Oprea
prolongation claim3/26/2011Liaqat Hayat
Sub Contracting3/25/2011Florin NICULESCU
lump sum, variation3/25/2011Shan Greer
extension of time and delay damage3/24/2011John Dowse
extension of time and delay damage3/24/2011Florin NICULESCU
extension of time and delay damage3/24/2011Florin NICULESCU
Tendering procedure for missing item and Qty adjustments.3/24/2011Florin NICULESCU
Risk and responsibility3/24/2011Liaqat Hayat
Risk and responsibility3/24/2011Shan Greer
extension of time and delay damage3/23/2011Florin NICULESCU
refuse nominated subcontractor3/23/2011Liaqat Hayat
Interpretation3/23/2011Shan Greer
scope of work3/23/2011Florin NICULESCU
refuse nominated subcontractor3/23/2011Liaqat Hayat
Maximum delay penalty3/22/2011John Dowse
escalation3/22/2011Liaqat Hayat
Interpretation of Sub-Contract Language3/22/2011John Dowse
Design & Build3/21/2011Florin NICULESCU
delayed Payment3/21/2011Florin NICULESCU
Sub-Contract Lump Sum Scope of Works3/21/2011John Dowse
Fidic Fourth Edittion 19873/21/2011Florin NICULESCU
EOTsijh73/21/2011Daniel Kazado
EOT3/21/2011Alina Valentina Oprea
Force majeure/ employer's risks3/21/2011Liaqat Hayat
Preliminaries3/21/2011Daniel Kazado
suspension of works3/20/2011Liaqat Hayat
Provisional sum3/19/2011Shan Greer
Maximum delay penalty3/19/2011John Dowse
Contractor that worked as a general, did the work and now many problems with the work3/18/2011Florin NICULESCU
Price Adjustment3/18/2011Liaqat Hayat
Contractor that worked as a general, did the work and now many problems with the work3/18/2011Florin NICULESCU
Fidic Fourth Edition3/17/2011Peter M. Elliott
Claim vs. Variation in Lump Sum3/17/2011Peter M. Elliott
Variation in a Lump Sum Contract3/17/2011Peter M. Elliott
Variation in a Lump Sum Contract3/17/2011Liaqat Hayat
Notification of Claim3/17/2011Liaqat Hayat
In a project where the Time was temporarily at large, can the Contractor be accused of concurrency?3/16/2011John Dowse
In a project where the Time was temporarily at large, can the Contractor be accused of concurrency?3/16/2011Peter M. Elliott
Notification of Claim3/16/2011Daniel Kazado
In a project where the Time was temporarily at large, can the Contractor be accused of concurrency?3/16/2011John Dowse
In a project where the Time was temporarily at large, can the Contractor be accused of concurrency?3/16/2011Peter M. Elliott
mobilization advance3/16/2011Florin NICULESCU
Notification of Claim3/16/2011Liaqat Hayat
EOT/Damages3/16/2011Peter M. Elliott
Contract law adn law of land (Applicable law)3/16/2011John Dowse
Variation in a Lump Sum Contract3/16/2011Peter M. Elliott
Variation in a Lump Sum Contract3/15/2011Liaqat Hayat
Variation in a Lump Sum Contract3/15/2011Daniel Kazado
Price Adjustment is part of variation?3/15/2011Liaqat Hayat
Total amount of the contract3/15/2011Florin NICULESCU
Rate breakup for the Item Insurance of the Works3/15/2011Daniel Kazado
Calling Guarantees under FIDIC 993/15/2011Peter M. Elliott
Contract law adn law of land (Applicable law)3/15/2011John Dowse
Contract Law and law of land3/15/2011Peter M. Elliott
Site Conditions and Reasonable Ascertation of Existing Burried Cable3/15/2011John Dowse
Recovery of advance payments in montly invoices3/14/2011Florin NICULESCU
Interpretation of Sub-Contract Language3/14/2011John Dowse
Notification of Claim3/14/2011Florin NICULESCU
claims for EOT3/14/2011Peter M. Elliott
Non Productive Overtime3/13/2011John Dowse
Head Office Overheads With Respect to EOT3/13/2011Daniel Kazado
eot3/13/2011Daniel Kazado
eot3/13/2011kifle semu
eot3/13/2011Alina Valentina Oprea
eot3/13/2011John Dowse
eot3/13/2011Liaqat Hayat
Notification of Claim3/13/2011Daniel Kazado
Notification of Claim3/13/2011Liaqat Hayat
Notification of Claim3/13/2011Florin NICULESCU
Delay in Paymnts time Compencations3/12/2011kifle semu
add appropriate amount to the contract price resulting due to loss of productivity during contract duration and extended stay3/12/2011Peter M. Elliott
Delay in Paymnts time Compencations3/12/2011kifle semu
suspension of works3/12/2011Liaqat Hayat
Overhead and Profit3/11/2011Florin NICULESCU
Civil Disturbance in Sohar, Oman3/10/2011Shan Greer
Advance Payment3/9/2011John Dowse
delayed Payment3/8/2011Florin NICULESCU
delayed Payment3/8/2011Florin NICULESCU
delayed Payment3/8/2011Florin NICULESCU
delayed Payment3/8/2011Nasir Gilani Syed
Delayed Payment3/8/2011John Dowse
Delayed Payment3/8/2011Daniel Kazado
Fidic terms3/7/2011Alina Valentina Oprea
Contractor Head Office Overheads Charges Calculation3/7/2011Daniel Kazado
Contractor Head Office Overheads Charges Calculation3/7/2011Daniel Kazado
Contractor Head Office Overheads Charges Calculation3/7/2011John Dowse
clause12.3(a)(iii) Fiddic 993/7/2011Florin NICULESCU
clause12.3(a)(iii) Fiddic 993/7/2011Florin NICULESCU
Apply Penalty On Sub-Contractor3/6/2011John Dowse
Penalty3/6/2011Nasir Gilani Syed
Deliverables not mentioned in Contract3/6/2011John Dowse
Contruction Questions3/5/2011Bogdan Oprea
fiddic 99 clause 12.3(a)(iii) Explain3/5/2011kifle semu
fiddic 99 clause 12.3(a)(iii) Explain3/5/2011kifle semu
Establishment of New Rate in Compliance with Sub-Cl. 12.3 of FIDIC 19993/5/2011Alina Valentina Oprea
Peerformance Bond Increase/Decrease Langauge3/4/2011John Dowse
Variation Timeframe3/3/2011John Dowse
Cost compensation for EOT3/2/2011John Dowse
fidic lump sum contract3/2/2011John Dowse
regarding IPC after taking over3/2/2011kifle semu
RIAI 2002 Edition (Blue form)3/1/2011John Dowse
Cost Compensation for EOT3/1/2011kifle semu
Emden formula3/1/2011John Dowse
Rouge Price in a Lumpsump fixed Price Project3/1/2011John Dowse
Claim3/1/2011Nasir Gilani Syed
Quantity Variance in Lump Sum Contract2/28/2011Daniel Kazado
Cost compensation for EOT2/28/2011John Dowse
Establishment of New Rate in Compliance with Sub-Cl. 12.3 of FIDIC 19992/28/2011Alina Valentina Oprea
issue of IPC and release of pyament - 14.6 of FIDIC Yellow book2/28/2011Florin NICULESCU
Project close-out and Variations2/27/2011Florin NICULESCU
design safety responsibility2/26/2011Daniel Kazado
breakdown of rate2/25/2011kifle semu
Variations Exceeding 15%2/24/2011Nasir Gilani Syed
Contractual Interpretation of the wording 'Until Further Notice'2/24/2011Daniel Kazado
Item that requires instruction from the Engineer pursuant to Clause 51 and 52 of the Fidic General Conditions of Contract2/24/2011Shan Greer
Contractual Interpretation of the wording 'Until Further Notice'2/24/2011Florin NICULESCU
tender stage breaches2/23/2011Shan Greer
Omission & Substitution for Variation2/23/2011John Dowse
Omission & Substitution for Variation2/23/2011Alina Valentina Oprea
Negative variation case for discussion2/23/2011kifle semu
Discrepancy on a particular contract drawing2/23/2011Nasir Gilani Syed
Plant & Materials intended for Works2/22/2011John Dowse
construction law2/22/2011kifle semu
Contractual Interpretation of the wording 'Until Further Notice'2/22/2011Florin NICULESCU
Contractual Interpretation of the wording 'Until Further Notice'2/22/2011John Dowse
Contractual Interpretation of the wording 'Until Further Notice'2/22/2011Daniel Kazado
Negative variation case for discussion2/22/2011kifle semu
Item that requires instruction from the Engineer pursuant to Clause 51 and 52 of the Fidic General Conditions of Contract2/22/2011Shan Greer
Negative variation, case for discussion2/22/2011Daniel Kazado
Negative variation; case for discussion2/22/2011Florin NICULESCU
Negative variation case for discussion2/22/2011kifle semu
payment for measurement of excavation2/22/2011John Dowse
Method of study E.O.T2/21/2011Florin NICULESCU
Method of study E.O.T2/21/2011John Dowse
Uncarried out works2/21/2011John Dowse
Change of Dimensions of a fixed rate item in Re-measured contract2/21/2011Liaqat Hayat
Method of study E.O.T2/21/2011Florin NICULESCU
Method of study E.O.T2/21/2011kifle semu
Method of study of E.O.T2/21/2011Liaqat Hayat
Method of study E.O.T2/21/2011John Dowse
Method of study E.O.T2/21/2011Shan Greer
conflict between drawings and specifications in a lump sum contract2/20/2011Florin NICULESCU
Variation2/20/2011Senthil Kumar Sellamuthu
Lumpsum contact (FIDIC - design & build)2/20/2011Florin NICULESCU
Shifting from unit prices to lum sum2/18/2011Peter M. Elliott
unreasonable in FIDIC 4TH edition2/18/2011Florin NICULESCU
Rejection of offers in civil works2/18/2011Daniel Kazado
Price Revision Under a Contract2/17/2011Peter M. Elliott
unreasonable in FIDIC 4TH edition2/17/2011Florin NICULESCU
Delay in payment of Advance payment2/17/2011Liaqat Hayat
Fidic2/17/2011Nasir Gilani Syed
Defect Liability period2/16/2011Shan Greer
General requirement & Monthly payment2/15/2011Daniel Kazado
General requirement & Monthly payment2/15/2011Daniel Kazado
General requirement & Monthly payment2/15/2011Bogdan Oprea
General requirement & Monthly payment2/15/2011kifle semu
General requirement & monthly payment2/15/2011Florin NICULESCU
General requirements & monthly payment2/15/2011Liaqat Hayat
General requirement & monthly payment2/15/2011Nasir Gilani Syed
PC rate calculation2/15/2011Peter M. Elliott
Prime Cost2/14/2011Nasir Gilani Syed
Prime Cost2/14/2011kifle semu
Prime Cost2/14/2011Bogdan Oprea
Prime Cost2/14/2011Liaqat Hayat
Prime Cost2/14/2011Peter M. Elliott
Alternative Material2/13/2011Liaqat Hayat
Alternative Material2/13/2011Nasir Gilani Syed
Alternative material2/13/2011Bogdan Oprea
Act of Goverment2/12/2011John Dowse
Provisional sum (PS)2/12/2011Senthil Kumar Sellamuthu
measurement for excavation,2/11/2011Peter M. Elliott
material on site2/10/2011Nasir Gilani Syed
FIDIC Clause 13.5 Provisional Sums2/10/2011John Dowse
Construction Claim2/9/2011Senthil Kumar Sellamuthu
Construction Claim2/9/2011Shan Greer
Taking over of the works2/9/2011Florin NICULESCU
Penalties and Liquidated Damages2/9/2011Senthil Kumar Sellamuthu
Shop drawings2/9/2011John Dowse
taking over certificate2/9/2011Peter M. Elliott
Extension of Time2/8/2011Daniel Kazado
electrical Variations.2/8/2011Senthil Kumar Sellamuthu
Contractors Representative2/8/2011Peter M. Elliott
Associated Cost of Extension Time2/8/2011Florin NICULESCU
Quantity changed by more +10% reduce the Unit Rate2/8/2011John Dowse
Contractor Fee for the variation2/7/2011Daniel Kazado
PC Sums and Contract Programme2/7/2011John Dowse
Mobilization Advance / secured advance adjustment2/7/2011Florin NICULESCU
ESCALATION2/6/2011Liaqat Hayat
Fiddic99(CLAUSE 12.3 EVALUATION)2/5/2011Peter M. Elliott
Contract Administration2/5/2011Florin NICULESCU
Price adjustment2/4/2011John Dowse
Price adjustment2/4/2011Liaqat Hayat
Lump Sum Consultancy Fees2/4/2011Shan Greer
Variation in Quantities exceeding 15%2/4/2011Alina Valentina Oprea
Quantity changed by more +10% reduce the Unit Rate2/4/2011John Dowse
price adjustment2/3/2011Florin NICULESCU
Construction Law2/3/2011Alina Valentina Oprea
Evaluation committees for tenders2/3/2011Daniel Kazado
BOQ quantity increase result Unit Rate decrease as per clause 12.32/2/2011Alina Valentina Oprea
Quantity changed by more +10% reduce the Unit Rate2/1/2011John Dowse
Project delay2/1/2011John Dowse
Payment of Escalation2/1/2011Alina Valentina Oprea
Project Delay2/1/2011Nasir Gilani Syed
Delays and Penalties Calculations2/1/2011John Dowse
Minute of Meeting (MOM)1/31/2011John Dowse
Quarry regarding FIDIC 1987 4th EDITION1/31/2011Alina Valentina Oprea
Provisional sum cancellation risks1/30/2011John Dowse
BOQ Rates utilised for Variations in a Lump Sum Contract1/30/2011Peter M. Elliott
approved by engineer ETO and rejected by clien1/30/2011Peter M. Elliott
Delays and Penalties Calculations1/30/2011John Dowse
Quarry regarding FIDIC 1987 4th EDITION1/30/2011Alina Valentina Oprea
Variation-Order of precednece1/29/2011Alina Valentina Oprea
EMPLOYER'S CLAIMS UNDER FIDIC YELOW BOOK1/27/2011kifle semu
BOQ Rates utilised for Variations in a Lump Sum Contract1/27/2011Peter M. Elliott
Contract Administration1/27/2011Florin NICULESCU
Discrepancy of BOQ & Drawing1/26/2011Florin NICULESCU
LADs & Retention1/26/2011Florin NICULESCU
Remedying of defects1/26/2011Florin NICULESCU
Remedying of defects1/26/2011Liaqat Hayat
LADs & Retention1/26/2011Florin NICULESCU
Lump Sum Contract1/26/2011John Dowse
Remedying of defects1/26/2011Liaqat Hayat
EOT Delay Cost Claim1/26/2011Nasir Gilani Syed
Discrepancy of BOQ & Drawing1/25/2011Florin NICULESCU
variations1/25/2011Shan Greer
Delay beyond Maximum LD (as stated in appendix) & Contractor Insolvent1/25/2011Shan Greer
Remedying of defects1/25/2011Peter M. Elliott
Remedying of defects1/25/2011Liaqat Hayat
Remedying of defects1/25/2011Florin NICULESCU
EOT Delay Cost Claim1/25/2011Daniel Kazado
project timeline1/25/2011Florin NICULESCU
Adjustment against Advance Payment1/25/2011Peter M. Elliott
Adjustment against Advance Payment1/25/2011Liaqat Hayat
Adjustment against Advance Payment1/25/2011Nasir Gilani Syed
Adjustment against Advance Payment1/25/2011John Dowse
Adjustment against Advance Payment1/25/2011Florin NICULESCU
Performance bond for variations?1/25/2011kifle semu
Mitigation actions1/25/2011Senthil Kumar Sellamuthu
EOT Delay Cost Claim1/25/2011Peter M. Elliott
Performance bond for variations?1/24/2011kifle semu
Prime Cost Rate1/24/2011Senthil Kumar Sellamuthu
construction company1/23/2011Senthil Kumar Sellamuthu
Question on Tender bond1/23/2011Florin NICULESCU
Clarification on FIDIC contract1/23/2011Alina Valentina Oprea
Provisional sum1/22/2011Peter M. Elliott
Provisional Sum1/22/2011John Dowse
Non- release of Payments1/21/2011Senthil Kumar Sellamuthu
Delay beyond Maximum LD (as stated in appendix) & Contractor Insolvent1/20/2011Daniel Kazado
ESCALATION1/20/2011Liaqat Hayat
Delay beyond Maximum LD (as stated in appendix) & Contractor Insolvent1/20/2011Liaqat Hayat
Delay beyond Maximum LD (as stated in appendix) & Contractor Insolvent1/20/2011Florin NICULESCU
Nominated Subcontractors1/19/2011Florin NICULESCU
EPC Contract1/19/2011Liaqat Hayat
Delay beyond Maximum LD (as stated in appendix) & Contractor Insolvent1/19/2011Peter M. Elliott
Delay beyond Maximum LD (as stated in appendix) & Contractor Insolvent1/19/2011Daniel Kazado
Delay beyond Maximum LD (as stated in appendix) & Contractor Insolvent1/19/2011Alina Valentina Oprea
Delay beyond Maximum LD (as stated in appendix) & Contractor Insolvent1/19/2011Florin NICULESCU
Delay beyond Maximum LD (as stated in appendix) & Contractor Insolvent1/19/2011Nasir Gilani Syed
Delay beyond Maximum LD (as stated in appendix) & Contractor Insolvent1/19/2011Shan Greer
Delay beyond Maximum LD (as stated in appendix) & Contractor Insolvent1/19/2011Liaqat Hayat
Period of Validity of Performance Security1/19/2011John Dowse
Period of Validity of Performance Security1/19/2011Peter M. Elliott
Lump Sum Contract1/19/2011Peter M. Elliott
construction contract law1/18/2011Senthil Kumar Sellamuthu
EPC Contract1/18/2011Liaqat Hayat
Additional Work1/18/2011Peter M. Elliott
ESCALATION1/18/2011Liaqat Hayat
Plant and Design-build (FIDIC Yellow Book)1/17/2011Liaqat Hayat
Liquidated Damages in Contracts for Civil works1/17/2011Daniel Kazado
Nominated Subcontractors1/16/2011John Dowse
Provisional Sum1/16/2011John Dowse
Proffesional Indemnity Insurance1/16/2011John Dowse
On Account Payments1/16/2011Senthil Kumar Sellamuthu
Nominated Subcontractors1/15/2011Shan Greer
EOT and MOB Advance1/15/2011Liaqat Hayat
EOT and MOB Advance1/14/2011Liaqat Hayat
EOT and MOB Advance1/14/2011Liaqat Hayat
Nominated Subcontractors1/13/2011Florin NICULESCU
How to fix the profit magin1/13/2011John Dowse
Sub-contractor's termination by Employer1/13/2011Daniel Kazado
Sub-contractor's termination by Employer1/13/2011Daniel Kazado
Termination of Sub-contractor by the Employer1/13/2011Florin NICULESCU
Plant and Design-build (FIDIC Yellow Book)1/12/2011Liaqat Hayat
Time at large / Maladaministration1/12/2011John Dowse
Nominated Subcontractors1/11/2011Shan Greer
Nominated Subcontractors1/11/2011John Dowse
Nominated Subcontractors1/11/2011Senthil Kumar Sellamuthu
Nominated Subcontractors1/11/2011Florin NICULESCU
Nominated Subcontractors1/11/2011Nasir Gilani Syed
Nominated Subcontractors1/11/2011Bogdan Oprea
failuar for amicable setelement1/10/2011Senthil Kumar Sellamuthu
Productivity loss1/10/2011Florin NICULESCU
Additional Items in Contracts1/9/2011Daniel Kazado
issue of variation under Defectsliability period1/9/2011John Dowse
Liquidated damages1/8/2011Florin NICULESCU
issue of variation under Defectsliability period1/8/2011John Dowse
leaky roof1/7/2011Shan Greer
fixed lump sum contract1/7/2011John Dowse
Resend- early taking over1/6/2011John Dowse
professional indemnity PI1/5/2011Florin NICULESCU
Calculation of costs for EOT1/5/2011Liaqat Hayat
variation orders1/4/2011Daniel Kazado
BOQ Unit Rates1/4/2011Daniel Kazado
Delay Claim1/2/2011Peter M. Elliott
OH/P breakdown1/2/2011Liaqat Hayat
Deduction of Preliminaries1/2/2011Bogdan Oprea
Agreed variation1/1/2011Peter M. Elliott
Performance Guarantee12/30/2010Alina Valentina Oprea
FIDIC Contract Modified12/30/2010Peter M. Elliott
Drawings use for measurments in remeasure contract12/30/2010Alina Valentina Oprea
Drawings use for measurments in remeasure contract12/30/2010Alina Valentina Oprea
Time Extension12/29/2010Liaqat Hayat
IPCs payments after expiry of completion period12/29/2010Liaqat Hayat
Variation Orders12/29/2010John Dowse
Performance Guarantee12/28/2010Alina Valentina Oprea
STATEMENT AT COMPLETION - FIDIC CLAUSE12/28/2010Alina Valentina Oprea
ownership of contractor's site houses after completion of a project12/27/2010Daniel Kazado
Professional Appointments12/27/2010Shan Greer
Drawings use for measurments in remeasure contract12/27/2010Alina Valentina Oprea
signature of designer on the drawings12/27/2010Liaqat Hayat
Professional Appointments12/23/2010Shan Greer
IPCs payments after expiry of completion period12/23/2010Liaqat Hayat
CONSTRUCTION LAW12/22/2010Liaqat Hayat
handing over to authority12/22/2010Liaqat Hayat
HANDING OVER TO AUTHORITY12/22/2010Daniel Kazado
Retention money12/22/2010John Dowse
delay in the completion of project / payments12/21/2010Shan Greer
BOQ12/21/2010John Dowse
Provisional sum12/21/2010Shan Greer
FIDIC 1999 1st Edition12/21/2010Peter M. Elliott
Retention money12/21/2010John Dowse
fidic 199212/20/2010Daniel Kazado
payment to the contractor12/20/2010Nasir Gilani Syed
EOT NOT GRANTED12/20/2010Liaqat Hayat
FIDIC RED BOOK12/20/2010John Dowse
Provisional Item12/19/2010Bogdan Oprea
Provisional sums in FIDIC 9912/19/2010Alina Valentina Oprea
Fidic Claims12/18/2010Nasir Gilani Syed
Suspension Claims12/18/2010Peter M. Elliott
Fidic12/17/2010Alina Valentina Oprea
performance bond12/16/2010Peter M. Elliott
Imposition of Liquidated Damages12/15/2010Nasir Gilani Syed
Lump Sum Contract variations12/14/2010Florin NICULESCU
EoT requirements12/14/2010Peter M. Elliott
Other Contractors12/13/2010John Dowse
Employers opinion12/13/2010Florin NICULESCU
Employers opinion12/13/2010Shan Greer
Performace Bond12/12/2010Peter M. Elliott
Internal strike12/11/2010Peter M. Elliott
Other Contractors12/11/2010John Dowse
EOT claim in the abscence of approved program12/11/2010Nasir Gilani Syed
Error in the BoQ12/10/2010Florin NICULESCU
Subcontracting12/10/2010Florin NICULESCU
Claim following insecurity12/10/2010Liaqat Hayat
FIDIC clarification12/10/2010Peter M. Elliott
FIDIC clarification12/9/2010Daniel Kazado
P.C. Rate Items12/9/2010Nasir Gilani Syed
Performace Bond12/9/2010Peter M. Elliott
FIDC 4- shifting partially from unit prices to lump sums12/8/2010Peter M. Elliott
Supporting Documents for IPC12/7/2010Liaqat Hayat
clause 6712/7/2010Bogdan Oprea
errors in the BoQ12/7/2010John Dowse
Supporting Documents for IPC12/7/2010Liaqat Hayat
Measurement and Payment12/7/2010Peter M. Elliott
BOQ12/6/2010Liaqat Hayat
NOC procedures with Abudhabi Authorities12/6/2010Nasir Gilani Syed
Determination of Prologation Costs12/6/2010Liaqat Hayat
15% increase12/5/2010Liaqat Hayat
15% increase12/5/2010Bogdan Oprea
Damages caused by flood12/3/2010John Dowse
CAN A CLAIM THAT WAS EARLIER SETTLED (UNDER A FIDIC IV CONTRACT) SUBSEQUENTLY BE RE-OPENED?12/2/2010Peter M. Elliott
Adverse Weather12/2/2010Florin NICULESCU
Adverse Weather12/2/2010Florin NICULESCU
Actual and Correct Quantity Contract12/1/2010Florin NICULESCU
Items deletion12/1/2010Peter M. Elliott
Un paid invoices11/30/2010Bogdan Oprea
Price Fluctuations11/30/2010Peter M. Elliott
Lump Sum Contract11/30/2010Liaqat Hayat
Employer avoids giving possession to the site11/30/2010John Dowse
Employer avoids giving possession to the site11/30/2010Peter M. Elliott
Employer avoids giving possession to the site11/30/2010Florin NICULESCU
Employer avoids giving possession to the site11/30/2010Shan Greer
Employer avoids giving possession to the site11/30/2010Bogdan Oprea
Employer avoids giving possession to the site11/30/2010Liaqat Hayat
Conversion of Provisional Sum item into Prime Cost item11/30/2010Nasir Gilani Syed
contract amount &contract price11/29/2010Nasir Gilani Syed
Additional Works11/29/2010Peter M. Elliott
Time at Large11/28/2010Liaqat Hayat
Damages caused by flood11/28/2010John Dowse
Substantiation of Claims11/28/2010Peter M. Elliott
Nominated subcontractor11/28/2010Peter M. Elliott
Preliminiries11/28/2010Nasir Gilani Syed
Actual Progress Percentage11/27/2010Liaqat Hayat
Variations&Claims Valuation under FIDIC Plant and design build (1999)11/26/2010Liaqat Hayat
Time at Large11/26/2010Liaqat Hayat
cancelation of contract11/26/2010Florin NICULESCU
Late Payment11/25/2010Florin NICULESCU
Taking Over Certificates11/25/2010John Dowse
Late Payment11/25/2010Florin NICULESCU
Variation Quantities11/25/2010Peter M. Elliott
Variation Quantities11/25/2010Peter M. Elliott
Lump sum11/25/2010Liaqat Hayat
Monthly Valuation for Works Complete11/24/2010John Dowse
Items deletion11/23/2010Peter M. Elliott
Penalty11/23/2010Bogdan Oprea
Statement at Completion11/23/2010Alina Valentina Oprea
Preliminaries11/23/2010John Dowse
Preliminaries11/23/2010Liaqat Hayat
Variations, quantities etc.11/23/2010Nasir Gilani Syed
Roles and Responsiblities11/22/2010Alina Valentina Oprea
Queries on a clause in our contract11/22/2010Florin NICULESCU
Variations, quantities etc.11/22/2010Nasir Gilani Syed
Queries on a clause in our contract11/22/2010Florin NICULESCU
clause 13.8 fidic 199911/22/2010Liaqat Hayat
Contractor's entitlement due to cancellation of project11/21/2010Florin NICULESCU
FIDIC 99 Clause 17.611/20/2010Alina Valentina Oprea
Lumsum Contract11/20/2010Alina Valentina Oprea
Invoices11/19/2010John Dowse
quantities/L.S. Contract11/19/2010Florin NICULESCU
Prices/Lumsum Contract11/19/2010John Dowse
Lumsum Contrac11/19/2010Nasir Gilani Syed
Lumsum Contract11/19/2010Alina Valentina Oprea
quantities/L.S. Contract11/19/2010Florin NICULESCU
increase of quantities in the lumpsum contract11/19/2010Peter M. Elliott
DELAY IN ACCESS TO SITE11/18/2010Peter M. Elliott
New Home Construction Billing dispute11/18/2010Shan Greer
reduction in quantities/errors in employer's specifications11/18/2010Alina Valentina Oprea
Dispute Resolution - FIDIC 9911/18/2010Alina Valentina Oprea
Clause 4.1211/18/2010Alina Valentina Oprea
Clause 4.1211/17/2010Alina Valentina Oprea
materials onsite/offsite11/16/2010Alina Valentina Oprea
limit for variation works11/16/2010John Dowse
extension of time11/16/2010Nasir Gilani Syed
Loss of profit11/16/2010Peter M. Elliott
Payment to consultant11/16/2010Peter M. Elliott
construction contract law11/15/2010Alina Valentina Oprea
Sub-clause 13.111/14/2010Liaqat Hayat
contractual11/14/2010Alina Valentina Oprea
Ideal payment11/14/2010John Dowse
Subcontract agreement11/13/2010Nasir Gilani Syed
amortisation of advance - calsue 14.2 for FIDIC11/12/2010Florin NICULESCU
Damaged Claims Caused by 3rd Parties / Other Works Contactors11/12/2010Peter M. Elliott
House Construction was Beyond Contract Period11/12/2010Shan Greer
Damaged Claims Caused by 3rd Parties / Other Works Contactors11/12/2010Peter M. Elliott
contractual11/11/2010Alina Valentina Oprea
Cost Compensation11/10/2010Liaqat Hayat
amortisation of advance - calsue 14.2 for FIDIC11/10/2010Florin NICULESCU
Modified version of Fidic 1999 red book11/9/2010Alina Valentina Oprea
House Construction was Beyond Contract Period11/9/2010Shan Greer
consultant fees for a period of EOT11/8/2010John Dowse
consultant fees for variation11/8/2010Alina Valentina Oprea
Robbery on the Site11/7/2010Alina Valentina Oprea
Robbery on the Site11/7/2010John Dowse
Robbery on the Site11/7/2010Florin NICULESCU
Robbery on the Site11/7/2010Bogdan Oprea
Robbery on the Site11/7/2010Nasir Gilani Syed
Robbery on the Site11/7/2010Liaqat Hayat
Robbery on the Site11/7/2010Shan Greer
Retraction of Approval11/7/2010Alina Valentina Oprea
Armed Robbery on the Site11/7/2010Peter M. Elliott
Q&A VARIATION11/6/2010Peter M. Elliott
1987 FIDIC Red Book, Sub-Clause 52.311/5/2010Peter M. Elliott
Claims/Delay Quallifications11/5/2010John Dowse
determination of contract11/5/2010John Dowse
Value Engineering & Variation11/4/2010Peter M. Elliott
Additional work to be carried out during DLP11/3/2010Peter M. Elliott
bill of quantities11/3/2010Alina Valentina Oprea
Provisional Sum11/3/2010Peter M. Elliott
Schedule of Rates Contract11/2/2010Alina Valentina Oprea
EOT Claim11/1/2010Florin NICULESCU
Commencement Date according to FIDIC 9911/1/2010Alina Valentina Oprea
pc rate10/31/2010Senthil Kumar Sellamuthu
delay and extension of time10/31/2010Peter M. Elliott
construction law10/30/2010Peter M. Elliott
EOT claim due to delay in payments10/30/2010Florin NICULESCU
Is there an EOT entitlement10/29/2010Daniel Kazado
FIDIC Plant and Design-Build, Sub-Clause 7.610/28/2010John Dowse
FIDIC Plant and Design-Build, Sub-Clause 7.610/28/2010Alina Valentina Oprea
Claim for bonds against negociate and singed agreement10/28/2010Daniel Kazado
Rate Break Down10/27/2010Peter M. Elliott
pc rate10/27/2010Liaqat Hayat
Lum sum contract with pc rate and ps10/27/2010Florin NICULESCU
contract price10/27/2010Peter M. Elliott
Material on Site10/27/2010Alina Valentina Oprea
FIDIC Versions10/27/2010Alina Valentina Oprea
Type of Analysis for EOT10/27/2010Senthil Kumar Sellamuthu
Head Office Over heads10/27/2010Nasir Gilani Syed
Material on Site10/27/2010Alina Valentina Oprea
pc rate10/26/2010Senthil Kumar Sellamuthu
pc rate10/26/2010Liaqat Hayat
urgent question10/26/2010Shan Greer
Lum sum contract with pc rate and ps10/26/2010Florin NICULESCU
Material on Site10/26/2010Peter M. Elliott
ENAA contracts10/25/2010Alina Valentina Oprea
Rate Break Down10/25/2010Peter M. Elliott
Prelims & Variations10/25/2010Nasir Gilani Syed
Rate Break Down10/25/2010Peter M. Elliott
Variation for deduction in quantities10/25/2010Daniel Kazado
Variation for deduction in quantities10/25/2010Daniel Kazado
Ideal payment10/24/2010John Dowse
Taking over cert10/24/2010Peter M. Elliott
Change Orders10/24/2010Florin NICULESCU
part or parts of work10/22/2010Peter M. Elliott
Multi-prime contracts10/22/2010Shan Greer
Variation of quantites10/22/2010Peter M. Elliott
FIDIC Letter of Acceptance10/22/2010Florin NICULESCU
Delay Damage10/21/2010Florin NICULESCU
The role of the Engineer10/21/2010Bogdan Oprea
Suspension and Termination10/20/2010Alina Valentina Oprea
Contractor disregard our requests to submit a recovery plan10/20/2010Peter M. Elliott
Delay Damage10/20/2010Florin NICULESCU
Draft final statement10/20/2010Peter M. Elliott
Clause12.2 Fidic10/19/2010Florin NICULESCU
D B contract10/19/2010Florin NICULESCU
Payment10/19/2010John Dowse
When can a non-physical items (in the BOQ) in a lump sum contract be certified?10/19/2010Nasir Gilani Syed
Payment of non-physical items in BOQ10/19/2010Alina Valentina Oprea
Amortisation of advance payment10/19/2010Bogdan Oprea
Reject the Payment Certificate10/18/2010Florin NICULESCU
Delay Damage Value10/18/2010Florin NICULESCU
Reject the Payment Certificate10/18/2010Florin NICULESCU
FIDIC 1999 Yellow Book: Termination of Contract10/18/2010Alina Valentina Oprea
Difference in measuring unit between BoQ and Standard Specifications10/18/2010Florin NICULESCU
terminating a contract with builder10/17/2010Peter M. Elliott
D B B contract10/17/2010Liaqat Hayat
At what point is a payment actually made?10/17/2010John Dowse
Lump Sum Contract Progress Claim10/17/2010Nasir Gilani Syed
Lump sum Contract variation10/16/2010Nasir Gilani Syed
Variations in construction industry.10/16/2010Liaqat Hayat
Lump sum Contract variation10/15/2010Nasir Gilani Syed
Contractor disregard our requests to submit a recovery plan10/14/2010Peter M. Elliott
1987 FIDIC Red Book, Sub-Clause 52.310/13/2010Peter M. Elliott
Loss of overhead&profit10/13/2010Peter M. Elliott
Remeasure - ICE 7th10/13/2010John Dowse
Day Works10/13/2010John Dowse
Variation in EPC Contract10/12/2010Liaqat Hayat
loss of overhead&profit10/12/2010Florin NICULESCU
Variations - Lump Sum10/12/2010Nasir Gilani Syed
Extension of Time10/12/2010Peter M. Elliott
Construction Law10/12/2010Alina Valentina Oprea
Variations - Lump Sum10/11/2010Peter M. Elliott
Claims under Clause 51 of FIDIC for excess materials10/11/2010Bogdan Oprea
Variations - Lump Sum10/11/2010Peter M. Elliott
Variations - Lump Sum10/11/2010Nasir Gilani Syed
fidic clauses10/10/2010Alina Valentina Oprea
Contracts10/10/2010Nasir Gilani Syed
Employer's risk in FIDIC10/10/2010Alina Valentina Oprea
Contract type10/8/2010Liaqat Hayat
Limit of the Retention10/8/2010Bogdan Oprea
contract10/8/2010Daniel Kazado
Limit of the Retention10/7/2010Bogdan Oprea
Employer's risk in FIDIC10/6/2010Alina Valentina Oprea
Negative extension of time10/6/2010Senthil Kumar Sellamuthu
Negative extension of time10/6/2010Shan Greer
Can we reject the Interium Payment Certificate.10/6/2010Liaqat Hayat
legal terminology10/6/2010Ann Glacki
FIDIC Design & Build10/5/2010Senthil Kumar Sellamuthu
Termination for Convenience10/5/2010Nasir Gilani Syed
Compensation for Time Extension10/4/2010Florin NICULESCU
Project completion and Defects10/3/2010Alina Valentina Oprea
fidic10/2/2010Alina Valentina Oprea
define month10/2/2010Bogdan Oprea
define month10/2/2010Nasir Gilani Syed
risk impact10/1/2010Alina Valentina Oprea
FIDIC 1st ed. 1999 queries10/1/2010Nasir Gilani Syed
FIDIC 1st ed. 1999 queries10/1/2010Shan Greer
FIDIC 1st ed. 1999 queries10/1/2010Liaqat Hayat
FIDIC 1st ed. 1999 query10/1/2010Bogdan Oprea
Preliminaries on variations9/30/2010Shan Greer
assessment of substitution9/29/2010John Dowse
Prolongation cost under FIDIC9/29/2010Liaqat Hayat
Construction Law9/29/2010Alina Valentina Oprea
Assessment of Substitution9/28/2010Florin NICULESCU
Prolongation cost under FIDIC9/28/2010Liaqat Hayat
FIDIC 1999 remedy of outstanding works9/28/2010Alina Valentina Oprea
Method Statements9/28/2010John Dowse
varaition9/28/2010Florin NICULESCU
FIDIC Red Book 1999 & Fourth Edition 19879/28/2010Florin NICULESCU
Adjustements for Changes in Cost9/27/2010Alina Valentina Oprea
Prolongation cost under FIDIC9/27/2010Liaqat Hayat
Clause 12.3 Evaluation9/27/2010John Dowse
CONTRACTOR'S GENERAL OBLIGATIONS (4.1)9/27/2010Shan Greer
variation9/27/2010Daniel Kazado
variation9/27/2010Liaqat Hayat
variation9/27/2010Shan Greer
varaition9/27/2010Florin NICULESCU
variations9/27/2010John Dowse
variations9/27/2010Alina Valentina Oprea
Termination of NSC due to non payment9/26/2010Peter M. Elliott
Abortive work or hold works9/24/2010Peter M. Elliott
Clause 52.29/24/2010Peter M. Elliott
Clause 52.29/23/2010Peter M. Elliott
Items deletion9/23/2010Peter M. Elliott
difine month9/23/2010John Dowse
Request the Contractor toSubmit a Proposal9/23/2010Peter M. Elliott
Variation Quantities9/22/2010Peter M. Elliott
Items deletion9/20/2010Peter M. Elliott
Help me9/20/2010John Dowse
Price Adjustment with ref to PEC guidelines9/20/2010Liaqat Hayat
Price Adjustment with ref to PEC guidelines9/18/2010Liaqat Hayat
Escalation on High Speed Diesel9/16/2010Liaqat Hayat
Questions on contract issues9/15/2010Peter M. Elliott
Lump Sump Contract9/13/2010Shan Greer
Questions on contract issues9/13/2010Peter M. Elliott
Performance security amount9/9/2010John Dowse
Termination of contract - Construction9/8/2010Shan Greer
pile work9/6/2010Peter M. Elliott
IS the ROADS PART OF CONTRACT SCOPE9/5/2010Peter M. Elliott
IS the ROADS PART OF CONTRACT SCOPE9/4/2010Peter M. Elliott
recovery of Advance payment on termination of contract9/4/2010Alina Valentina Oprea
Delay9/4/2010Alina Valentina Oprea
pile work9/4/2010Peter M. Elliott
Fidic Red book 19999/3/2010Florin NICULESCU
Fidic Red book 19999/3/2010Alina Valentina Oprea
EOT & Cost Claim9/3/2010Peter M. Elliott
method of recovering advance payment9/3/2010Peter M. Elliott
FIDIC 1999 - 1st Edition9/3/2010Peter M. Elliott
Delegation of the RE9/3/2010Florin NICULESCU
method of recovering advance payment9/2/2010Peter M. Elliott
loss of earning due to work suspension9/2/2010Peter M. Elliott
Adjustments for changes in cost9/1/2010Liaqat Hayat
Subject 1) Omission OR (2) Not part of contract scope?8/31/2010Peter M. Elliott
Increase in material price8/31/2010Alina Valentina Oprea
Price adjustment8/31/2010Florin NICULESCU
EOT & Cost Claim8/30/2010Peter M. Elliott
Performance security8/30/2010Nasir Gilani Syed
Access to site8/29/2010Bogdan Oprea
FIDIC 1999 - Clause 14.58/28/2010Alina Valentina Oprea
Advance Payment Adjustment, FIDIC New Red Book 19998/28/2010John Dowse
FIDIC 1999 - Clause 14.58/28/2010Alina Valentina Oprea
Trade discount and Cash discount difference in VO8/27/2010John Dowse
Delay due to late supply of Prime Cost item8/26/2010Senthil Kumar Sellamuthu
Claims8/26/2010Shan Greer
Negative Variations8/26/2010Nasir Gilani Syed
interim payments8/26/2010Florin NICULESCU
Product Liability for construction related software8/25/2010Shan Greer
Lump Sum Tender8/24/2010Nasir Gilani Syed
TOC8/23/2010Peter M. Elliott
"Continuation of Obligation"8/22/2010Shan Greer
profit loss8/20/2010Peter M. Elliott
EoT8/20/2010Peter M. Elliott
shedule of rate breakdown8/19/2010Peter M. Elliott
shedule of rate breakdown8/19/2010Peter M. Elliott
Yellow FIDIC Book8/19/2010Alina Valentina Oprea
Can we pay in IPC to the Contractor on the bases of workdone without IR.8/18/2010Nasir Gilani Syed
Omission of BoQ item8/17/2010Bogdan Oprea
Omission of BoQ item8/17/2010Shan Greer
Omission of BoQ item8/17/2010Peter M. Elliott
BOQ rates and EOT8/17/2010Peter M. Elliott
Contractors Notice of Suspension8/16/2010John Dowse
E.O.T8/15/2010John Dowse
E.O.T8/15/2010Peter M. Elliott
Contractors Notice of Suspension8/13/2010John Dowse
Defintion and terms8/12/2010Peter M. Elliott
Escalation8/11/2010Peter M. Elliott
Commencement Date8/11/2010Peter M. Elliott
Fidic norms8/11/2010Alina Valentina Oprea
query wrt price adjustment8/11/2010Peter M. Elliott
Escalation8/10/2010Peter M. Elliott
Recovery of Pension Deficit8/10/2010John Dowse
Variation / Site Instructions8/9/2010Peter M. Elliott
In design & Build Project any item not done on site . can amount be deducted.8/9/2010Liaqat Hayat
CLAUSE 1.5 FIDIC 19998/8/2010John Dowse
delay due to Interruption in exemption8/8/2010Alina Valentina Oprea
query wrt price adjustment8/6/2010Peter M. Elliott
FIDIC Yellow Book Sub Contract8/4/2010Peter M. Elliott
The Emplyer's Claim8/3/2010Liaqat Hayat
The Contractor's Fault8/3/2010John Dowse
Employer's Claim8/3/2010Peter M. Elliott
Subsequent Legislation Claims8/3/2010Bogdan Oprea
Dayworks8/3/2010John Dowse
Lump sum contract8/3/2010Nasir Gilani Syed
delay due to Interruption in exemption8/2/2010Alina Valentina Oprea
14.2 programme8/2/2010Peter M. Elliott
14.2 programme8/2/2010Liaqat Hayat
IPC Certification8/2/2010Peter M. Elliott
Taking Over Certificate7/30/2010Peter M. Elliott
Dispute Resolution7/29/2010Peter M. Elliott
Reduction in quantities7/29/2010John Dowse
substantial completion,and tax exemption7/29/2010Florin NICULESCU
Reduction in quantities7/28/2010Peter M. Elliott
Reduction in quantities7/28/2010Bogdan Oprea
Reduction in quantities7/28/2010Florin NICULESCU
Reduction in quantities7/28/2010Alina Valentina Oprea
Reduction in quantities7/28/2010Daniel Kazado
Deduction of Money for the bad workmanship7/28/2010Liaqat Hayat
Termination by Client7/28/2010Liaqat Hayat
Extension of Time7/27/2010John Dowse
Adjustment to Contract Price7/27/2010John Dowse
Warranties & Substantial Completion7/27/2010Florin NICULESCU
Warranties & Substantial Completion7/27/2010John Dowse
Change the appendix to tender term during tender7/27/2010Bogdan Oprea
substantial completion,and tax exemption7/27/2010Florin NICULESCU
Liquidated damages7/27/2010Peter M. Elliott
Liquidated damages7/26/2010Florin NICULESCU
Liquidated damages7/26/2010Liaqat Hayat
Liquidated damages7/26/2010Bogdan Oprea
Contradictory BOQ Items and Contradictory Relevant Particular Specifications7/26/2010Peter M. Elliott
Taking Over Certificate7/26/2010Peter M. Elliott
Liquidated Damages7/26/2010Bogdan Oprea
main point for approve clause 14 programme7/26/2010Peter M. Elliott
main point for approve clause 14 programme7/26/2010Liaqat Hayat
main point for approve clause 14 programme7/26/2010Nasir Gilani Syed
certifecates and payment 27/25/2010Bogdan Oprea
certificates and payment7/25/2010Peter M. Elliott
prolongation claim 37/25/2010Peter M. Elliott
prolongation claim 27/25/2010Liaqat Hayat
prolongation cost 17/25/2010Bogdan Oprea
prolongation claim7/25/2010Nasir Gilani Syed
Taking Over Certificate7/25/2010Peter M. Elliott
Adjustment to Contract Price7/24/2010John Dowse
FIDIC 87 Sub-clause 70.1, 70.27/24/2010Peter M. Elliott
Variation change7/23/2010John Dowse
FIDIC 87 Sub-clause 70.1, 70.27/22/2010Peter M. Elliott
FIDIC 87 Sub-clause 70.1, 70.27/22/2010Alina Valentina Oprea
FIDIC 87 Sub-clause 70.1, 70.27/22/2010Liaqat Hayat
FIDIC 87 Sub-clause 70.1, 70.27/22/2010Bogdan Oprea
FIDIC 87 Sub-clause 70.1, 70.27/22/2010John Dowse
FIDIC 87 Sub-clause 70.1, 70.27/22/2010Florin NICULESCU
FIDIC 87 Sub-clause 70.1, 70.27/22/2010Nasir Gilani Syed
Mistake in calculating the contract price7/22/2010Liaqat Hayat
Fradulent claim in arbitration7/21/2010John Dowse
Design Coordination & Liability responsibilities of Contractor under Lump Sum Contract in redbook 4th edition 19927/21/2010Nasir Gilani Syed
Sub clause 13.87/21/2010Alina Valentina Oprea
amortisation of Advance Payment7/20/2010John Dowse
Design liability7/20/2010Peter M. Elliott
Variations7/20/2010Peter M. Elliott
assessment7/20/2010Peter M. Elliott
Deduction of Progress Payment7/19/2010Peter M. Elliott
Interim Progress Claim7/19/2010John Dowse
abutibah@yahoo.com7/19/2010Nasir Gilani Syed
termination7/19/2010Alina Valentina Oprea
not built as permitted7/19/2010Liaqat Hayat
FIDIC 1987 Clause 52.3 Adjustment7/18/2010Peter M. Elliott
assessment7/18/2010Peter M. Elliott
Breach of Contract7/18/2010Bogdan Oprea
Breach of Contract7/18/2010Florin NICULESCU
Breach of Contract7/18/2010Daniel Kazado
Breach of Contract7/18/2010Alina Valentina Oprea
Breach of Contract7/18/2010Alina Valentina Oprea
Breach of Contract7/18/2010Peter M. Elliott
Variations7/18/2010Peter M. Elliott
Variation7/17/2010Peter M. Elliott
Fradulent claim in arbitration7/16/2010John Dowse
Recovery of Advance Payment7/16/2010Peter M. Elliott
Can Contractor claim the loss of proffit ddue to extended period on default of Employer7/16/2010Bogdan Oprea
Clause 52.47/16/2010Liaqat Hayat
Law of contract7/16/2010Alina Valentina Oprea
Gen. & Prel.7/15/2010Florin NICULESCU
measrement7/15/2010Peter M. Elliott
Measerement7/15/2010Peter M. Elliott
Role of Vetted Consultant7/14/2010Bogdan Oprea
Measurement7/14/2010Nasir Gilani Syed
Notice for Variations 52.27/14/2010Peter M. Elliott
Contract Price Adjustment7/13/2010Peter M. Elliott
cosultant periods for approvals7/13/2010Nasir Gilani Syed
Notice for Variations 52.27/13/2010Peter M. Elliott
Fidic Incorrect estimates , adjustment for lumpsum contracts7/13/2010John Dowse
substantial completion7/12/2010Florin NICULESCU
LD's (FIDIC-1992)7/12/2010Bogdan Oprea
Subcontractor - Notice of delay and claim7/12/2010Nasir Gilani Syed
price adjustment7/12/2010Alina Valentina Oprea
LDs and Payments7/12/2010Alina Valentina Oprea
FIDIC 4(cl.52.1(b))7/11/2010Florin NICULESCU
EOT on "time at large" basis7/11/2010Bogdan Oprea
FIDIC 4(cl.52.1(b))7/11/2010Florin NICULESCU
Time at large7/9/2010Alina Valentina Oprea
Time at large7/9/2010Florin NICULESCU
NOMINATED SUBCONTRACTOR BONDS7/9/2010Nasir Gilani Syed
Secure Advance7/9/2010Bogdan Oprea
Appointment of DAB Memebers7/8/2010Bogdan Oprea
Time at large7/8/2010Bogdan Oprea
Provisional Sum7/7/2010John Dowse
variation order7/7/2010Alina Valentina Oprea
delay in commencement order7/7/2010Daniel Kazado
payment delay stop work7/7/2010Nasir Gilani Syed
BACKCHARGES7/6/2010John Dowse
FIDIC Delay damages7/5/2010Daniel Kazado
FIDIC Delay damages7/5/2010John Dowse
FIDIC Delay damages7/5/2010Liaqat Hayat
FIDIC Delay damages7/5/2010Bogdan Oprea
delays due to reach engineer's satisfaction7/5/2010John Dowse
FIDIC 1999 - Clause 14.17/5/2010Alina Valentina Oprea
Work at night7/3/2010Liaqat Hayat
contrac bidding procedure7/2/2010Shan Greer
Over certified an amount on progress payment7/2/2010John Dowse
cl.10.1Fidic 19997/2/2010Alina Valentina Oprea
BACKCHARGES7/1/2010John Dowse
Negative Change Order7/1/2010Liaqat Hayat
Variations under FIDIC 47/1/2010Shan Greer
Construction Variation6/30/2010Shan Greer
Time Barring on Engineers Instructions that Constitute a Variation6/30/2010John Dowse
Optimization in EPC Contract6/30/2010John Dowse
variation order6/29/2010Peter M. Elliott
Price Adjustment6/28/2010Liaqat Hayat
Contract cancellation6/28/2010John Dowse
Payment for material on site6/27/2010John Dowse
Base line prog - Change in type of foudnation - Design & Build contract6/25/2010Liaqat Hayat
Taxes on escalation6/25/2010John Dowse
Quarry about Prolongation Cost6/24/2010Florin NICULESCU
Lack of detailed drawings6/23/2010Peter M. Elliott
Price Adjustment Formula6/22/2010Liaqat Hayat
Prelimary Cost6/22/2010John Dowse
Infrastructure Contract6/21/2010Senthil Kumar Sellamuthu
Prelimineries6/21/2010Senthil Kumar Sellamuthu
In a fixed price lump sum contract,Can Penalty be deducted from retention money? or from performance bond? of a contractor.6/20/2010Senthil Kumar Sellamuthu
Prelimineries6/19/2010Senthil Kumar Sellamuthu
Home Addition Contract (2) Questions6/18/2010John Dowse
Withholding of any % of retention after determination of contract in final account.6/17/2010John Dowse
EOT claim- Cost impact procedure6/16/2010Peter M. Elliott
Advance Payment6/16/2010Peter M. Elliott
Maximum delay penalty6/16/2010Nasir Gilani Syed
Variation Orders & Extension of Time6/15/2010Peter M. Elliott
Prime Costs6/14/2010Senthil Kumar Sellamuthu
variation/pc rates/daywork/etc6/14/2010Peter M. Elliott
Interest claim under UAE law for delayed progress payment.6/13/2010Nasir Gilani Syed
Government Project6/12/2010Florin NICULESCU
negative variatio order6/12/2010Peter M. Elliott
negative variatio order6/12/2010Nasir Gilani Syed
negative variation6/12/2010Senthil Kumar Sellamuthu
tender documents/ bill of quantities6/12/2010Senthil Kumar Sellamuthu
Please Help!6/11/2010Bogdan Oprea
Day Work Sheet6/11/2010Liaqat Hayat
Letter of Award different from contract Documents6/11/2010John Dowse
Recovery of overheads and loss of profit6/10/2010Alina Valentina Oprea
Construction Law6/10/2010Alina Valentina Oprea
Variations6/9/2010John Dowse
MATERIALS ON SITE6/9/2010Florin NICULESCU
Contractors offer6/9/2010John Dowse
Advance Payment to Nominated Subcontractor6/8/2010Florin NICULESCU
material off site6/8/2010John Dowse
negative variatio order6/8/2010Nasir Gilani Syed
Calculation for Cost of Overheads6/8/2010Liaqat Hayat
Construction Law6/8/2010Alina Valentina Oprea
salt leaching through contrete6/8/2010Florin NICULESCU
negative varition order6/7/2010Daniel Kazado
negative variation6/7/2010Nasir Gilani Syed
Delay & idling charge claim6/7/2010John Dowse
Delay in site handing over6/6/2010Bogdan Oprea
VO for Change of Rate in ORIGINAL BOQ6/6/2010Liaqat Hayat
BOQ Item Payment6/6/2010Nasir Gilani Syed
Contracts6/5/2010Alina Valentina Oprea
Delay & idling charge claim6/5/2010John Dowse
Justifying an EPC extension of time Claim6/4/2010John Dowse
arbitration, fraud, UNCITRAL6/3/2010Nicholas A. Brown
Responsibility for subcontractors6/3/2010Nasir Gilani Syed
Civil Engineering Law6/3/2010Nicholas A. Brown
Claim based on Revised BoQ6/2/2010Peter M. Elliott
variation/pc rates/daywork/etc6/2/2010Peter M. Elliott
Claims against Engineer under red FIDIC?6/2/2010Bogdan Oprea
Claim based on Revised BoQ6/1/2010Peter M. Elliott
FIDIC 1999 Lump Sum6/1/2010Peter M. Elliott
Contratual dispute6/1/2010Shan Greer
Deletion of "Zero-Items" in Lump Sum Contract6/1/2010Nasir Gilani Syed
Clause 47.2 STATUTORY AND OTHER REGULATIONS6/1/2010John Dowse
FIDIC6/1/2010Peter M. Elliott
arbitration6/1/2010Alina Valentina Oprea
FIDIC5/31/2010Peter M. Elliott
Compliance to Local Regulations5/30/2010Nasir Gilani Syed
Compliance to Local Regulations5/30/2010John Dowse
claim which not give the notice to the RE5/29/2010John Dowse
Possession of Site5/28/2010Shan Greer
Who owns excavated material in a lump sum fixed price Contract (FIDIC 4th Edition 1987)5/27/2010Peter M. Elliott
FIDIC 4th Edition 1987 Clause 48.2 (c)5/27/2010Florin NICULESCU
withdraw letter of award5/27/2010John Dowse
Inquiry about target cost contract5/26/2010Nicholas A. Brown
Inquiry about Target Cost Contract5/26/2010Peter M. Elliott
FIDIC 4th Edition 1987 Clause 48.2 (c)5/26/2010Florin NICULESCU
withdraw letter of award5/25/2010John Dowse
Roofing Contract5/24/2010John Dowse
clause 14 approval5/23/2010Peter M. Elliott
Engineer's Conflcit of Interest5/23/2010John Dowse
New Engineer5/22/2010Peter M. Elliott
consultant change5/22/2010Shan Greer
General Contractor - Subcontractor Problems5/21/2010Shan Greer
extra cutting5/21/2010Daniel Kazado
engineers decision5/21/2010John Dowse
engineers decision5/20/2010Nasir Gilani Syed
FIDIC 4th Edition 1987 Clause 53.15/20/2010Florin NICULESCU
Advance Payment Recovery5/20/2010Peter M. Elliott
Contract Drawings5/20/2010Peter M. Elliott
Advance Payment Recovery5/19/2010Peter M. Elliott
consultant change5/18/2010John Dowse
Retention Fidic 1999 - Employers Design5/18/2010Peter M. Elliott
Claim Submission5/18/2010Alina Valentina Oprea
Head Office Overhead5/18/2010Liaqat Hayat
Head Office Overhead5/18/2010Senthil Kumar Sellamuthu
Claim submission5/18/2010Senthil Kumar Sellamuthu
engineers decision5/18/2010John Dowse
variation orders5/18/2010Daniel Kazado
EOT5/17/2010Peter M. Elliott
Price Escalation5/17/2010Liaqat Hayat
Deletion in Lumpsum contract5/16/2010Peter M. Elliott
subcontractor appointed by the employer5/16/2010Peter M. Elliott
Deletion in Lumpsum contract5/16/2010Peter M. Elliott
variation orders5/15/2010Daniel Kazado
Price adjustment5/15/2010Nasir Gilani Syed
Price adjustment5/15/2010Liaqat Hayat
Variation and Calm5/14/2010Nasir Gilani Syed
Retention - FIDIC 1999 (Employer Design)5/14/2010Peter M. Elliott
Construction Procurement related5/14/2010Senthil Kumar Sellamuthu
Builders equipment left on site if not paid5/12/2010Nicholas A. Brown
Force Majeure5/12/2010Nicholas A. Brown
Builders equipment left on site if not paid5/12/2010Nicholas A. Brown
price adjustment under the DB contract5/12/2010Daniel Kazado
interim payment5/12/2010Nicholas A. Brown
Signed Day Work sheets5/12/2010John Dowse
Reinsurance of Proffesional Idemnity5/12/2010Peter M. Elliott
1) Omission OR (2) Not part of contract scope?5/11/2010John Dowse
Definition5/11/2010Nicholas A. Brown
Conditions of Contract5/11/2010John Dowse
Dayworks - FIDIC 19995/11/2010Liaqat Hayat
FIDIC Draft Contract5/11/2010Peter M. Elliott
Variation5/11/2010Peter M. Elliott
Construction Law5/11/2010Nasir Gilani Syed
Scope of Work5/10/2010Senthil Kumar Sellamuthu
delay of nominated sub contractor5/9/2010Daniel Kazado
clause 20.1 FIDIC red book 1999 (2nd paragraph)5/9/2010Senthil Kumar Sellamuthu
clause 20.1 FIDIC red book 1999 (2nd paragraph)5/9/2010Daniel Kazado
clause 20.1 FIDIC red book 1999 (2nd paragraph)5/9/2010Liaqat Hayat
clause 20.1 FIDIC red book 1999 (2nd paragraph)5/9/2010Nicholas A. Brown
clause 20.1 FIDIC red book 1999 (2nd paragraph)5/9/2010Shan Greer
clause 20.1 FIDIC red book 1999 (2nd paragraph)5/9/2010Peter M. Elliott
clause 20.1 FIDIC red book 1999 (2nd paragraph)5/9/2010Alina Valentina Oprea
clause 20.1 FIDIC red book 1999 (2nd paragraph)5/9/2010John Dowse
clause 20.1 FIDIC red book 1999 (2nd paragraph)5/9/2010Nasir Gilani Syed
Scope of Work5/9/2010Senthil Kumar Sellamuthu
Time for Completion5/9/2010Senthil Kumar Sellamuthu
omission or not part of scope5/8/2010Alina Valentina Oprea
Visas and Work Permit5/8/2010John Dowse
Discrepancy in a Lump Sum Contract5/7/2010Senthil Kumar Sellamuthu
Priority of Contract Documents5/6/2010Peter M. Elliott
Force Majeure5/6/2010Peter M. Elliott
Possession of Site5/6/2010John Dowse
ommitions5/6/2010Florin NICULESCU
Water leakage From HVAC & Plumb services5/6/2010Alina Valentina Oprea
Submission of Rates for the Provisional Sum Item5/6/2010Liaqat Hayat
Quotation for Provision Sum Item5/6/2010John Dowse
Nominated Subcontractors5/5/2010Peter M. Elliott
Nominated subcontractor5/5/2010Peter M. Elliott
Water leakage From HVAC & Plumb services5/5/2010Peter M. Elliott
Water leakage From HVAC & Plumb services5/5/2010Senthil Kumar Sellamuthu
Water leakage From HVAC & Plumb services5/5/2010Bogdan Oprea
Nominated Subcontractors5/5/2010Peter M. Elliott
Nominated subcontractor5/5/2010Peter M. Elliott
building and civil contract5/4/2010Alina Valentina Oprea
Survey errors5/4/2010Shan Greer
Omissions5/4/2010Nasir Gilani Syed
building and civil contract5/4/2010Alina Valentina Oprea
Cost of idle equipment due to prolongation of time for completion5/3/2010Senthil Kumar Sellamuthu
Omissions5/3/2010Nasir Gilani Syed
Reducing Advance Payment.5/2/2010Alina Valentina Oprea
Reducing Advance Payment.5/2/2010Alina Valentina Oprea
Substantial completion5/2/2010Peter M. Elliott
Fit for Purpose5/2/2010Shan Greer
Book Reference5/2/2010Peter M. Elliott
DAB Member5/1/2010Alina Valentina Oprea
JCT 2005 - Liqudated damages + penalty provision4/30/2010Nicholas A. Brown
Disclosure of Information4/30/2010Senthil Kumar Sellamuthu
building and civil contract4/29/2010Alina Valentina Oprea
surplus materials4/29/2010Senthil Kumar Sellamuthu
Delay4/29/2010Peter M. Elliott
Discount applicable to Variations4/29/2010John Dowse
Variation Question4/28/2010Peter M. Elliott
Omissions in a lump sum contact4/28/2010Bogdan Oprea
Delay4/28/2010Daniel Kazado
Right of Employer4/28/2010Liaqat Hayat
Right of Employer4/28/2010Liaqat Hayat
lumpsum contract4/27/2010Senthil Kumar Sellamuthu
lump sum contract4/27/2010Florin NICULESCU
end of contract, re-measure4/27/2010Senthil Kumar Sellamuthu
Suspension of work4/27/2010Peter M. Elliott
important4/26/2010Bogdan Oprea
Suspension of work4/26/2010Peter M. Elliott
Value Engineering4/26/2010Peter M. Elliott
PC items in Lump Sum Contracts4/25/2010Peter M. Elliott
Right of Employer4/25/2010Liaqat Hayat
Cost claim extension of perfomance bond4/25/2010Peter M. Elliott
variation4/24/2010Shan Greer
VARIATION4/24/2010Florin NICULESCU
Discount applicable to Variations4/24/2010John Dowse
completion date4/23/2010Peter M. Elliott
Extended Priliminaries4/23/2010Peter M. Elliott
Letter of Intent4/22/2010Senthil Kumar Sellamuthu
EOT & related cost claim resolution4/22/2010Senthil Kumar Sellamuthu
EOT clain by contractor due to delay in removal of existing services .removal of services were part of this Fixed price lumpsum contract4/21/2010Senthil Kumar Sellamuthu
cessm3 and pomi4/20/2010Senthil Kumar Sellamuthu
review of contract documents4/20/2010Peter M. Elliott
Variations4/20/2010Peter M. Elliott
Site Instructions - relating to variations4/20/2010Florin NICULESCU
FIDIC Clause 444/20/2010Shan Greer
Prime Cost Rates4/20/2010Alina Valentina Oprea
urgment4/19/2010Bogdan Oprea
Assignment ,3rd party responsibility4/18/2010Shan Greer
Discrepancy in the tender documents4/18/2010John Dowse
Contractor's Scope of Work4/18/2010Daniel Kazado
cessm3 and pomi4/18/2010Senthil Kumar Sellamuthu
Novation agreement4/18/2010Nasir Gilani Syed
EOT4/18/2010Senthil Kumar Sellamuthu
force majeure4/17/2010Nasir Gilani Syed
Discrepancy in a Lump Sum Contract4/16/2010Senthil Kumar Sellamuthu
Assessment of EOT4/16/2010John Dowse
An item has priced in BOQ but not shown on drawings4/16/2010Nasir Gilani Syed
construction law4/15/2010Senthil Kumar Sellamuthu
Weightages4/14/2010Liaqat Hayat
fixation of rates under FIDIC 19994/14/2010Alina Valentina Oprea
Prerequsites to the expenditure of a provisional sum4/13/2010John Dowse
Contents of tender4/13/2010John Dowse
act by fraud, acts of prevention4/12/2010Nicholas A. Brown
design laibility4/12/2010Liaqat Hayat
Variation4/12/2010John Dowse
Acceleration4/12/2010John Dowse
Variations4/12/2010Nicholas A. Brown
design laibility4/12/2010Liaqat Hayat
prolongation cost ,4/12/2010Alina Valentina Oprea
Insurance: FIDIC 99 (Yellow Book) - Need Clarification4/11/2010Nicholas A. Brown
BOQ Items4/11/2010Senthil Kumar Sellamuthu
Contratcs4/11/2010Senthil Kumar Sellamuthu
PC Rate4/11/2010Senthil Kumar Sellamuthu
force majeure claims4/11/2010John Dowse
explain clause 19.2 fidic 19994/11/2010Liaqat Hayat
claims4/10/2010Florin NICULESCU
CAR Insurance4/10/2010Senthil Kumar Sellamuthu
Lump Sum Contract4/10/2010Senthil Kumar Sellamuthu
Work not completed4/9/2010Nicholas A. Brown
NPO4/8/2010John Dowse
Discrepancy between drawings4/8/2010Florin NICULESCU
Extension of Time4/8/2010Nasir Gilani Syed
explain clause 19.2 fidic 19994/7/2010Liaqat Hayat
Variations4/7/2010Nicholas A. Brown
Discrepancy between drawings4/7/2010Florin NICULESCU
Discrepancy between drawings4/7/2010Florin NICULESCU
Discrepancy between drawings4/7/2010Alina Valentina Oprea
Discrepancy between drawings4/7/2010Senthil Kumar Sellamuthu
dispute4/7/2010John Dowse
Force Majeure4/7/2010Nicholas A. Brown
price adjustment for carious types of steel items4/7/2010Liaqat Hayat
cancellation of building works prior to commencement4/6/2010Shan Greer
force majeure claims4/6/2010John Dowse
CAR Insurance4/6/2010Senthil Kumar Sellamuthu
Existence of Contractors Lien in the UK4/6/2010Shan Greer
Engineer or Employer determination4/6/2010Alina Valentina Oprea
interest on delayed payment4/6/2010John Dowse
CONTRA CHARGES4/6/2010John Dowse
Material At site4/5/2010Nasir Gilani Syed
Force Majeure4/5/2010Nicholas A. Brown
Lumpsum Contract - Various Issues4/5/2010Senthil Kumar Sellamuthu
Ommited Scope4/5/2010John Dowse
Contract Procedures4/4/2010Shan Greer
Performance Bond4/4/2010John Dowse
Site Intruction4/4/2010Alina Valentina Oprea
Lump Sum Contract4/4/2010Bogdan Oprea
Lump Sum Contract4/4/2010Senthil Kumar Sellamuthu
Lump Sum Contract4/4/2010John Dowse
Evaluation of Variation4/3/2010Florin NICULESCU
interest on delayed payment4/2/2010John Dowse
site possession4/1/2010Liaqat Hayat
contract administration Q4/1/2010Alina Valentina Oprea
Performance Bond4/1/2010John Dowse
FIDIC 1999 (New Red Book) - Provisional Sums & NSC3/31/2010Florin NICULESCU
Deletion3/31/2010Senthil Kumar Sellamuthu
FIDIC 1999 New Red Book - PS & NSC3/31/2010Peter M. Elliott
FIDIC-1999 New Red Book - PS&NSC3/31/2010Bogdan Oprea
FIDIC 1999 (New Red Book) - Provisional Sums & NSC3/31/2010Florin NICULESCU
Compensation3/31/2010Bogdan Oprea
deletion of BOQ item3/31/2010Florin NICULESCU
bond3/31/2010Senthil Kumar Sellamuthu
Performance Bond3/31/2010Nasir Gilani Syed
Parts3/30/2010John Dowse
Priority of Documents3/30/2010Peter M. Elliott
Priority of Documents3/30/2010Nasir Gilani Syed
Delay in Possession of Site3/30/2010John Dowse
Variation3/30/2010Liaqat Hayat
Overhead profit percentage3/30/2010Senthil Kumar Sellamuthu
site possession3/29/2010Liaqat Hayat
Consequences of termination when termination of employment by the contractor3/29/2010Daniel Kazado
FIDIC- Variation order3/29/2010Alina Valentina Oprea
P.S.3/29/2010John Dowse
post contract3/29/2010Florin NICULESCU
Value Engineering3/29/2010Peter M. Elliott
FIDIC3/29/2010Senthil Kumar Sellamuthu
Variation3/29/2010Liaqat Hayat
Overhead profit percentage3/29/2010Senthil Kumar Sellamuthu
FIDIC - Priority Of Documents3/28/2010John Dowse
FIDIC - Priority Of Documents3/28/2010John Dowse
Priority of Documents3/28/2010Nicholas A. Brown
Priority of Documents3/28/2010Nasir Gilani Syed
Certificate of Non Completion3/28/2010John Dowse
Payment for Dewatering work3/27/2010Peter M. Elliott
Quantities, Instructions, Variations3/27/2010Peter M. Elliott
contract omission3/27/2010John Dowse
Omition3/27/2010Alina Valentina Oprea
construction law3/27/2010Peter M. Elliott
Delay due to other contractor's delay3/27/2010Nicholas A. Brown
FIDIC GCC3/26/2010Peter M. Elliott
FIDIC GCC3/26/2010John Dowse
Precontraact3/26/2010Nicholas A. Brown
Return of Design Performance Bond3/26/2010Nasir Gilani Syed
Certificate of Non Completion3/26/2010John Dowse
verbal instruction3/26/2010Nicholas A. Brown
contract omission3/25/2010John Dowse
EOT claim3/25/2010Peter M. Elliott
Termination3/25/2010Nasir Gilani Syed
Rates3/25/2010Senthil Kumar Sellamuthu
method of measurments3/25/2010Alina Valentina Oprea
Variation3/25/2010Senthil Kumar Sellamuthu
Employers Claim3/24/2010Nicholas A. Brown
termination3/24/2010John Dowse
Contractors claim 20.13/24/2010Nasir Gilani Syed
Lumpsum Contract - Remeasurement3/24/2010Peter M. Elliott
Termination3/23/2010Alina Valentina Oprea
Day Works - Prelim Item3/23/2010John Dowse
Lumpsum Contract - Remeasurement3/23/2010Peter M. Elliott
Delay in Possession of Site3/23/2010John Dowse
LD's for Nominated Subcontractors3/23/2010Peter M. Elliott
FIDIC- Variation order3/22/2010Alina Valentina Oprea
unforseen adverse ground conditions3/22/2010Senthil Kumar Sellamuthu
EOT claim3/22/2010Senthil Kumar Sellamuthu
FIDIC Silver Book: sharing float3/22/2010Shan Greer
Default of contract3/22/2010Senthil Kumar Sellamuthu
Outstanding defect3/22/2010John Dowse
Variation on Tender3/22/2010Peter M. Elliott
Omission Rate3/22/2010Peter M. Elliott
Priority of Contract Documents3/21/2010Senthil Kumar Sellamuthu
Priority of Documents3/21/2010Alina Valentina Oprea
Delay Claims3/21/2010Peter M. Elliott
Ommissions3/21/2010Peter M. Elliott
Claim of Reinforcement wastage3/21/2010John Dowse
Omition3/21/2010Alina Valentina Oprea
P AND G FOR EOT3/20/2010Peter M. Elliott
Lumpsum Contract - Variation3/19/2010Senthil Kumar Sellamuthu
Cash flow3/18/2010Peter M. Elliott
Cash flow3/18/2010John Dowse
Cash flow3/18/2010Daniel Kazado
Cash flow3/18/2010Senthil Kumar Sellamuthu
Overhead and profit3/18/2010Peter M. Elliott
Termination of a contract3/18/2010Nasir Gilani Syed
Proforma Invoices for Materials on Site3/18/2010Senthil Kumar Sellamuthu
payments3/18/2010Peter M. Elliott
a llocation of activity for both employer and contactor3/17/2010Mustafa Karagoz
Evaluation3/16/2010John Dowse
Evaluation3/16/2010Senthil Kumar Sellamuthu
Unforeseen adverse ground condition3/16/2010Liaqat Hayat
Unforeseen adverse ground condition3/16/2010Daniel Kazado
Unforeseen ground condition3/16/2010Peter M. Elliott
Default in Payment by the Employer3/16/2010Daniel Kazado
Unforeseen adverse ground condition3/15/2010Liaqat Hayat
Unforeseen adverse ground condition3/15/2010Nicholas A. Brown
Unforeseen adverse ground condition3/15/2010Senthil Kumar Sellamuthu
Unforeseen adverse ground condition3/15/2010Senthil Kumar Sellamuthu
Unforeseen adverse ground condition3/15/2010Alina Valentina Oprea
Unforeseen adverse ground condition3/15/2010Senthil Kumar Sellamuthu
Unforeseen adverse ground condition3/15/2010Nasir Gilani Syed
Unforeseen adverse ground condition3/15/2010Daniel Kazado
Change the contract3/15/2010Nicholas A. Brown
Engineer's Instructions3/15/2010Nicholas A. Brown
Missing items in BOQ3/15/2010Peter M. Elliott
Lump Sum Contract3/14/2010Liaqat Hayat
Interim Payment Certificate3/14/2010Senthil Kumar Sellamuthu
Lump Sum Contract3/14/2010Shan Greer
monthly payment3/13/2010Mustafa Karagoz
Exceptionally adverse climatic conditions3/13/2010Peter M. Elliott
Construction Law : FIDIC Conditions3/13/2010Alina Valentina Oprea
Contract Termination3/12/2010Peter M. Elliott
Care of Works3/12/2010Nicholas A. Brown
Fidic 1987 reprinted 1992.clause 14.13/11/2010Peter M. Elliott
provisional sum3/11/2010Nasir Gilani Syed
FIDIC YELLOW BOOK - SPECIFICATIONS3/11/2010Alina Valentina Oprea
ITEM IN MATERIAL ON SITE3/11/2010Peter M. Elliott
Query about Extra Payment in FIDIC Yellow Book3/11/2010Nicholas A. Brown
ACCESS TO SITE3/11/2010Florin NICULESCU
issues prevent consultant to perforem his duties3/10/2010Peter M. Elliott
BOQs3/10/2010Mustafa Karagoz
FIDIC 87/92 - Clause 60.10 Time for Payment3/10/2010Peter M. Elliott
boq3/10/2010Shan Greer
Escalation on vehicles3/9/2010Liaqat Hayat
loss of profit claim3/9/2010Daniel Kazado
Care of the works3/9/2010John Dowse
Variation Valuation3/9/2010John Dowse
Legal Meaning3/9/2010Shan Greer
Defects Liability Period3/8/2010Mustafa Karagoz
Variation outside plot limits3/8/2010John Dowse
Claim for the cost difference in material.3/8/2010Nicholas A. Brown
Nominated Subcontractor3/8/2010Peter M. Elliott
loss of profit claim3/8/2010Daniel Kazado
Question on Fidic 52.23/7/2010Peter M. Elliott
Stop Of Work by the Client3/7/2010Nicholas A. Brown
Construction contracts (question)3/6/2010Shan Greer
Retention3/6/2010John Dowse
omission of quantity more than that in BOQ3/6/2010Senthil Kumar Sellamuthu
Eot3/6/2010Peter M. Elliott
Direct payments to the Subcontractors by the Employer3/5/2010Peter M. Elliott
lump sum with pc rate and provisional sum3/5/2010Peter M. Elliott
Unrealistic Price3/5/2010Mustafa Karagoz
Breakdown of Prices3/5/2010Mustafa Karagoz
Retention3/5/2010John Dowse
delay due to impossibility3/4/2010Nicholas A. Brown
Schedule Level of detail to Subcontractor3/4/2010Peter M. Elliott
variations3/4/2010Florin NICULESCU
variations3/4/2010Mustafa Karagoz
variations3/4/2010Alina Valentina Oprea
Salwa3/4/2010Senthil Kumar Sellamuthu
variations3/4/2010Florin NICULESCU
variations3/4/2010Nasir Gilani Syed
Variations3/4/2010Liaqat Hayat
PI cover3/4/2010John Dowse
Insurance3/4/2010John Dowse
Precedent of claiming to be 'Expert'3/4/2010John Dowse
Performance Bond Payment3/3/2010Shan Greer
Reclaim of escalation cost3/3/2010John Dowse
Contract Documents3/3/2010Nasir Gilani Syed
Contract Documents3/3/2010Shan Greer
Urgent - Performance Bond3/3/2010Peter M. Elliott
Extention of time & remeasurement3/3/2010Peter M. Elliott
Nomination3/2/2010Florin NICULESCU
A Dubai Project, Contract Termination, Force Majeure3/2/2010Nasir Gilani Syed
Escalated man-month rates3/2/2010Peter M. Elliott
FIDIC 1987 4th ed (amended) - Valuation of Variations3/2/2010Liaqat Hayat
Deletion of Quantities for Unit Rate Works3/2/2010Peter M. Elliott
Fit for purpose definition3/2/2010Peter M. Elliott
Lump sum contract3/1/2010Peter M. Elliott
Lump Sum Contract3/1/2010Mustafa Karagoz
Contract Termination3/1/2010Mustafa Karagoz
Contract termination3/1/2010Senthil Kumar Sellamuthu
Contract Termination3/1/2010Shan Greer
Contract Termination3/1/2010Liaqat Hayat
Fit for purpose definition3/1/2010Peter M. Elliott
Escalated man-month rates3/1/2010Peter M. Elliott
Escalated man-month rates3/1/2010Peter M. Elliott
omit part of the contract value3/1/2010Nasir Gilani Syed
Insurance3/1/2010John Dowse
basic rates for escalation2/28/2010Liaqat Hayat
Error in accepted VO2/28/2010Florin NICULESCU
Lumpsum Contract2/28/2010John Dowse
Methods of measurements of Curtain Wall of Aluminium2/27/2010Senthil Kumar Sellamuthu
Difference between Liquidated Damages and Bonus-Penalty Clause?2/26/2010Mustafa Karagoz
Liqudated Damges2/26/2010Peter M. Elliott
Retention Money.2/25/2010Shan Greer
E mails in construction law2/25/2010Peter M. Elliott
special provision to the contract: advance payment2/25/2010Mustafa Karagoz
Can the Retention Money be affecetd by Delay Damages2/25/2010Florin NICULESCU
Can the Retention Money be affecetd by Delay Damages2/25/2010Florin NICULESCU
FIDIC IV and FIDIC 19992/24/2010Senthil Kumar Sellamuthu
Quantity surveying/Lumpsum project2/24/2010Mustafa Karagoz
Advance Payment2/24/2010Liaqat Hayat
Force Majeure2/24/2010Senthil Kumar Sellamuthu
General Information2/23/2010Mustafa Karagoz
Variation order2/23/2010Peter M. Elliott
FIDIC 1987 4th ed (amended) - Valuation of Variations2/23/2010John Dowse
Duplication in Contract2/23/2010John Dowse
Duplication in Contract2/23/2010Florin NICULESCU
Termination of Subcontract upon deletion of scope of work by Employer2/22/2010Nasir Gilani Syed
Acceseration Cost Claim2/22/2010Peter M. Elliott
provisional sum2/19/2010Liaqat Hayat
Omitting a redunant item from BOQ which is not shown inthe drawings2/19/2010Nasir Gilani Syed
Variation order2/19/2010Peter M. Elliott
Termination of contract by employer2/19/2010Alina Valentina Oprea
Acceseration Cost Claim2/18/2010Peter M. Elliott
Passing on discount to Employer2/18/2010Senthil Kumar Sellamuthu
variaton2/18/2010Peter M. Elliott
variation2/18/2010John Dowse
Compliance with statutes, Regulations2/18/2010Peter M. Elliott
Escalation on Variations2/17/2010Liaqat Hayat
Acceseration Cost Claim2/17/2010Peter M. Elliott
Lumpsum Contracts2/17/2010Nasir Gilani Syed
FIDIC2/16/2010Florin NICULESCU
FIDIC2/16/2010Florin NICULESCU
FIDIC IV and FIDIC 19992/16/2010Senthil Kumar Sellamuthu
Variation2/16/2010Peter M. Elliott
renovation --how to start??2/15/2010John Dowse
EOT and Liquidated Damages2/15/2010Peter M. Elliott
Variation2/14/2010Florin NICULESCU
Variation2/14/2010Liaqat Hayat
Variation2/14/2010John Dowse
Variation2/14/2010Alina Valentina Oprea
Variation2/14/2010Peter M. Elliott
Yellow Book - Lump Sum2/14/2010Peter M. Elliott
Yellow Book - Lump Sum2/14/2010Alina Valentina Oprea
Variation2/14/2010Peter M. Elliott
Recovery of loss as a result of material price fluctuations2/11/2010Shan Greer
FIDIC2/11/2010Florin NICULESCU
P.I. Insurance2/11/2010Liaqat Hayat
retention payments2/10/2010John Dowse
acceleration cost claims2/10/2010Peter M. Elliott
P.I. Insurance2/10/2010Senthil Kumar Sellamuthu
P.I Insurance2/10/2010John Dowse
P.I Insurance and Liabilities2/10/2010Senthil Kumar Sellamuthu
P.I. Insurance2/10/2010Liaqat Hayat
TOC2/10/2010Liaqat Hayat
Time at large2/9/2010John Dowse
question2/9/2010Shan Greer
"Provisional" Items2/8/2010Peter M. Elliott
Claim / Compensation2/7/2010Alina Valentina Oprea
Variation2/7/2010John Dowse
Variation2/7/2010Peter M. Elliott
Variation in work2/7/2010Alina Valentina Oprea
variation refusal2/7/2010Senthil Kumar Sellamuthu
Time at large2/7/2010John Dowse
difference between Advance payment and Downpayment2/7/2010Florin NICULESCU
contractual issue2/6/2010Senthil Kumar Sellamuthu
Breeching of Contract2/6/2010Florin NICULESCU
Issue of Instructions2/5/2010Peter M. Elliott
Escalation on Variations2/4/2010Liaqat Hayat
Difference between claim under Clause 12.2 and 53.1 (FIDIC 1987 Re 1992).2/4/2010Liaqat Hayat
ICE Clause 112/4/2010John Dowse
delay and extension of contract2/4/2010John Dowse
13.7 Adjustments for Changes in Legislationn2/4/2010Florin NICULESCU
Engineer's Decision - FIDIC 19872/4/2010Peter M. Elliott
construction law2/3/2010Shan Greer
delay and extension of contract2/3/2010John Dowse
FIDIC interim payments2/3/2010Nasir Gilani Syed
Variation Rates2/3/2010Peter M. Elliott
EOT Claim2/3/2010Florin NICULESCU
PAYMENT ON MATERIAL ON SITE2/2/2010Florin NICULESCU
ICE Clause 112/1/2010John Dowse
MATERIALS ON SITE2/1/2010Peter M. Elliott
risk register1/31/2010Florin NICULESCU
Approved drawings1/30/2010Nasir Gilani Syed
Claim validity1/30/2010Peter M. Elliott
advance payment recovery1/30/2010Alina Valentina Oprea
As built drawing1/30/2010Peter M. Elliott
Price Adjustment in Fidic 1999 Yellow Book1/29/2010Daniel Kazado
advance payment recovery1/29/2010Alina Valentina Oprea
Price Adjustment in Fidic 1999 Yellow Book1/29/2010Daniel Kazado
Prolongation Cost1/28/2010Florin NICULESCU
Is a Contractor's proposal a variation - FIDIC 19991/28/2010Peter M. Elliott
Drafting changes in Drawings constitute a variation?1/28/2010Daniel Kazado
Excessive Counterclaim1/28/2010Shan Greer
fidic 1987 revised1/27/2010Peter M. Elliott
Surplus Material1/27/2010Senthil Kumar Sellamuthu
Arbitration1/27/2010John Dowse
Excessive Counterclaim1/26/2010Shan Greer
EOT1/24/2010Nasir Gilani Syed
Incoterms1/23/2010Nasir Gilani Syed
Case law1/22/2010Peter M. Elliott
ownership of Design1/21/2010Alina Valentina Oprea
schedule of rate contract1/21/2010Nasir Gilani Syed
Surplus Material1/20/2010Senthil Kumar Sellamuthu
Surplus Material1/20/2010John Dowse
Termination of a Nominated Subcontractor1/20/2010Alina Valentina Oprea
interim payment certificates vis-avis honouring certificates1/20/2010Alina Valentina Oprea
Interim payment certificates vis-a-avis Honouring Certificates1/20/2010John Dowse
Suspension of works1/19/2010Senthil Kumar Sellamuthu
extra costs1/19/2010John Dowse
Statement of Completion1/18/2010Peter M. Elliott
Statement of Completion1/18/2010Peter M. Elliott
Contractor Claim under Fidic Yellow Book1/18/2010Mustafa Karagoz
Contractor Claim under Fidic Yellow Book1/18/2010Liaqat Hayat
Extension of Time1/17/2010John Dowse
Extension of Time1/17/2010Daniel Kazado
Extension of Time1/17/2010Peter M. Elliott
Extension of Time1/17/2010Alina Valentina Oprea
Contractor's entitlment for suspension of Works under Clause 69.4 of the FIDC 19871/17/2010John Dowse
EoT costs1/17/2010Florin NICULESCU
EoT costs1/16/2010Liaqat Hayat
EoT costs1/16/2010Florin NICULESCU
EOT costs1/16/2010Nasir Gilani Syed
EOT costs1/16/2010Nasir Gilani Syed
28 days for Notice of Claims1/16/2010Peter M. Elliott
Ahead of the schedule1/15/2010Nasir Gilani Syed
SC 2.1 and SC 4.15 FIDIC YB 19991/15/2010Peter M. Elliott
SC 2.1 and SC 4.15 FIDIC YB 19991/15/2010Peter M. Elliott
Ahead of the schedule1/15/2010Senthil Kumar Sellamuthu
Ahead of the schedule1/15/2010Liaqat Hayat
Ahead of the schedule1/15/2010Shan Greer
Ahead of the schedule1/15/2010Nasir Gilani Syed
slowdown the progress1/15/2010Peter M. Elliott
slowdown the progress1/14/2010Peter M. Elliott
extention of time claim1/14/2010Florin NICULESCU
extention of time claim1/13/2010Florin NICULESCU
extention of time claim1/13/2010Nasir Gilani Syed
Clarification on Sub Clause 13.8 of Fidic 20061/13/2010Florin NICULESCU
FIDIC 1987 & 19991/12/2010Nasir Gilani Syed
Prolongation cost1/12/2010Florin NICULESCU
Prolongation cost1/12/2010Florin NICULESCU
fidic -4 based contract-clause 671/11/2010Alina Valentina Oprea
rate revision1/10/2010Nasir Gilani Syed
Difference in Drawings1/9/2010Senthil Kumar Sellamuthu
What is the best form of contract for me?1/8/2010Florin NICULESCU
What is the best form of contract for me?1/8/2010Florin NICULESCU
PVO1/8/2010Alina Valentina Oprea
FIDIC RED BOOK1/7/2010Nasir Gilani Syed
Advance Payment Guarantee1/7/2010Nasir Gilani Syed
Scope reduction Fidic 19991/5/2010Peter M. Elliott
FIDIC RED BOOK1/5/2010Nasir Gilani Syed
Changes within shop drawings constitute a variation1/5/2010Daniel Kazado
Retention on Variations1/5/2010Daniel Kazado
Variation Order1/4/2010Senthil Kumar Sellamuthu
Retention on Variations1/4/2010Daniel Kazado
Variation Order1/3/2010Senthil Kumar Sellamuthu
Suspension of Works1/3/2010Nasir Gilani Syed
FIDIC 1999 & FIDIC 2001/2/2010Liaqat Hayat
Contractual obligation1/2/2010Peter M. Elliott
Performance Security wrt Variation in Contract Price1/1/2010John Dowse
Force Majeure12/31/2009Senthil Kumar Sellamuthu
the engineer12/31/2009John Dowse
Fidic explanation12/30/2009Senthil Kumar Sellamuthu
changing LOGO12/29/2009Liaqat Hayat
Provisional Sum12/29/2009Peter M. Elliott
Variation12/29/2009Peter M. Elliott
EOT12/28/2009Peter M. Elliott
EOT Claims12/27/2009Peter M. Elliott
Lump sum contract with pc rates12/27/2009Nasir Gilani Syed
FIDIC 87/92 - Interim Applications/Valuations12/27/2009Senthil Kumar Sellamuthu
variations12/26/2009Alina Valentina Oprea
fidic explanation12/26/2009Senthil Kumar Sellamuthu
Construction Law- Fidic12/25/2009Nasir Gilani Syed
Contract Termination by a Contrcator12/24/2009Florin NICULESCU
Drawing and specifications12/24/2009Senthil Kumar Sellamuthu
variations12/23/2009Peter M. Elliott
The Engineer's rights under the governing Contract12/23/2009John Dowse
suspension12/23/2009Peter M. Elliott
advanced payment bank guaranty and performance bond12/23/2009Peter M. Elliott
variations12/22/2009Peter M. Elliott
variations12/22/2009Alina Valentina Oprea
Construction Law- Fidic12/22/2009Nasir Gilani Syed
income tax12/22/2009Liaqat Hayat
Awarding a provisional sum to another contractor12/20/2009Nasir Gilani Syed
Advance Payment Recovery12/19/2009Nasir Gilani Syed
Arithmetic Error in the BOQ Prices12/19/2009Daniel Kazado
nature of contract and12/18/2009Daniel Kazado
Termination of a Nominated Subcontractor12/18/2009Alina Valentina Oprea
Performance Security12/18/2009Daniel Kazado
Price adjustment in FIDIC Yellow 199912/18/2009Peter M. Elliott
Termination of a Nominated Subcontractor12/18/2009Alina Valentina Oprea
weight Shop drawing12/17/2009John Dowse
Cl.10.1 FIDIC Red Book12/17/2009Peter M. Elliott
Design Liability within FIDIC 1987-9212/17/2009Nasir Gilani Syed
EOT due to the delays from the Authorities12/17/2009Liaqat Hayat
Additional Consultants supervision fees due to the EOT/Delay12/17/2009Nasir Gilani Syed
Express terms or intentions of the parties12/15/2009John Dowse
Express terms or intentions of the parties12/15/2009Peter M. Elliott
Currency Fluctuation12/14/2009Nasir Gilani Syed
Suspended Items12/13/2009Nasir Gilani Syed
Snag list12/11/2009Nasir Gilani Syed
mark-up interpretation;FIDIC198712/11/2009Nasir Gilani Syed
Claim Problem12/11/2009Alina Valentina Oprea
billing dispute12/11/2009Shan Greer
Delay Claims12/10/2009Peter M. Elliott
Issue of Payment Certificates Clause 14.6 FIDIC 199912/10/2009Peter M. Elliott
Performance Bond AND Retention12/8/2009John Dowse
priliminaries12/7/2009Peter M. Elliott
Client Supplied Material - claim for loss of profit12/3/2009Peter M. Elliott
Cancellation of VO12/3/2009Nasir Gilani Syed
FIDIC insurance clauses12/1/2009Peter M. Elliott
hourly pay12/1/2009Shan Greer
Approval time for a quotation to a variaiton order or alteration requested by the Engineer12/1/2009Senthil Kumar Sellamuthu
Cardinal Variation11/29/2009Peter M. Elliott
Cardinal Variation11/29/2009Peter M. Elliott
Fixed Contract and Provisional SUms11/27/2009Peter M. Elliott
Defect Liability & Maintenance11/27/2009Senthil Kumar Sellamuthu
Payment for Material on site11/26/2009Peter M. Elliott
Notice for EOT under FIDIC 1987 4th Edition11/25/2009Florin NICULESCU
Notice for EOT under FIDIC 1987 4th Edition11/25/2009Florin NICULESCU
Claim for additional overhead for EOT11/25/2009Peter M. Elliott
construction law11/24/2009John Dowse
construction law11/24/2009Peter M. Elliott
construction law11/24/2009Shan Greer
Variation Order11/24/2009Daniel Kazado
Variation Order11/24/2009Alina Valentina Oprea
Variation Order11/24/2009Peter M. Elliott
Variation Order11/24/2009Senthil Kumar Sellamuthu
Omissions11/24/2009Daniel Kazado
Delay Cost for EOT11/24/2009John Dowse
Claim for additional overhead for EOT11/24/2009Peter M. Elliott
Variation Order11/23/2009Peter M. Elliott
Variation Order11/23/2009John Dowse
Variation Order11/23/2009Daniel Kazado
Variation Order11/23/2009Senthil Kumar Sellamuthu
Variation Order11/23/2009Alina Valentina Oprea
Omissions11/23/2009Daniel Kazado
Omissions11/23/2009Nasir Gilani Syed
Omissions11/23/2009Nasir Gilani Syed
Omissions11/23/2009Daniel Kazado
FIDIC - Omission11/23/2009Senthil Kumar Sellamuthu
Variations11/23/2009John Dowse
EOT & LD11/23/2009Shan Greer
NEW BOQ11/22/2009Peter M. Elliott
Payment Dispute- Nominated Subcontract11/22/2009Florin NICULESCU
Liquidated Damage & Penalty11/22/2009Senthil Kumar Sellamuthu
Liquidated Damage & Penalty11/22/2009Nasir Gilani Syed
Variations11/22/2009Shan Greer
FIDIC LAWS11/21/2009Senthil Kumar Sellamuthu
New BOQ after deduction of Works11/21/2009Peter M. Elliott
EOT & LD11/21/2009Shan Greer
Variations11/20/2009Shan Greer
New BOQ after deduction of Works11/20/2009Liaqat Hayat
New BOQ after deduction of Works11/20/2009Peter M. Elliott
Roofing Contract11/19/2009Mustafa Karagoz
Price Adjustment11/19/2009Florin NICULESCU
New BOQ after deduction of Works11/19/2009Peter M. Elliott
New BOQ after deduction of Works11/19/2009Liaqat Hayat
New Contract Amount after deduction of Works11/19/2009Shan Greer
Difect Liability11/19/2009Alina Valentina Oprea
Increase of performance guarantee11/19/2009Peter M. Elliott
Variations11/18/2009John Dowse
Preliminaries and general11/18/2009Nasir Gilani Syed
Remeasurable items in Lumsum Contract - reg11/18/2009Alina Valentina Oprea
Direct Payment To Nominated Subcontractor11/18/2009Shan Greer
"Contract Coart Case Desision " & "Settlement of Disputes and Arbitration"11/18/2009Florin NICULESCU
Increase in Material Prices11/17/2009John Dowse
Variation of Lump Sum Items in BOQ11/17/2009Nasir Gilani Syed
Claims - Coral Found During Excavation11/17/2009Peter M. Elliott
Termination by Employer11/17/2009John Dowse
engineers decision11/14/2009Liaqat Hayat
Design Revision FIDIC 1999 Yellow Book11/13/2009Alina Valentina Oprea
EOT - adjustments11/13/2009Liaqat Hayat
construction law11/12/2009Liaqat Hayat
construction law11/12/2009Shan Greer
Clause 53.111/11/2009Liaqat Hayat
Role of Engineer and Employer11/11/2009Daniel Kazado
EOT clause 44.1.FIDIC 198711/11/2009Senthil Kumar Sellamuthu
FIDIC - Taking Over of Parts of the Works11/10/2009Peter M. Elliott
Issue of Payment Certificates Clause 14.6 FIDIC 199911/10/2009Peter M. Elliott
recovery of consultant fees from Contractor11/10/2009Peter M. Elliott
Suspension of Works11/9/2009John Dowse
Prolongation11/9/2009John Dowse
Variation clause 51.1 fidic-198711/8/2009Liaqat Hayat
what is fidic11/8/2009Liaqat Hayat
OH&P on omissions11/8/2009John Dowse
Duplicated items11/7/2009Peter M. Elliott
Rates for VO11/7/2009Peter M. Elliott
Case law on Suspension and Termination of Works by Contractor11/6/2009Shan Greer
Suspension of Works11/6/2009Senthil Kumar Sellamuthu
Delayed Payment of Advance Payment11/6/2009Peter M. Elliott
Site Instruction11/6/2009Florin NICULESCU
Delayed Payment of Advance Payment11/4/2009Peter M. Elliott
Non-performance by plumber11/4/2009Shan Greer
Variation11/4/2009Alina Valentina Oprea
Variation11/4/2009Nasir Gilani Syed
FIDIC & Tender11/4/2009Daniel Kazado
EoT Already Awarded11/4/2009Peter M. Elliott
claim11/3/2009Florin NICULESCU
Duplicated items11/3/2009Peter M. Elliott
GMP contract11/3/2009Senthil Kumar Sellamuthu
Discrepancy in contract11/2/2009John Dowse
Discrepancy in contract11/2/2009John Dowse
FIDIC IV Clause 28.211/2/2009Liaqat Hayat
Concurrent Delay11/2/2009John Dowse
FIDIC - Provisional Sum11/1/2009Daniel Kazado
FIDIC IV Clause 28.211/1/2009Liaqat Hayat
FIDIC 198711/1/2009Nasir Gilani Syed
FIDIC 198711/1/2009Daniel Kazado
FIDIC 198711/1/2009Liaqat Hayat
letter of intent11/1/2009Senthil Kumar Sellamuthu
liquidated damages clause 47.2 in fidic - 411/1/2009Alina Valentina Oprea
Scope of Work Reduction11/1/2009Nasir Gilani Syed
FIDIC IV Clause 28.210/31/2009Liaqat Hayat
Selecting the right Subcontract10/31/2009John Dowse
EOT Claim10/31/2009Florin NICULESCU
Duplicated items10/31/2009John Dowse
LIEN RIGHTS10/30/2009Alina Valentina Oprea
FIDIC Q10/30/2009Shan Greer
Action against the contractor - contractual options10/30/2009Shan Greer
Tender Document Error10/30/2009John Dowse
Price Adjustment Formula10/30/2009Liaqat Hayat
Scope of Work Reduction10/30/2009Nasir Gilani Syed
Calculation of Liquidated Damages10/29/2009John Dowse
Tendering procedure for shedule of rate contract10/29/2009Florin NICULESCU
Action against the contractor - contractual options10/29/2009Liaqat Hayat
Construction Contract10/29/2009Alina Valentina Oprea
Lumpsum contract versus clauses10/28/2009John Dowse
Clarification10/28/2009Senthil Kumar Sellamuthu
Time extension10/28/2009Florin NICULESCU
L.S. contract10/28/2009Senthil Kumar Sellamuthu
FIDIC 1987 4th edition (amended)10/28/2009John Dowse
Cost claim for EOT10/28/2009Senthil Kumar Sellamuthu
Design Defects10/27/2009Florin NICULESCU
Design Defects10/27/2009Daniel Kazado
Design Defects10/27/2009Peter M. Elliott
uae civil code10/27/2009Senthil Kumar Sellamuthu
Design Defects10/27/2009Liaqat Hayat
l.s contract10/27/2009Peter M. Elliott
Provisional Sums - FIDIC - 199910/27/2009Peter M. Elliott
Delay damages10/27/2009Florin NICULESCU
design defects10/27/2009Nasir Gilani Syed
time at large and performance guarantee call10/27/2009Peter M. Elliott
Prime Cost sums10/27/2009Shan Greer
Verbal construction agreement10/26/2009Peter M. Elliott
Revision of rates10/26/2009Peter M. Elliott
l.s contract10/26/2009Peter M. Elliott
L.S. contract10/26/2009Senthil Kumar Sellamuthu
design defects10/26/2009Nasir Gilani Syed
FIDIC 1987 4th edition (amended)10/25/2009John Dowse
Contractor quiting the job10/25/2009Senthil Kumar Sellamuthu
Prime cost sums10/25/2009Senthil Kumar Sellamuthu
Verbal construction agreement10/24/2009Peter M. Elliott
Dispute in BOQ Item description10/24/2009Peter M. Elliott
Descrepency between Tender Drawing and Boq10/24/2009Senthil Kumar Sellamuthu
VALUATION APPLICATION DURING SUSPENSION OF WORK10/24/2009John Dowse
FIDIC10/24/2009Liaqat Hayat
Dispute in BOQ Item description10/24/2009Peter M. Elliott
Contractor quiting the job10/24/2009Senthil Kumar Sellamuthu
JCT SBC 05/0910/23/2009John Dowse
Claiming retention money10/23/2009Florin NICULESCU
Payment if Contract Terminated - Repatriation10/23/2009John Dowse
Descrepency between Tender Drawing and Boq10/22/2009Senthil Kumar Sellamuthu
Payment for the cost of providing a Performance Security10/22/2009Florin NICULESCU
Payment for the cost of providing a Performance Security10/22/2009Florin NICULESCU
Dealy of Payment10/22/2009Daniel Kazado
fidic 1987-Price adjustment10/22/2009Peter M. Elliott
WITHOUT PREJUDICE NOTICES10/22/2009Peter M. Elliott
daywork rates10/22/2009Liaqat Hayat
daywork rates10/21/2009Liaqat Hayat
21 days for TOC10/21/2009John Dowse
fidic 1987-Price adjustment10/21/2009Peter M. Elliott
reinforcement in concrete10/19/2009Nasir Gilani Syed
Quasi Contracts10/19/2009Senthil Kumar Sellamuthu
Payment if Contract Terminated - Repatriation10/19/2009John Dowse
Subcontractibg10/19/2009Alina Valentina Oprea
Deletion of Provisional Sum/GMP10/18/2009Senthil Kumar Sellamuthu
clarification on FIDIC 1987 contract10/18/2009Liaqat Hayat
clarification on FIDIC 1987 contract10/18/2009Florin NICULESCU
clarification on FIDIC 1987 contract10/18/2009Senthil Kumar Sellamuthu
clarification on FIDIC 1987 contract10/18/2009Daniel Kazado
clarification on FIDIC 1987 contract10/18/2009Nasir Gilani Syed
Contract Sum Definition10/16/2009John Dowse
Suspension and Termination10/16/2009Peter M. Elliott
FIDIC red book clause # 14.1410/15/2009Senthil Kumar Sellamuthu
Termination under Clause 19.710/15/2009Florin NICULESCU
fidic 1987-199210/15/2009Peter M. Elliott
associated cost of ETO10/15/2009Peter M. Elliott
Delays10/15/2009Senthil Kumar Sellamuthu
GCC for OPRC Contracts10/14/2009John Dowse
FIDIC CLAUSE 20.110/14/2009Peter M. Elliott
fidic 1987-199210/13/2009Peter M. Elliott
Preliminaries payments10/13/2009John Dowse
Defects10/12/2009Daniel Kazado
works payale on termination10/11/2009John Dowse
LOI10/11/2009Florin NICULESCU
FIDIC vs. NEC10/10/2009Senthil Kumar Sellamuthu
Defects10/9/2009Daniel Kazado
Fidic 1987-199210/8/2009Florin NICULESCU
Standby Claim10/8/2009Peter M. Elliott
Performance security-fidic iv 1987 reprinted 199210/8/2009Nasir Gilani Syed
Standby Claim10/7/2009Peter M. Elliott
Additional claim for Sheet piling works10/7/2009Alina Valentina Oprea
Condition of subcontract10/7/2009Daniel Kazado
Condition of subcontract10/7/2009Nasir Gilani Syed
arbitration time10/7/2009Peter M. Elliott
Discrepancy between TS & Drawings10/6/2009Nasir Gilani Syed
Quality of work10/5/2009Nasir Gilani Syed
construction10/5/2009Nasir Gilani Syed
Lump sum contract10/5/2009Nasir Gilani Syed
Claims for reduced contract works10/5/2009Peter M. Elliott
Duplicated items in BOQ10/3/2009Florin NICULESCU
Duplicated items in BOQ10/3/2009Florin NICULESCU
Fidic sub clause 12.3; Red Book 199910/3/2009John Dowse
BOQ Quantities10/3/2009Nasir Gilani Syed
Reduction of Time of the projet10/3/2009Nasir Gilani Syed
ADJUSTMENTS FOR CHANGES IN COST10/2/2009John Dowse
Claims for reduced contract works10/2/2009Peter M. Elliott
Claims for reduced contract works10/1/2009Peter M. Elliott
nominated subcontractor10/1/2009Alina Valentina Oprea
BOQ Quantities10/1/2009Nasir Gilani Syed
EOT9/30/2009John Dowse
Reduction of Time of the projet9/30/2009Nasir Gilani Syed
Claims for reduced contract works9/30/2009Peter M. Elliott
Withdrawal of approval of programme9/30/2009Peter M. Elliott
Contract9/29/2009John Dowse
Extension of time9/29/2009Peter M. Elliott
Extension of time9/29/2009Liaqat Hayat
Extension of time9/28/2009Peter M. Elliott
Extension of time9/28/2009Liaqat Hayat
Application of Price Adjustment Factor9/28/2009John Dowse
FIDIC 1999 Fluctuations9/28/2009Peter M. Elliott
FIDIC 1999 Fluctuations9/27/2009Peter M. Elliott
Extension of time9/27/2009Liaqat Hayat
Measurement and evaluation9/26/2009Peter M. Elliott
Revised Baseline Programme9/26/2009Peter M. Elliott
Fidic Red Book 1999 Edition- Re-measurment Contract9/26/2009Peter M. Elliott
quality9/26/2009John Dowse
Revised Baseline Programme9/26/2009Peter M. Elliott
works suspension9/26/2009John Dowse
Evaluation sub-clause 12.3 ; Fidic 1999 red book, re-measurement9/25/2009John Dowse
contractor breached a contract with subcontractor9/25/2009Florin NICULESCU
Fidic Red Book 1999 Edition- Re-measurment Contract9/25/2009Peter M. Elliott
FIDIC 1999 Fluctuations9/24/2009Peter M. Elliott
Lump sum contracts9/24/2009Florin NICULESCU
Assessment of EOT Claims under FIDIC 19999/23/2009Peter M. Elliott
Nominated/Named subcontractor9/23/2009John Dowse
Construction Law: failure to perform9/22/2009Peter M. Elliott
FIDIC claims9/22/2009Nasir Gilani Syed
Type of duration in FIDIC9/22/2009Liaqat Hayat
Builder keeps delaying closing date9/20/2009John Dowse
variation work9/19/2009Nasir Gilani Syed
Fidic; Value Engineering9/18/2009Peter M. Elliott
works suspension9/18/2009John Dowse
Letter of intent9/18/2009Nasir Gilani Syed
Escalation9/18/2009Florin NICULESCU
Contractor's Claim9/17/2009Alina Valentina Oprea
Omission of NSC Works9/17/2009Peter M. Elliott
Suspension of Contract9/17/2009Nasir Gilani Syed
Change of Method of Contraction - A Variation?9/17/2009Peter M. Elliott
Contractor's Claim9/16/2009Alina Valentina Oprea
Force Majeure9/16/2009John Dowse
Suspension of Contract9/16/2009Nasir Gilani Syed
Sectional Handing Over9/16/2009Alina Valentina Oprea
tiling works 2 yrs 7 mths ago9/16/2009John Dowse
PAYMENTS FOR PILE WORKS IN DESIGN BUILD LUMPSUM CONTRACTS9/16/2009Peter M. Elliott
Over head and Profit9/16/2009Nasir Gilani Syed
Advance payment9/15/2009Nasir Gilani Syed
Builder keeps delaying closing date9/15/2009John Dowse
Delay of payment due date9/15/2009Nasir Gilani Syed
Design NOC for MEP works- ADDC-Electrical / Water / Etisalat / Civil defence9/15/2009Nasir Gilani Syed
Building Dispute9/15/2009Liaqat Hayat
Remeasurable contract9/15/2009Nasir Gilani Syed
Nominated Subcontract under FIDIC 1999 Yellow Book9/15/2009Peter M. Elliott
Parent company guarantee9/15/2009Liaqat Hayat
breech of contract by owner9/14/2009Peter M. Elliott
A broken contract9/14/2009Peter M. Elliott
deductions of payment9/14/2009Florin NICULESCU
Discrepancy in Contract Documents (FIDIC-Short Form)9/14/2009John Dowse
Parent company9/14/2009Liaqat Hayat
Building Dispute9/13/2009Liaqat Hayat
Loss of natural light9/13/2009Florin NICULESCU
Nominated Subcontract under FIDIC 1999 Yellow Book9/11/2009Peter M. Elliott
Prolongation of Design and Supervision Services9/9/2009John Dowse
Compensation9/8/2009John Dowse
Extension of Time9/8/2009Peter M. Elliott
Cost During Time At Large9/8/2009Peter M. Elliott
Cost During Time At Large9/8/2009Peter M. Elliott
Price Escalation Clause9/7/2009Liaqat Hayat
deleting works in lump sum project9/7/2009Peter M. Elliott
Using BOQ figures to reevaluate Lump Sum contract9/7/2009Peter M. Elliott
Succession of a Subcontractprs Quotation9/7/2009Peter M. Elliott
Using BOQ figures to reevaluate Lump Sum contract9/7/2009Peter M. Elliott
Preliminaries Sum9/3/2009Florin NICULESCU
Preliminary sum9/3/2009Florin NICULESCU
OHP for extra items9/3/2009John Dowse
Preliminaries items in Bill of Quantities9/2/2009John Dowse
OH&P on Variations9/1/2009John Dowse
FIDIC cl 69.19/1/2009John Dowse
Regarding performance Security9/1/2009John Dowse
MATERIAL AT SITE9/1/2009John Dowse
NSC Appointing NSC's9/1/2009Nasir Gilani Syed
Turnkey Solutions8/31/2009Florin NICULESCU
Retry8/28/2009Peter M. Elliott
Risk and Force Majeure8/27/2009Liaqat Hayat
FIDIC - Sub Clause 7.8 (Royalties)8/26/2009Peter M. Elliott
Pain and gain in cost plus projects8/26/2009Florin NICULESCU
Statement at Completion8/26/2009Peter M. Elliott
Pain and gain in cost plus projects8/26/2009Florin NICULESCU
Loss of Profit and Overheads8/26/2009Peter M. Elliott
Prelimnaries and Fluctuations8/26/2009Peter M. Elliott
advance payment8/25/2009Florin NICULESCU
payment and material on site8/25/2009Peter M. Elliott
plastering work8/25/2009Peter M. Elliott
FIDIC Red Book - failure to extend validity of performance security8/24/2009Peter M. Elliott
Shady General Contractor8/24/2009Liaqat Hayat
14.8 Delayed Payment8/22/2009Peter M. Elliott
provisional sum and prime cost8/22/2009Florin NICULESCU
Project Manager involvement8/22/2009Peter M. Elliott
construction of villas8/22/2009Nasir Gilani Syed
Claims on EOT8/22/2009Florin NICULESCU
14.8 Delayed Payment8/22/2009Peter M. Elliott
Compliant Notices FIDIC 4th Edn8/22/2009Peter M. Elliott
Omission exceeding 15%8/22/2009John Dowse
Project Manager involvement8/21/2009Peter M. Elliott
Failure to Give Notice8/21/2009Florin NICULESCU
Compliant Notices FIDIC 4th Edn8/21/2009Peter M. Elliott
Cancellation of Engineer Approval8/21/2009Nasir Gilani Syed
provisional sum and prime cost8/21/2009Florin NICULESCU
provisinal sum8/21/2009Florin NICULESCU
Contractor Progress & Site Diary8/21/2009Florin NICULESCU
Error in BOQ8/20/2009John Dowse
construction of villas8/20/2009Nasir Gilani Syed
provisinal sum8/20/2009Florin NICULESCU
Unde utilization8/20/2009Florin NICULESCU
Applying of Delay Damages & Contract Price8/20/2009Peter M. Elliott
WARRANTY8/20/2009Liaqat Hayat
daily work sheet8/19/2009Liaqat Hayat
obstacles not mentioned8/19/2009Nasir Gilani Syed
Omission exceeding 15%8/19/2009John Dowse
FIDIC 99 contract Measurements8/19/2009Peter M. Elliott
Road contract8/19/2009Peter M. Elliott
Contract documents discrepencies8/19/2009Peter M. Elliott
Provisional sum8/19/2009John Dowse
20.1 Contractor`s Claim8/19/2009Peter M. Elliott
FIDIC 99 contract Measurements8/19/2009Peter M. Elliott
performance security (bond)8/18/2009Peter M. Elliott
FIDIC 99 contract Measurements8/18/2009Peter M. Elliott
Lump Sum Contract8/18/2009Nasir Gilani Syed
performance security (bond)8/17/2009Peter M. Elliott
Provisional Sum8/17/2009Liaqat Hayat
EPC and DB Contracts???8/17/2009Florin NICULESCU
DB and EPC contracts?8/17/2009Alina Valentina Oprea
3.1 Engineer`s Duties and Authority8/16/2009Peter M. Elliott
Omission exceeding 15%8/16/2009John Dowse
How to the Contractor in Proper way8/14/2009Florin NICULESCU
Variation procedure not in accordance with the contract8/14/2009Florin NICULESCU
Warreny on Labor8/13/2009John Dowse
Validity of B o Q8/13/2009John Dowse
OH & P8/13/2009Florin NICULESCU
Poor Quality of Workmanship8/13/2009Peter M. Elliott
Subcontract Insurances8/13/2009Florin NICULESCU
FIDIC 1999 & 2005 ( latest )8/13/2009Florin NICULESCU
FIDIC 1999 & 2005 ( latest )8/13/2009Florin NICULESCU
Excalation Mechanism8/12/2009Alina Valentina Oprea
Assessment of EOT8/12/2009Liaqat Hayat
claim against engineer8/12/2009Peter M. Elliott
Price adjustment Clause 708/12/2009Peter M. Elliott
Time Related Prelims8/10/2009John Dowse
bond / guarantee8/7/2009Florin NICULESCU
Hi Mr.8/7/2009John Dowse
bond / guarantee8/7/2009Florin NICULESCU
cabinets8/7/2009Peter M. Elliott
Clause 49.28/6/2009Nasir Gilani Syed
Clause 49.2 "as soon as practicable"8/6/2009Nasir Gilani Syed
advance payemnt8/6/2009Alina Valentina Oprea
Time At Large for entire contract?8/5/2009Peter M. Elliott
Time At Large for entire contract?8/5/2009Peter M. Elliott
recovry of the advanced payment8/4/2009Nasir Gilani Syed
Price adjustment under clause-52.38/4/2009Nasir Gilani Syed
Builder Mistake8/4/2009Peter M. Elliott
The FIDIC Construction Contract Book is a remeasurement contract8/3/2009Nasir Gilani Syed
recovry amount of advanced payment8/3/2009Florin NICULESCU
Additional Claim for Sitemanagement8/3/2009Nasir Gilani Syed
recovery for advaced payment8/2/2009John Dowse
Contract price adjustment under Sub Clause-52.3, CoC.8/2/2009Florin NICULESCU
Break down of rates8/2/2009Alina Valentina Oprea
OH & P8/2/2009Florin NICULESCU
Delayed payment & notice to suspend8/1/2009Florin NICULESCU
Contract price adjustment under Sub Clause-52.3, CoC.8/1/2009Alina Valentina Oprea
Contract price adjustment under Sub Clause-52.3, CoC.7/31/2009Florin NICULESCU
Master Format-20047/31/2009Peter M. Elliott
Contract price adjustment under Sub Clause-52.3, CoC.7/30/2009Alina Valentina Oprea
Contract price adjustment under Sub Clause-52.3, CoC.7/30/2009Florin NICULESCU
Retaining money until completion7/29/2009Peter M. Elliott
Fidic7/29/2009Peter M. Elliott
Adjustment of Contract Price7/29/2009Peter M. Elliott
Liquidated Damages Dispute7/29/2009Peter M. Elliott
Liquidated Damages Dispute7/28/2009Florin NICULESCU
Liquidated Damages Dispute7/28/2009Peter M. Elliott
FIDIC 99 - EoT and Cost Claim7/28/2009Peter M. Elliott
Construction FIDIC 19997/27/2009Florin NICULESCU
Faulty new construction7/27/2009Peter M. Elliott
FIDIC Contract MDB Book - Design Responsibility7/27/2009John Dowse
Differences between the quantities in the BoQ and the actual quantities7/27/2009Florin NICULESCU
Extension of Time (EOT)7/27/2009Peter M. Elliott
FIDIC 99' Claims7/26/2009Alina Valentina Oprea
Variation Rate7/26/2009Florin NICULESCU
What can I claim under the heading reasonable suspension costs7/26/2009Peter M. Elliott
Termination of contractor7/26/2009Nasir Gilani Syed
Loss and/or expense claim7/25/2009John Dowse
FIDIC 1987 questions.7/24/2009Florin NICULESCU
Items whose quantities are in No.'s, can the costing be changed for the same in case of a change in the size of the said object?7/24/2009Alina Valentina Oprea
Unpaid wage7/23/2009Florin NICULESCU
owner omitted 90% from the whole project7/23/2009John Dowse
claim against engineer7/23/2009Peter M. Elliott
claim against engineer7/23/2009Peter M. Elliott
termenation7/23/2009Florin NICULESCU
clause 147/23/2009Alina Valentina Oprea
third party insurance7/23/2009Nasir Gilani Syed
SIGNED PROPOSAL FOR JOB7/22/2009Nasir Gilani Syed
Faulty Work7/22/2009Liaqat Hayat
Construction Law - Variation7/22/2009Peter M. Elliott
CONSTRUCTION PROGRAM7/22/2009Peter M. Elliott
Loss and/or expense claim7/22/2009John Dowse
Suspension of works under FIDIC 1999 contract7/21/2009Peter M. Elliott
CONSTRUCTION PROGRAM7/21/2009Peter M. Elliott
Unpaid wage7/21/2009Florin NICULESCU
contract7/21/2009Peter M. Elliott
Contractor refuses to finish job he was hired and paid to do7/21/2009Peter M. Elliott
Suspension of Work Claim7/21/2009Florin NICULESCU
Non Compltion Under FIDIC7/20/2009Peter M. Elliott
DELAY DAMAGES7/20/2009Peter M. Elliott
EOT under FIDIC 19997/18/2009Peter M. Elliott
Claims for loss and/or expense7/18/2009Nasir Gilani Syed
Loss and/or expense claim7/18/2009John Dowse
Addendum to the contract7/17/2009Peter M. Elliott
site problem7/17/2009Peter M. Elliott
shot at site7/17/2009Florin NICULESCU
Loss of productivity and prolongation claims7/16/2009Florin NICULESCU
FIDIC 19877/16/2009John Dowse
site problem7/16/2009Peter M. Elliott
clause1.1.2.4 yellow FIDIC 19997/16/2009John Dowse
Consultant's Payments for Supervison7/15/2009Peter M. Elliott
Items that not in BOQ7/15/2009Alina Valentina Oprea
Contract Obligations7/14/2009Nasir Gilani Syed
Abortive Engineering works7/14/2009Nasir Gilani Syed
Valuation of Compensation Events7/13/2009John Dowse
Variations procedure7/13/2009Peter M. Elliott
Construction Law7/12/2009Alina Valentina Oprea
Variation procedure7/12/2009John Dowse
FIDIC 99 lumpsum contract scope of work7/12/2009Peter M. Elliott
FIDIC 99 lumpsum contract scope of work7/12/2009Peter M. Elliott
Profit Claim7/11/2009Nasir Gilani Syed
EPC Turnkey Project7/9/2009John Dowse
Variation - Revised Piling Length7/9/2009Nasir Gilani Syed
Temp Services - Additional Costs7/9/2009Peter M. Elliott
Variation procedure7/8/2009John Dowse
Variations7/7/2009Peter M. Elliott
Construction Contract law7/7/2009Alina Valentina Oprea
Error in the B.O.Q7/7/2009Florin NICULESCU
Loss of Profit Claim7/7/2009John Dowse
over head and profits7/7/2009John Dowse
Variations7/6/2009Peter M. Elliott
Omission of BOQ item in a lump sum non-reamure contract7/5/2009Nasir Gilani Syed
BASIS OF VARIATION7/4/2009Peter M. Elliott
Escalation formula7/4/2009Peter M. Elliott
BASIS OF VARIATION7/4/2009Peter M. Elliott
Termination of subcontract7/3/2009John Dowse
Advnace payment value7/1/2009Peter M. Elliott
Terms to be used for different completions of the project6/30/2009Florin NICULESCU
project delivery selection for a consolidated school6/29/2009Alina Valentina Oprea
Objection to Nomintated Sub-Contractors6/29/2009Florin NICULESCU
FIDIC Subcontract Agreement6/29/2009Alina Valentina Oprea
Lump Sum Contract6/29/2009Peter M. Elliott
Contractor's to mitigate6/29/2009John Dowse
advance payment for nominated subcontractor6/28/2009Nasir Gilani Syed
Depreciation of the Equipment.6/28/2009Liaqat Hayat
Assessment of Omissions6/28/2009Peter M. Elliott
Depreciation of Equipment6/28/2009Florin NICULESCU
omitting works6/27/2009Florin NICULESCU
Fidic 87-Red Book6/26/2009John Dowse
delay of payment6/26/2009Alina Valentina Oprea
variations outside the limit of site6/25/2009Peter M. Elliott
deletion of a redundant item6/24/2009Peter M. Elliott
Omtited work6/23/2009Liaqat Hayat
Omited work6/23/2009Florin NICULESCU
Assessment of Omissions6/23/2009Peter M. Elliott
Price adjustment and Secured advance6/23/2009Florin NICULESCU
Contract Obligations6/23/2009Peter M. Elliott
Nominated or Not??6/22/2009John Dowse
FIDIC AND LOCAL AUTHORITIES6/21/2009Peter M. Elliott
FIDIC AND LOCAL AUTHORITIES6/20/2009Peter M. Elliott
FIDIC AND LOCAL AUTHORITIES6/20/2009Peter M. Elliott
A Contract Without a Site Possession Clause6/20/2009Peter M. Elliott
Validity of the Subcontract.6/20/2009Florin NICULESCU
variations in lump sum projects6/19/2009Florin NICULESCU
construction drawings6/18/2009Nasir Gilani Syed
Variation6/16/2009Florin NICULESCU
construction6/15/2009Alina Valentina Oprea
Variation6/15/2009Peter M. Elliott
Dayworks6/13/2009John Dowse
Inoperable Clause6/13/2009John Dowse
Time at large6/13/2009Peter M. Elliott
Lumpsum contract6/11/2009Florin NICULESCU
Reduction of Quantity/Cost by Engineer6/10/2009Peter M. Elliott
Re: FIDIC Silver Book6/10/2009Florin NICULESCU
Right of Engineer to Reduce Quantity6/10/2009Peter M. Elliott
Time Extention Calculation6/9/2009Peter M. Elliott
Loss of Profit6/8/2009Nasir Gilani Syed
Measurement & Payment6/8/2009Peter M. Elliott
Measurement & Payment6/8/2009Peter M. Elliott
Value Engineering6/7/2009Liaqat Hayat
Fidic illustrating books6/5/2009Nasir Gilani Syed
Fidic illustrating books6/5/2009Nasir Gilani Syed
Fidic reference6/5/2009Florin NICULESCU
Fidic 87 and lump sum works6/5/2009John Dowse
Fidic 87 and lump sum works6/5/2009Nasir Gilani Syed
Measurement & Payment6/5/2009Peter M. Elliott
Loss of Profit6/5/2009John Dowse
lump sum contract diveded to items6/5/2009Peter M. Elliott
FIDIC 87 and 996/5/2009Peter M. Elliott
Construction contracts6/4/2009Liaqat Hayat
Contractor's Claim for Loss of Profit6/4/2009Nasir Gilani Syed
workdone on a sewer line6/4/2009Florin NICULESCU
site and general overhead6/2/2009Nasir Gilani Syed
Material deviation in tender evaluation5/31/2009Nasir Gilani Syed
Delay in issuance of VO5/31/2009Peter M. Elliott
Delay in issuance of VO5/31/2009Peter M. Elliott
Variations - Responsibility of Design & Construction NOC's5/30/2009Nasir Gilani Syed
Daywork rates5/29/2009John Dowse
taking over certificate5/29/2009Alina Valentina Oprea
taking over certificate5/29/2009Alina Valentina Oprea
FIDIC 87 and 995/28/2009Peter M. Elliott
Fidic 875/28/2009Nasir Gilani Syed
Fidic 87 to 995/28/2009Alina Valentina Oprea
Fidic 87 to 995/28/2009Florin NICULESCU
Fidic 875/28/2009Nasir Gilani Syed
FLUCTUATIONS5/28/2009Alina Valentina Oprea
Payment to Contractor due to Contract termination5/27/2009Florin NICULESCU
Jafza/CED/EHS/DU NOC & Additional Works required at final inspection5/27/2009Nasir Gilani Syed
Materials at Site during suspension period5/27/2009Liaqat Hayat
Payment to Contractor due to Contract termination5/27/2009Florin NICULESCU
Project Preliminaries - Tender exclusions, LOA, claims5/26/2009Nasir Gilani Syed
Project Preliminaries - Tender exclusions, LOA, claims5/26/2009Nasir Gilani Syed
fidic red book-1987-925/26/2009John Dowse
Delay in Issuance of Variation Order5/26/2009Peter M. Elliott
LOA says contracts to be completed in 3 weeks5/25/2009John Dowse
LOA says contracts to be completed in 3 weeks5/25/2009John Dowse
termination5/25/2009Alina Valentina Oprea
Extension of time5/25/2009Florin NICULESCU
Variation Order & Claim5/25/2009Peter M. Elliott
Location variation5/24/2009Peter M. Elliott
Location variation5/24/2009Peter M. Elliott
Evaluation of variations5/24/2009Peter M. Elliott
SCHEDULE OF RATES IN LUMP SUM CONTRACT5/24/2009John Dowse
Liquidated Damages for NSC5/24/2009Alina Valentina Oprea
delay of assessment of extension of time delay5/23/2009Florin NICULESCU
lump sum fixed price5/21/2009John Dowse
delay of assessment of extension of time delay5/21/2009Florin NICULESCU
Cost impact due to extension of time5/20/2009Peter M. Elliott
delay of assessment of extension of time delay5/20/2009Florin NICULESCU
loss of profit5/18/2009John Dowse
Ragrarding FIDIC5/18/2009Alina Valentina Oprea
Engineer's Instrcutions5/17/2009John Dowse
FIDIC5/17/2009Liaqat Hayat
Loss of profit5/15/2009Peter M. Elliott
Loss of profit5/15/2009John Dowse
p c rate5/15/2009Liaqat Hayat
Documents to be attached to a payment certificate5/15/2009Peter M. Elliott
p c rate5/14/2009Liaqat Hayat
verbal agreement5/14/2009John Dowse
Deletion of item from agreed Lumpsum5/14/2009Peter M. Elliott
Deletion of item from BOQ in a Lumpsum Contract5/14/2009Peter M. Elliott
Overhead Calculation Formulas5/13/2009Peter M. Elliott
Deletion of item from BOQ in a Lumpsum Contract5/13/2009Peter M. Elliott
Deletion of item from BOQ in a Lumpsum Contract5/13/2009Peter M. Elliott
Unfinished and shotty work5/12/2009Liaqat Hayat
Deletion of item from Lumpsum Contract.5/12/2009Liaqat Hayat
Nominated Subcontractors FIDIC 19995/12/2009Alina Valentina Oprea
ESCALATION IN COST UNDER FIDIC 1999 RED BOOK5/11/2009Liaqat Hayat
Nominated Subcontractors FIDIC 19995/11/2009Alina Valentina Oprea
Profit and Overhead Claim5/10/2009John Dowse
Price Adjustment under Clause-52.35/10/2009Florin NICULESCU
Introducing a Provisional Sum amount after tender award5/10/2009John Dowse
Price Adjustment under Clause-52.35/8/2009Florin NICULESCU
Lump Sum Contract5/6/2009Florin NICULESCU
Contract Price Adjustment5/5/2009Liaqat Hayat
Adverse physical obstruction5/5/2009Peter M. Elliott
VALUATION OF VARIATION5/3/2009Liaqat Hayat
new roof contract5/1/2009John Dowse
Adverse physical obstruction5/1/2009Peter M. Elliott
ICE Conditions of Contract 6th Edition5/1/2009John Dowse
Contract Price Adjustment4/30/2009Liaqat Hayat
What rate to be considered4/29/2009Peter M. Elliott
How can we cancel our contract with our Builder?4/28/2009John Dowse
Contractual advice for Construction contract4/28/2009Florin NICULESCU
Lamp Sump project4/27/2009Liaqat Hayat
Contract Agreement4/27/2009Florin NICULESCU
FIDIC 87 Clause 12.1 - Sufficiency of Tender4/24/2009John Dowse
FIDIC Red Book variationsand claims4/22/2009Alina Valentina Oprea
Engineer refuse to receieve EOT claim4/22/2009Liaqat Hayat
refuse to receive EOT claim4/22/2009Alina Valentina Oprea
Contract Agreement4/22/2009Florin NICULESCU
Escalation-Price adjustment4/22/2009John Dowse
Voiding a Warranty4/21/2009John Dowse
Force Majeure in Fidic 19994/21/2009Liaqat Hayat
FIDIC 87 Clause 12.1 - Sufficiency of Tender4/21/2009John Dowse
Please adiceas per FIDC4/20/2009John Dowse
consultant fees4/20/2009Liaqat Hayat
Clause 14 Programme4/20/2009Alina Valentina Oprea
Force Majeure in Fidic 19994/20/2009Liaqat Hayat
who is responsible legally to sign the inspection request.4/18/2009Alina Valentina Oprea
responsibilty of inspection request4/18/2009John Dowse
support the claim from FIDIC-1987 4th4/16/2009Liaqat Hayat
trying to misuse FIDIC clause4/16/2009John Dowse
trying to misuse FIDIC clause4/16/2009Liaqat Hayat
Contractor's Liability4/15/2009John Dowse
Ordering Extra Work during a period of Contractor clupable delay4/15/2009Liaqat Hayat
Ordering Extra Work during a period of Contractor clupable delay4/14/2009Liaqat Hayat
Nominated Subcontractor4/13/2009John Dowse
support the claim from FIDIC4/12/2009John Dowse
support the claim from FIDIC4/11/2009Liaqat Hayat
support the claim from FIDIC4/11/2009John Dowse
claim proceadure as per red bok 19994/11/2009Alina Valentina Oprea
Material Approval - Claim4/10/2009Florin NICULESCU
Variations4/10/2009Alina Valentina Oprea
Reshop drawing4/9/2009Liaqat Hayat
Performance Bond4/9/2009Florin NICULESCU
Scope Omission4/9/2009John Dowse
Common practice for claiming prelims.4/9/2009Peter M. Elliott
Common practice for claiming prelims.4/9/2009Peter M. Elliott
Performance Bond4/9/2009Florin NICULESCU
Termination4/8/2009John Dowse
Cancel Sub-Contract4/8/2009Liaqat Hayat
Fidic 1999 Payment after Delayed Start of Project4/7/2009Alina Valentina Oprea
Additional materials4/7/2009Liaqat Hayat
Additional Prelims4/7/2009Liaqat Hayat
Price Adjustment4/4/2009Liaqat Hayat
EOT holidays consideration4/4/2009Peter M. Elliott
13.1 Right to Vary in the DNP4/2/2009Liaqat Hayat
alternatives for the performance bond4/1/2009Alina Valentina Oprea
Variation Analysis3/31/2009Peter M. Elliott
Variation Analysis3/31/2009Peter M. Elliott
Variation Item3/29/2009Alina Valentina Oprea
Time extension3/28/2009Peter M. Elliott
Time for payment of the IPC3/28/2009Peter M. Elliott
adjudication3/28/2009John Dowse
SUBCONTRACTOR-TERMINATION3/27/2009John Dowse
tender3/27/2009Florin NICULESCU
FIDIC 1999 D&B as subcontract conditions3/27/2009Florin NICULESCU
Commencement of Works3/27/2009Peter M. Elliott
fail to report3/26/2009John Dowse
roofer causing more damage.3/26/2009John Dowse
Variation Order3/26/2009Liaqat Hayat
Employer's Risk3/26/2009John Dowse
Commencement of Works3/26/2009Peter M. Elliott
Bills of Qty3/26/2009John Dowse
DAB3/25/2009Florin NICULESCU
Variation Order3/25/2009Florin NICULESCU
Variation Order3/25/2009Peter M. Elliott
Commencement of Works3/25/2009Peter M. Elliott
Payment To Nominated Sub-Contractors3/25/2009Alina Valentina Oprea
Objection Against Nominated Subcontractor3/25/2009Florin NICULESCU
Construction Deposits3/24/2009Peter M. Elliott
Nominated Subcontractor3/24/2009Florin NICULESCU
Interpretation of Clause3/24/2009Florin NICULESCU
Substantiation for a Claim3/24/2009Peter M. Elliott
Documentation For EOT Claim3/24/2009Liaqat Hayat
Bills of Qty3/24/2009John Dowse
Variation & Price3/23/2009John Dowse
Construction Deposits3/23/2009Peter M. Elliott
Instructions3/23/2009Peter M. Elliott
Sub Contractors rights3/23/2009John Dowse
Recovery of Preliminaries Due to Variation in a Non-Critical Item3/22/2009Alina Valentina Oprea
Documentation For EOT Claim3/22/2009Liaqat Hayat
Rates for Variation Items3/22/2009John Dowse
Time for payment of the IPC3/22/2009Peter M. Elliott
Recovery of Preliminaries Due to Variation in a Non-Critical Item3/22/2009Alina Valentina Oprea
Time for payment of the IPC3/22/2009Peter M. Elliott
Instructions3/20/2009Peter M. Elliott
contract3/19/2009John Dowse
Revised baseline schedule prior to issuing Variation order3/19/2009Florin NICULESCU
Variation Orders / preliminaries/ overhead3/19/2009Florin NICULESCU
Yellow Fidic-Variations3/19/2009John Dowse
FIDIC RED BOOK Clause 12.3(a)(i)3/18/2009Alina Valentina Oprea
Clause 66.1 - FIDIC 4th3/18/2009Liaqat Hayat
Variation orders overhead / preliminaries3/17/2009Florin NICULESCU
Clause 66.1 - FIDIC 4th3/17/2009Liaqat Hayat
preliminaries & overhead3/15/2009Peter M. Elliott
contractual issues3/15/2009John Dowse
Response to RFI3/15/2009Peter M. Elliott
RFI3/15/2009John Dowse
FIDIC RED BOOK Clause 12.3(a)(i)3/14/2009Alina Valentina Oprea
sub contract agreement3/14/2009John Dowse
sub contract agreement3/13/2009John Dowse
serial delay3/12/2009Florin NICULESCU
Provisional Sums3/12/2009Florin NICULESCU
contract3/12/2009Peter M. Elliott
laws3/12/2009Florin NICULESCU
Issues Regarding Breach of Contract3/12/2009Peter M. Elliott
Evaluation of Variation3/12/2009Peter M. Elliott
retaining wall3/11/2009Alina Valentina Oprea
Dayworks Rates3/10/2009John Dowse
fidic3/10/2009Florin NICULESCU
fidic3/10/2009Florin NICULESCU
Cancelling contract3/9/2009Peter M. Elliott
Cancelling construction Contract3/9/2009Florin NICULESCU
fidic3/9/2009Florin NICULESCU
Sub-contract agreement3/9/2009John Dowse
Using Economic Downturn to Renegotiate Contracts3/9/2009John Dowse
Using Economic Downturn to Renegotiate Contracts3/5/2009John Dowse
JCT AND3/4/2009Peter M. Elliott
instructions of the Engineer3/4/2009Florin NICULESCU
Notice to Commence fidic based contract3/4/2009John Dowse
instructions of the Engineer3/4/2009Florin NICULESCU
LADs3/3/2009Peter M. Elliott
Payment of Retention Money3/3/2009John Dowse
Instruction after PAC in a delayed situation3/2/2009Florin NICULESCU
Instruction after PAC in a delayed situation3/2/2009Florin NICULESCU
Suspension of Works by Contractor3/2/2009John Dowse
EOT3/2/2009Liaqat Hayat
Variation Payment3/1/2009Florin NICULESCU
Variation payment3/1/2009Peter M. Elliott
EOT3/1/2009Liaqat Hayat
adjudication3/1/2009Peter M. Elliott
defective work2/28/2009John Dowse
How to calculate Loss of Profit?2/28/2009Liaqat Hayat
Contractor's Right for Loss of Profit2/28/2009Florin NICULESCU
Contractor's Right for Loss of Profit2/28/2009Florin NICULESCU
variation in boq2/27/2009Alina Valentina Oprea
Payment on termination2/26/2009Florin NICULESCU
Emloyers Failure to claim Liquidated Damages2/26/2009Florin NICULESCU
variation2/25/2009Peter M. Elliott
Payment for redundant BOQ items in Lump Sum Contracts2/25/2009John Dowse
FIDIC Clause 14 Programme2/25/2009Florin NICULESCU
Payment on termination2/25/2009Florin NICULESCU
New Dwelling Nightmare2/24/2009John Dowse
Emloyers Failure to claim Liquidated Damages2/24/2009Florin NICULESCU
slow progress2/24/2009Liaqat Hayat
Price Adjustment-Rebate2/23/2009Florin NICULESCU
Extension of time2/23/2009Florin NICULESCU
Delay in payment2/23/2009John Dowse
Remeasurement contract2/23/2009Florin NICULESCU
Delay in payment2/23/2009Peter M. Elliott
Delay in payment2/23/2009Alina Valentina Oprea
defective work2/22/2009John Dowse
Punchlists2/19/2009Peter M. Elliott
DAB appointment2/19/2009Alina Valentina Oprea
Price Escalation2/19/2009John Dowse
Variations, FIDIC Silver Book.2/18/2009Peter M. Elliott
Construction/ Subcontract/Lumpsum Contract2/18/2009Florin NICULESCU
construction law2/17/2009Florin NICULESCU
EOT Claim2/17/2009Florin NICULESCU
contract termination2/17/2009Florin NICULESCU
Structural excavation2/17/2009Liaqat Hayat
Construction/ Subcontract/Lumpsum Contract2/17/2009Florin NICULESCU
Delaying work due to non payment2/17/2009Liaqat Hayat
contract termination2/16/2009Florin NICULESCU
contract law2/16/2009Alina Valentina Oprea
Delaying work due to non payment2/15/2009Liaqat Hayat
Main Contractors responsiblities2/15/2009John Dowse
Omitted Items2/15/2009John Dowse
EOT2/14/2009Florin NICULESCU
Delay and Disruption, Employers Risk2/13/2009Florin NICULESCU
Subcontract termination2/12/2009Alina Valentina Oprea
Mechanic's lien2/11/2009Florin NICULESCU
the pipe for sprinkler pipe2/11/2009Alina Valentina Oprea
Materials on Site2/11/2009Peter M. Elliott
Case Law regarding FIDIC Silver Book.2/11/2009John Dowse
Materials on Site2/11/2009Peter M. Elliott
Materials on Site2/10/2009Peter M. Elliott
FIDIC 1987 4th Edition (adapted)2/10/2009Florin NICULESCU
Force Majeure2/9/2009John Dowse
design and build sub contractors2/9/2009Liaqat Hayat
Letter of intent & Termination2/8/2009Florin NICULESCU
QUESTION2/6/2009Alina Valentina Oprea
design and build sub contractors2/6/2009Liaqat Hayat
Offer Letter2/5/2009John Dowse
EOT claim, suspension of work2/5/2009John Dowse
Variations, FIDIC Silver Book.2/4/2009John Dowse
Non compliance with clause 57.2 of the red book2/4/2009John Dowse
EOT claim, suspension of work2/4/2009John Dowse
Termination for Convenvience2/3/2009John Dowse
Rebate and Claim/Variation Order2/2/2009Liaqat Hayat
how to become arbitrator1/30/2009John Dowse
escalation clause no. 13.81/30/2009John Dowse
Critical Path1/30/2009John Dowse
Cancellation of particular items in a lump sum contract1/29/2009Florin NICULESCU
FIDIC 19991/29/2009John Dowse
Cancellation of particular items in a lump sum contract1/29/2009Florin NICULESCU
Fidic D&B yellow book Cl.151/29/2009Florin NICULESCU
Cancellation of particular items in a lump sum contract1/28/2009Florin NICULESCU
Parties involved in the construction process1/28/2009John Dowse
Currency Adjustment1/27/2009Liaqat Hayat
Drywall problem1/26/2009Florin NICULESCU
loss of profit1/26/2009Florin NICULESCU
FIDIC - Currency Fluctuation Compensation1/26/2009Peter M. Elliott
Variation1/25/2009Peter M. Elliott
Variation1/25/2009Peter M. Elliott
construction law distance learning1/24/2009Peter M. Elliott
Can I call my claims as Prolongation Cost?1/24/2009Florin NICULESCU
Is there is any obligation after the expiration date of the contract between employer and consultant1/23/2009Florin NICULESCU
Is there is any obligation after the expiration date of the contract between employer and consultant1/23/2009Florin NICULESCU
What is the meaning of contract period or time1/23/2009Peter M. Elliott
Is there is any obligation after the expiration date of the contract between employer and consultant1/23/2009Liaqat Hayat
Is there is any obligation after the expiration date of the contract between employer and consultant1/22/2009Florin NICULESCU
Is there is any obligation after the expiration date of the contract between employer and consultant1/22/2009Liaqat Hayat
Refusal to VO.1/22/2009John Dowse
Re: Engineer's Decision under FIDIC1/22/2009Florin NICULESCU
FIDIC D&B contract Clause 15 Termination1/22/2009Florin NICULESCU
Extension of time claim1/22/2009Florin NICULESCU
nominated sub contractor1/22/2009Peter M. Elliott
FIDIC D&B contract Clause 15 Termination1/21/2009Florin NICULESCU
FIDIC D&B contract Clause 15 Termination1/21/2009Florin NICULESCU
Engineer's supervision/Inspection fees on Extension of Time1/21/2009Florin NICULESCU
Engineer's supervision/Inspection fees on Extension of Time1/21/2009Peter M. Elliott
cancellation of project1/21/2009Florin NICULESCU
FIDIC 1999- Contractor inability to execute part of the works1/21/2009Peter M. Elliott
Engineer's supervision/Inspection fees on Extension of Time1/21/2009Peter M. Elliott
Engineer's supervision/Inspection fees on Extension of Time1/21/2009Florin NICULESCU
Engineer's supervision/Inspection fees on Extension of Time1/21/2009Liaqat Hayat
Engineer's supervision/Inspection fees on Extension of Time1/21/2009John Dowse
change rate (specific item)1/20/2009John Dowse
cancellation of project1/20/2009Florin NICULESCU
FIDIC 1999- Contractor inability to execute part of the works1/20/2009John Dowse
FIDIC 1999- Contractor inability to execute part of the works1/20/2009Liaqat Hayat
FIDIC 1999- Contractor inability to execute part of the works1/20/2009Peter M. Elliott
New Home Overages1/20/2009Peter M. Elliott
Application of Liquidated Damages1/19/2009John Dowse
suspension cost1/17/2009Peter M. Elliott
Defective work - damages1/13/2009Peter M. Elliott
Instruction outside scope of works1/13/2009John Dowse
Testing- Delay1/13/2009Peter M. Elliott
Instruction outside scope of works1/12/2009John Dowse
Testing- Delay1/12/2009Florin NICULESCU
Testing- Delay1/12/2009Peter M. Elliott
Testing- Delay1/12/2009Liaqat Hayat
Determination of Claim1/12/2009John Dowse
Loss of Profit Claim/Calculation1/9/2009Florin NICULESCU
responsibility of the main contractor in case of nominated subcontractor1/8/2009John Dowse
engineer's inspection1/7/2009Florin NICULESCU
engineer's inspection1/7/2009Florin NICULESCU
engineer's inspection1/7/2009Florin NICULESCU
bidder as joint venture but lead partner to sign the contract1/4/2009Florin NICULESCU
wrong mix of concrete used1/2/2009Florin NICULESCU
Supplier vs Subcontractor12/31/2008Florin NICULESCU
architect verbal instruction mistaken12/30/2008John Dowse
architect verbal instruction mistaken12/30/2008Florin NICULESCU
wrong mix of concrete,realised 4 weeks later12/30/2008Kevin Magill
JCT/Q possession dates12/29/2008Kevin Magill
Additional Tests12/29/2008Kevin Magill
suspension of work12/29/2008Florin NICULESCU
JCT termination of contract12/25/2008Kevin Magill
Misuse Escalation claim12/24/2008Florin NICULESCU
Misuse Escalation claim12/24/2008Peter M. Elliott
Misuse Escalation claim12/24/2008Liaqat Hayat
Misuse Escalation claim12/24/2008Kevin Magill
order of extra works after original completion period12/24/2008Peter M. Elliott
Escalation in Consultancy Contracts12/24/2008Liaqat Hayat
suspension of work12/24/2008Florin NICULESCU
JCT termination of contract12/22/2008Kevin Magill
Negative variation & completion time12/21/2008Peter M. Elliott
Overhead & Profit12/21/2008Florin NICULESCU
Tender drawings12/20/2008Florin NICULESCU
Omission vs Warranty12/20/2008Kevin Magill
Prolongation Cost12/19/2008Peter M. Elliott
Prolongation Cost12/19/2008Florin NICULESCU
Contractor is not willing to sign the contract12/17/2008Kevin Magill
Contractor is not willing to sign the contract12/17/2008Florin NICULESCU
Contractor is not willing to sign the contract12/17/2008Peter M. Elliott
Contractor is not willing to sign the contract12/17/2008John Dowse
Breach of contract/fraud12/16/2008John Dowse
Query12/16/2008Florin NICULESCU
Penalty Calculation12/16/2008Peter M. Elliott
Completion Certificate12/15/2008Kevin Magill
seeking advise12/14/2008Liaqat Hayat
The Engineer12/14/2008Kevin Magill
Clause 52-312/13/2008Peter M. Elliott
Dewatering System12/11/2008Kevin Magill
Construction law12/11/2008Kevin Magill
Open book philosophy12/10/2008John Dowse
Acceleration costs and Premuim Time Evaluation12/10/2008Florin NICULESCU
Open book philosophy12/10/2008John Dowse
completion certificate12/7/2008Kevin Magill
The Importance of the Appendix to Tender12/7/2008John Dowse
Canceling a construction contract12/7/2008Peter M. Elliott
Lump Sums12/5/2008Florin NICULESCU
New Regulation12/4/2008John Dowse
New Regulation12/4/2008Kevin Magill
handing over12/4/2008Peter M. Elliott
Completion certificate12/4/2008John Dowse
ICE 7th claim for regulating to joints12/1/2008John Dowse
Insurances11/30/2008Peter M. Elliott
Nominated Subcontractors default11/27/2008John Dowse
noncompliance notice11/27/2008Daniel Kazado
Variation order11/27/2008Liaqat Hayat
Fidic 1999- Variation Orders11/27/2008Peter M. Elliott
Claim on Time Extension and Associate Losses11/26/2008Daniel Kazado
Appointment of the Engineer Under FIDIC 1999 (New Red Book)11/25/2008John Dowse
Claim on Time Extension and Associate Losses11/25/2008Daniel Kazado
adjustments for cost11/25/2008Daniel Kazado
Absence of Engineer from site11/25/2008Peter M. Elliott
adjustments for cost11/25/2008Daniel Kazado
Appointment of the Engineer Under FIDIC 1999 (New Red Book)11/25/2008John Dowse
Progressive Retention Bond11/24/2008John Dowse
Progressive Retention Bond11/23/2008John Dowse
Progressive Retention Bond11/23/2008Kevin Magill
Progressive Retention Bond11/23/2008Peter M. Elliott
Progressive Retention Bond11/23/2008Liaqat Hayat
scope of work11/22/2008Kevin Magill
Acceleration under FIDIC Conditions of Contract for Construction 199911/22/2008Daniel Kazado
Interim payment and monthly progress report11/20/2008Florin NICULESCU
FIDIC contracts11/19/2008Daniel Kazado
Limit of Liability11/19/2008Florin NICULESCU
Limit of Liability11/19/2008Florin NICULESCU
FIDIC 1999 Clause 13.8 Price Escalation11/19/2008Florin NICULESCU
failure of engineer/client11/18/2008Daniel Kazado
FIDIC Cl 13.811/18/2008Liaqat Hayat
FIDIC Cl 13.811/18/2008Liaqat Hayat
FIDIC contracts11/17/2008Daniel Kazado
Material on site payment11/17/2008Florin NICULESCU
Material on site payment11/16/2008Daniel Kazado
Required Detail for the Critical Path Programm11/16/2008John Dowse
Material at site either 70% of Invoice or BOQ breakdown for material11/16/2008Florin NICULESCU
Site Construction access11/16/2008Florin NICULESCU
Valuation11/15/2008Florin NICULESCU
EOT CLAIM11/15/2008John Dowse
lumpsum contract11/15/2008Daniel Kazado
Site Construction access11/14/2008Florin NICULESCU
Appointment of the Engineer Under FIDIC 9911/14/2008Peter M. Elliott
Material at site either 70% of Invoice or BOQ breakdown for material11/13/2008John Dowse
Variation Order11/12/2008Peter M. Elliott
Material at site either 70% of Invoice or BOQ breakdown for material11/12/2008Florin NICULESCU
Material at site either 70% of Invoice or BOQ breakdown for material11/12/2008John Dowse
Material at site either 70% of Invoice or BOQ breakdown for material11/12/2008Daniel Kazado
DAYWORKS SCHEDULE11/12/2008Peter M. Elliott
Window order11/11/2008Peter M. Elliott
Contractors Claim11/10/2008John Dowse
Deleting PC Sums and award to 3rd Parties11/10/2008Peter M. Elliott
Appointment of the Engineer Under FIDIC 9911/9/2008Peter M. Elliott
Appointment of the Engineer Under FIDIC 9911/9/2008Peter M. Elliott
Price Escalation11/8/2008Liaqat Hayat
clause 13.8 fidic 1999 for adjustment formula11/7/2008Peter M. Elliott
Price Escalation11/6/2008Liaqat Hayat
Application of BOQ rates11/5/2008Florin NICULESCU
fidic 1999 clause 12.4(omission)11/5/2008Florin NICULESCU
Application of BOQ rates11/5/2008Florin NICULESCU
determinatins11/4/2008Liaqat Hayat
Preliminary item released based on Time/Value related11/3/2008Liaqat Hayat
Preliminary item released based on Time/Value related11/3/2008Florin NICULESCU
Preliminary item released based on Time/Value related11/3/2008Peter M. Elliott
variation omission clause 12.4 fidic 9911/2/2008Florin NICULESCU
Preliminary item released based on Time/Value related11/2/2008Peter M. Elliott
Preliminary item released based on Time/Value related11/2/2008John Dowse
Preliminary item released based on Time/Value related11/2/2008Liaqat Hayat
Preliminary item released based on Time/Value related11/2/2008Florin NICULESCU
Civil Engineering11/1/2008Peter M. Elliott
contractor program11/1/2008John Dowse
Civil Engineering11/1/2008Florin NICULESCU
verbal agreement10/31/2008John Dowse
conpletion definitions10/30/2008Peter M. Elliott
Contract Law10/28/2008Liaqat Hayat
How to procure if there is no competition?10/27/2008Florin NICULESCU
How to procure if there is no competition?10/27/2008Florin NICULESCU
Variation order10/27/2008Peter M. Elliott
Preliminaries and General10/27/2008John Dowse
FIDIC 1999 design-build10/27/2008John Dowse
The contractor's right to stop the work10/25/2008John Dowse
Payment of Preliminary and Generals10/25/2008Peter M. Elliott
Preliminaries and General10/25/2008John Dowse
cancellation of contract10/24/2008Peter M. Elliott
FIDIC 1999 design-build10/24/2008John Dowse
Deletion of work & Reduction of contract period by Client10/23/2008Peter M. Elliott
Deletion of work & Reduction of contract period by Client10/23/2008John Dowse
new rate10/23/2008Liaqat Hayat
Escalation Mechanism10/23/2008Liaqat Hayat
Escalation Mechanism10/23/2008Peter M. Elliott
discount for additional work10/21/2008Peter M. Elliott
Variations During the DLP - FIDIC IV10/21/2008Bogdan Oprea
Misuse Clause 39.1 of FIDIC Red book 198710/21/2008Florin NICULESCU
fidic 1999 - clause 13.8 [adjustment in cost]10/18/2008Bogdan Oprea
civil engineering (fidic 1987 reprinted in 198810/18/2008Bogdan Oprea
Contractor's claim for prolongation costs FIDIC IV10/17/2008Bogdan Oprea
Construction Acceleration10/15/2008Florin NICULESCU
Price escalation(Asphalt Index adjustment)10/14/2008Florin NICULESCU
Clause 14.1 program10/14/2008Florin NICULESCU
ommisions in lump sum contract10/14/2008Florin NICULESCU
FIDIC 1999 Design-Build10/14/2008John Dowse
Clause 14.1 program10/14/2008Florin NICULESCU
Contract as an extension10/12/2008John Dowse
Unfinished Work10/11/2008Peter M. Elliott
FIDIC clause 20.110/10/2008Bogdan Oprea
Claim against an architect10/10/2008Florin NICULESCU
Certified Amount10/10/2008Florin NICULESCU
Certified Amount10/9/2008Florin NICULESCU
Material on Site Claim10/9/2008Florin NICULESCU
No completion date10/7/2008John Dowse
Price Adjustment Formula10/6/2008Liaqat Hayat
Claim For Price Escalation10/3/2008Florin NICULESCU
Price escalation by EoT and Detailed Claim10/2/2008Florin NICULESCU
builder wants more money10/1/2008John Dowse
Measurmen10/1/2008John Dowse
CAD drawings9/30/2008John Dowse
pool depth - reside in Florida9/30/2008Peter M. Elliott
Clause 51 and 529/30/2008Bogdan Oprea
Design Consultant Claim9/28/2008Florin NICULESCU
unsuitable soil9/28/2008Bogdan Oprea
loss of profit9/27/2008Florin NICULESCU
loss of profit9/27/2008Florin NICULESCU
Claims9/27/2008Florin NICULESCU
Notice to Commence9/26/2008Peter M. Elliott
Notice to Commence9/26/2008Peter M. Elliott
DAB's power9/25/2008Florin NICULESCU
landscaping/lein issue (Orlando)9/24/2008Peter M. Elliott
possession of site9/22/2008John Dowse
MoM9/22/2008John Dowse
EPC Contract9/21/2008Florin NICULESCU
MoM9/21/2008John Dowse
Converting EOT Claim Into COst claim9/21/2008Florin NICULESCU
EOT (the opposite view)9/20/2008Peter M. Elliott
FIDIC9/19/2008John Dowse
Quantification of Cost Claim9/19/2008Peter M. Elliott
physical condition9/18/2008Bogdan Oprea
EOT9/17/2008Florin NICULESCU
Claim for Extension of Time9/17/2008Florin NICULESCU
overage at final billing9/17/2008John Dowse
claiming for the removed material9/15/2008Florin NICULESCU
LS Contract9/15/2008Florin NICULESCU
Claim for Extension of Time - Unremoved Services9/14/2008Daniel Kazado
Claim for Extension of Time - Unremoved Services9/14/2008John Dowse
Claim for Extension of Time - Unremoved Services9/14/2008Peter M. Elliott
Claim for Extension of Time9/14/2008Florin NICULESCU
Inspection under FIDIC 49/14/2008Daniel Kazado
LS Contract9/14/2008Florin NICULESCU
Details in drawing under FIDIC9/13/2008John Dowse
Details in drawing under FIDIC9/11/2008John Dowse
Engineers responsibility under FIDIC 49/11/2008Peter M. Elliott
DAB Tripartite agreement9/9/2008Florin NICULESCU
Contractor Progress & Site Diary9/9/2008Florin NICULESCU
Failure to Notify under cl 44.29/9/2008John Dowse
Non-executed works in a Lump Sum Contract9/9/2008John Dowse
Contractor Progress & Site Diary9/9/2008Florin NICULESCU
Contractors responsibility9/9/2008John Dowse
Cost Saving in Lump Sum9/8/2008John Dowse
Non-executed works in a Lump Sum Contract9/8/2008John Dowse
Value Engineering9/8/2008Florin NICULESCU
Non-executed Works in a lump sum contract9/8/2008Peter M. Elliott
Remeasurement modified to Lump Sum9/8/2008Peter M. Elliott
NSC's responsibility for LD9/8/2008John Dowse
Remedy9/7/2008Daniel Kazado
Liquidity Damages9/7/2008Florin NICULESCU
Retention9/5/2008Florin NICULESCU
Retention9/4/2008Florin NICULESCU
EoT at Completion Date9/4/2008Peter M. Elliott
FIDIC short form Contract9/2/2008John Dowse
additional works issued by the employer to others8/31/2008John Dowse
Scope of work under FIDIC Contract for Plant and Design-Build Project8/29/2008Daniel Kazado
changes in pc rates8/29/2008Florin NICULESCU
Loss of contract8/29/2008John Dowse
changes in pc rates8/28/2008Florin NICULESCU
Loss of contract8/28/2008John Dowse
my rights?8/28/2008Peter M. Elliott
warranties8/27/2008Peter M. Elliott
my rights?8/27/2008Peter M. Elliott
civil engineering8/27/2008Florin NICULESCU
Contractor declared bankruptcy8/26/2008John Dowse
Ammendment in Contract8/26/2008Florin NICULESCU
subcontractor lean8/26/2008Peter M. Elliott
Insurance8/26/2008John Dowse
Progress Delay against Contractor own Programmed8/26/2008Peter M. Elliott
Unfifilled Contract8/26/2008John Dowse
payment for services not done8/24/2008John Dowse
construction programme8/24/2008Daniel Kazado
Ammendment in Contract8/24/2008Florin NICULESCU
Variations at no extra cost8/22/2008John Dowse
what our our rights8/20/2008Florin NICULESCU
what our our rights8/20/2008Florin NICULESCU
Variations at no extra cost8/20/2008John Dowse
Revised Programme8/19/2008Florin NICULESCU
Errors in description in BOQ8/18/2008Peter M. Elliott
Claim for Variaton8/18/2008Florin NICULESCU
FIDIC cluase relating to approval of shop drawings8/18/2008Florin NICULESCU
prelims8/18/2008John Dowse
Country: UAE, FIDIC CONDITIONS OF CONTRACT (FIDIC4)8/18/2008Florin NICULESCU
writing contractual letters8/16/2008Peter M. Elliott
Acceleration8/16/2008Daniel Kazado
Constructive Acceelration8/14/2008Florin NICULESCU
price escalation8/14/2008Florin NICULESCU
new home8/13/2008Peter M. Elliott
Evaluation of New Item8/13/2008Florin NICULESCU
EOT Claims for delays by authorities8/13/2008Peter M. Elliott
LD8/12/2008John Dowse
Variation of works8/12/2008John Dowse
Variations to Nominated Subcontractors8/12/2008Florin NICULESCU
new home8/12/2008Peter M. Elliott
Area Remeasure8/11/2008Bogdan Oprea
Dissertation topic8/11/2008John Dowse
Construction Law8/9/2008Bogdan Oprea
Non payment8/8/2008Bogdan Oprea
Variations and Extras in Construction Industry8/8/2008Peter M. Elliott
Breach of AIA Contract8/7/2008John Dowse
Unforseen issues8/6/2008Bogdan Oprea
EoT - provisionally agreed in principle?8/5/2008Peter M. Elliott
Breach of AIA Contract8/5/2008John Dowse
Breach of contract8/4/2008John Dowse
% of LD as per fidic8/4/2008John Dowse
Monthly Payments8/4/2008Florin NICULESCU
Price Adjustment8/2/2008Florin NICULESCU
Price Adjustment8/2/2008Florin NICULESCU
Editing of Approved Interim PC's8/1/2008Florin NICULESCU
Material on site7/30/2008Florin NICULESCU
Termination of Subcontract and defects liability7/30/2008Florin NICULESCU
variation order form7/30/2008Peter M. Elliott
Escalation7/30/2008Florin NICULESCU
Builder trying to sue me7/28/2008John Dowse
Escalation7/28/2008Florin NICULESCU
Lumpsum Contract / item7/27/2008Florin NICULESCU
Quantum of Meruit7/27/2008John Dowse
Descrepancies between Method of Measurements (MOM) and Bill Items7/26/2008John Dowse
puchase of materials7/26/2008Florin NICULESCU
Termination By Employer7/26/2008Florin NICULESCU
Contractor's Personnel Clause 6.9 Red Book 19997/26/2008John Dowse
Variations in Lumpsum Contract7/24/2008Peter M. Elliott
Authority of Engineer:: additional work to NSC7/24/2008John Dowse
Authority of Engineer:: additional work to NSC7/24/2008Peter M. Elliott
Authority of Engineer:: additional work to NSC7/24/2008Florin NICULESCU
Contract Law7/23/2008John Dowse
Authority of Engineer:: additional work to NSC7/23/2008Peter M. Elliott
Authority of Engineer:: additional work to NSC7/23/2008Florin NICULESCU
Authority of Engineer:: additional work to NSC7/23/2008John Dowse
Clause 51.1(b)7/22/2008Florin NICULESCU
Clause 52.2 FIDIC 4th Edition7/22/2008Florin NICULESCU
Clause 52.2 FIDIC 4th Edition7/22/2008Florin NICULESCU
Contract Drawing Vs BoQs7/22/2008Florin NICULESCU
Additional payment for fittings7/21/2008Florin NICULESCU
Additional payment for fittings7/21/2008Florin NICULESCU
Additional payment for fittings7/21/2008Florin NICULESCU
Claim for works not given7/21/2008Florin NICULESCU
Negative V.O in a lump sum contract7/20/2008Florin NICULESCU
Clause 52.2 FIDIC 4th Edition7/20/2008Florin NICULESCU
Claim for works not given7/20/2008Florin NICULESCU
Clause 52.2 FIDIC 4th Edition7/19/2008Florin NICULESCU
attending repairs after maintanence period7/19/2008John Dowse
Procedures for Contract Termination by Owner7/18/2008Florin NICULESCU
Procedures for Contract Termination by Owner7/18/2008Florin NICULESCU
Subcontractor Demobilization7/18/2008Florin NICULESCU
Subcontractor Demobilization7/18/2008Peter M. Elliott
Payment of Preliminaries7/18/2008Florin NICULESCU
Subcontractor Demobilization7/17/2008Daniel Kazado
Bought new built home subcontractors not paid7/17/2008Florin NICULESCU
attending repairs after maintanence period7/16/2008John Dowse
Payment of Preliminaries7/16/2008Florin NICULESCU
Lump sum contract7/15/2008Peter M. Elliott
Cost escalation clause no. 13.87/10/2008Florin NICULESCU
Prime cost7/10/2008Florin NICULESCU
Cost escalation clause no. 13.87/10/2008Florin NICULESCU
Prime cost7/9/2008Florin NICULESCU
Prime cost7/9/2008Florin NICULESCU
what a builder7/9/2008Peter M. Elliott
Property Damage7/8/2008John Dowse
repairs7/8/2008Florin NICULESCU
Site instruction and Variation order7/8/2008Peter M. Elliott
Site instruction and Variation order7/8/2008Peter M. Elliott
payments within lump sum contract7/8/2008Daniel Kazado
What a builder7/7/2008Peter M. Elliott
Clause 52 (3)7/7/2008Florin NICULESCU
Clause 527/6/2008Florin NICULESCU
Payment of Preliminaries7/5/2008Florin NICULESCU
eot7/4/2008Peter M. Elliott
Failure of Nominated Subcontractor to Perform7/3/2008Daniel Kazado
INTERIM MEASUREMENTS OF PRECAST UINTS7/1/2008Peter M. Elliott
QA/QC6/30/2008Bogdan Oprea
please lets co ordinate6/29/2008Florin NICULESCU
Updated program6/28/2008Bogdan Oprea
Change of Work Plan6/27/2008Peter M. Elliott
Site instructions6/26/2008Florin NICULESCU
Builder has not paid his subcontractor6/26/2008Peter M. Elliott
please lets co ordinate6/25/2008Florin NICULESCU
general contractor laws6/21/2008Florin NICULESCU
Who is the contractor?6/19/2008Bogdan Oprea
Interference between consultant and project management responsibilities6/18/2008Bogdan Oprea
Warranty6/18/2008Peter M. Elliott
FIDIC 1987 reprint 19886/18/2008Peter M. Elliott
Warranty6/17/2008Peter M. Elliott
Procedure for Claims6/17/2008Daniel Kazado
Procedure for Claims6/16/2008Daniel Kazado
exaggerated unit rates6/16/2008Florin NICULESCU
EOT6/16/2008Bogdan Oprea
Updated program6/16/2008Bogdan Oprea
no written contract / paid verbal amount still receiving bill6/15/2008Peter M. Elliott
Rates-Lump Sum-FIDIC 19876/14/2008Peter M. Elliott
FIDIC 1987 Art. 52.26/13/2008Peter M. Elliott
Claim6/12/2008Florin NICULESCU
Claim Dispute6/11/2008Florin NICULESCU
Payment for materials not in their final form6/11/2008Peter M. Elliott
cooling-off rules6/10/2008Bogdan Oprea
variation order6/10/2008Bogdan Oprea
mechanics lien6/9/2008Bogdan Oprea
Contractor's Preliminaries6/9/2008Florin NICULESCU
Contractor's Preliminaries6/8/2008Florin NICULESCU
lien6/8/2008Peter M. Elliott
Nomination under Fidic 4th6/4/2008Florin NICULESCU
Nomination under Fidic 4th6/4/2008Florin NICULESCU
Noninated SubContractors6/4/2008Daniel Kazado
Claims under EPC/Turnkey project silver book6/4/2008Peter M. Elliott
Realtor Problems6/3/2008Peter M. Elliott
claim6/3/2008Florin NICULESCU
Claims under EPC/Turnkey project silver book6/3/2008Peter M. Elliott
construction law6/2/2008Florin NICULESCU
Variations / Time / Cost6/1/2008Daniel Kazado
Amount For Liquidated Damages5/31/2008Bogdan Oprea
Orange Fidic Cost Escalation5/30/2008Daniel Kazado
homeowner changed mind?5/30/2008Florin NICULESCU
condition of particular application5/30/2008Florin NICULESCU
Loss of profit in claims5/29/2008Florin NICULESCU
Swimming Pool Depth5/29/2008Peter M. Elliott
P.S. Item Under FIDIC 1987 Lump Sum5/28/2008Florin NICULESCU
EoT5/28/2008Peter M. Elliott
homeowner changed mind?5/27/2008Florin NICULESCU
Variation5/27/2008Florin NICULESCU
Variation5/27/2008Florin NICULESCU
fidic- extension of time5/27/2008Florin NICULESCU
No architects cert/ no payment./delay5/26/2008Bogdan Oprea
CONTRACT ISSUES5/26/2008Daniel Kazado
Claims Vs, Variances5/25/2008Bogdan Oprea
Builder - Not paying5/24/2008Florin NICULESCU
lein5/23/2008Bogdan Oprea
PROLONGED SUSPENSION5/23/2008Daniel Kazado
general contracting5/21/2008Florin NICULESCU
general contracting5/21/2008Florin NICULESCU
No architects cert/ no payment./delay5/20/2008Bogdan Oprea
Roofing Contract5/18/2008Florin NICULESCU
Descripancy between Architectural & Structural Drawings5/18/2008Florin NICULESCU
Cracked tile.5/16/2008Peter M. Elliott
EOT claim for Material Shortage5/16/2008Peter M. Elliott
Preliminary & General Costs5/15/2008Florin NICULESCU
Cracked tile.5/14/2008Peter M. Elliott
nominated subcontractor5/14/2008Peter M. Elliott
Bad Concrete Patio5/11/2008Peter M. Elliott
EOT claim for Material Shortage5/11/2008Peter M. Elliott
Dissertation Topic5/10/2008Peter M. Elliott
verbal agreement5/10/2008Peter M. Elliott
Letter of Acceptance5/6/2008Florin NICULESCU
Lumpsum contract5/5/2008Daniel Kazado
Delayed commencement date5/3/2008Florin NICULESCU
PC rates FIDIC red book 19875/3/2008Daniel Kazado
construction law5/2/2008Florin NICULESCU
VO in a Lump sum contract4/29/2008Daniel Kazado
Letter of Acceptance4/29/2008Florin NICULESCU
VO in a Lump sum contract4/28/2008Peter M. Elliott
commencment date4/28/2008Daniel Kazado
FIDIC4/24/2008Peter M. Elliott
Hudson, Emden formula and other analysis aids4/22/2008Daniel Kazado
Constant in FIDIC price adjusment formular4/22/2008Florin NICULESCU
Compensation for Extention of Time4/22/2008Peter M. Elliott
Entitlement to be paid4/21/2008Peter M. Elliott
Prime Cost rates in Lump Sum Contracts4/19/2008Peter M. Elliott
Prime Cost rates in Lump Sum Contracts4/18/2008Peter M. Elliott
AGAIN - Variations Under 51.1 (a)4/18/2008Florin NICULESCU
Variation under Clause 51 (1)4/18/2008Florin NICULESCU
AGAIN - Variations Under 51.1 (a)4/17/2008Florin NICULESCU
PC rate (Prime Cost Rate)4/17/2008Florin NICULESCU
Discrepancies and Defective Specification4/15/2008Bogdan Oprea
Increase in price4/15/2008Florin NICULESCU
Clause 51 (1)4/15/2008Florin NICULESCU
Termination of Nominated Subcontractor4/15/2008Daniel Kazado
subcontractor contract4/15/2008Peter M. Elliott
Termination of Nominated Subcontractor4/13/2008Daniel Kazado
Ban on export of cement4/13/2008Bogdan Oprea
Ban on Export of cement4/13/2008Florin NICULESCU
price escalation clause4/12/2008Florin NICULESCU
Time and cost4/11/2008Bogdan Oprea
Time and cost4/11/2008Florin NICULESCU
Escalation and Extended OH4/9/2008Florin NICULESCU
ability of sub contractor to place a lien4/9/2008Peter M. Elliott
Contractor's Claim on Equipment Idling4/9/2008Bogdan Oprea
Adjustment for changes in price article 13.84/7/2008Florin NICULESCU
variation dispute in a concrete jobs quote4/7/2008Peter M. Elliott
final payment on a contract4/3/2008Peter M. Elliott
quantity surveying4/2/2008Florin NICULESCU
no verbal agreements clause4/1/2008Peter M. Elliott
cost load4/1/2008Florin NICULESCU
cost load3/31/2008Florin NICULESCU
ability of sub contractor to place a lien3/29/2008Peter M. Elliott
Construction Bond3/27/2008Florin NICULESCU
Allocation of Labour when projects are delayed3/26/2008Peter M. Elliott
Overage amount3/25/2008Bogdan Oprea
Construction bond3/24/2008Peter M. Elliott
Construction Bond3/24/2008Florin NICULESCU
Tender document3/23/2008Florin NICULESCU
subcontracter that got fired3/23/2008Florin NICULESCU
Variations and claims3/22/2008Daniel Kazado
Tender document3/21/2008Florin NICULESCU
Escalation costs3/20/2008Daniel Kazado
Termimnation of a standard form contact3/19/2008Peter M. Elliott
Unforeseeable physical conditions3/19/2008Peter M. Elliott
Revised Programme3/19/2008Florin NICULESCU
Revised Programme3/19/2008Bogdan Oprea
Liquidtaed Damages3/19/2008Peter M. Elliott
Variation3/17/2008Daniel Kazado
Variation3/17/2008Daniel Kazado
Basement Problems3/17/2008Peter M. Elliott
Construction Law3/15/2008Bogdan Oprea
Provisional Sums - General Costs - FIDIC IV3/14/2008Peter M. Elliott
priority of documents3/13/2008Bogdan Oprea
Employer's Requirement3/13/2008Peter M. Elliott
material cost escalation3/12/2008Peter M. Elliott
variation3/12/2008Peter M. Elliott
Variation order3/12/2008Florin NICULESCU
Employer's Requirement3/11/2008Peter M. Elliott
Claim/Variation3/11/2008Florin NICULESCU
lump sum contract3/10/2008Daniel Kazado
running costs3/9/2008Daniel Kazado
EOT3/8/2008Peter M. Elliott
EOT3/8/2008Daniel Kazado
fidic D&B '953/6/2008Florin NICULESCU
Punch List3/5/2008Peter M. Elliott
roofing contract3/5/2008Peter M. Elliott
redress of the partie’s costs of the DAB proceedings3/4/2008Md. Malik Lasker
INCLEMENT WEATHER- EXTENSION OF TIME3/4/2008Peter M. Elliott
redress of the partie’s costs of the DAB proceedings3/3/2008Florin NICULESCU
redress of the partie’s costs of the DAB proceedings3/3/2008Florin NICULESCU
redress of the partie’s costs of the DAB proceedings3/3/2008Md. Malik Lasker
Remodeling problems2/28/2008Md. Malik Lasker
Claim2/28/2008Peter M. Elliott
Claim2/28/2008Peter M. Elliott
BOQ2/26/2008Peter M. Elliott
Lean Construction2/25/2008Peter M. Elliott
Valuation of Claim2/21/2008Peter M. Elliott
conflict2/21/2008Florin NICULESCU
force account work2/20/2008Florin NICULESCU
Change Orders2/20/2008Md. Malik Lasker
New design for bridge2/20/2008Peter M. Elliott
New design for bridge2/19/2008Peter M. Elliott
Nominated Sub-Contracts2/19/2008Peter M. Elliott
suspension of works more than 84 days2/19/2008Daniel Kazado
suspension of works more than 84 days2/19/2008Daniel Kazado
Clause 20.1 FIDIC992/18/2008Daniel Kazado
Construction liens2/18/2008Florin NICULESCU
Contract canceled2/16/2008Peter M. Elliott
price adjustment2/14/2008Florin NICULESCU
LD2/12/2008Florin NICULESCU
Breach of contract? Forced closing...2/11/2008Peter M. Elliott
Variations2/11/2008Daniel Kazado
Home Owner sueing2/11/2008Md. Malik Lasker
Construction Loan - Finance Company Breach of Contract2/9/2008Florin NICULESCU
Change in Quantities2/3/2008Daniel Kazado
Extension of time and additional payment1/27/2008Daniel Kazado
Force Majeure1/26/2008Florin NICULESCU
Acceleration of works1/25/2008Bogdan Oprea
Nominated subcontractor1/24/2008Florin NICULESCU
Clause 8.41/22/2008Florin NICULESCU
Clause 8.41/22/2008Florin NICULESCU
Abandonment1/22/2008Peter M. Elliott
New home construction contract1/21/2008Florin NICULESCU
Nominated Subcontractor1/17/2008Florin NICULESCU
Concrete Failure Liability1/16/2008Bogdan Oprea
Subcontractors1/16/2008Peter M. Elliott
Cerificate of Making Good Defects1/16/2008Florin NICULESCU
Subcontractors1/15/2008Peter M. Elliott
loss of profit1/14/2008Florin NICULESCU
Nominated subcontractor1/14/2008Florin NICULESCU
Additional profit1/14/2008Peter M. Elliott
loss of profit1/13/2008Florin NICULESCU
Interpretation of Contracts1/11/2008Florin NICULESCU
Additon gone bad1/10/2008Florin NICULESCU
Interpretation of Contracts1/9/2008Florin NICULESCU
tax1/6/2008Bogdan Oprea
Right of access1/4/2008Daniel Kazado
Contractor trying to collect payment on an original bartering deal.12/29/2007Florin NICULESCU
Primecost items12/26/2007Florin NICULESCU
Proposal/Contract Potental Lawsuit12/21/2007Florin NICULESCU
Proposal/Contract Potental Lawsuit12/20/2007Florin NICULESCU
Variation and Claims12/19/2007Florin NICULESCU
Variation and Claims12/18/2007Florin NICULESCU
dealing with builder12/18/2007Florin NICULESCU
Variation order12/17/2007Florin NICULESCU
Omissions12/17/2007Florin NICULESCU
PC sums and Variations12/17/2007Daniel Kazado
Variations in Remeasurement Contracts12/17/2007Florin NICULESCU
dealing with builder12/16/2007Florin NICULESCU
Claim for idle plant12/13/2007Daniel Kazado
Parents are in last draw!12/12/2007Florin NICULESCU
Prolongation cost12/12/2007Florin NICULESCU
Parents are in last draw!12/12/2007Florin NICULESCU
PC rate items12/10/2007Bogdan Oprea
Discrepancy between 2 drawings12/10/2007Florin NICULESCU
EOT/Prolongation Cost12/8/2007Florin NICULESCU
Sea wall failure12/6/2007Florin NICULESCU
cost claim12/4/2007Peter M. Elliott
cost claim12/4/2007Florin NICULESCU
Clause 8.3 of FIDIC 199912/2/2007Bogdan Oprea
Extra work12/2/2007Florin NICULESCU
Extra work12/1/2007Florin NICULESCU
Extra work12/1/2007Peter M. Elliott
breach of contract11/30/2007Peter M. Elliott
Client decided to pay partial money due11/29/2007Peter M. Elliott
Abandonment11/29/2007Peter M. Elliott
Client wants to pause works for few months11/26/2007Florin NICULESCU
loss as a result of employer default11/21/2007Peter M. Elliott
Did my builder breach his contract?11/21/2007Florin NICULESCU
Mechanic's lien11/20/2007Peter M. Elliott
Title Insurance11/18/2007Florin NICULESCU
Contractor tries to push costs on me11/16/2007Peter M. Elliott
Title Insurance11/15/2007Florin NICULESCU
Damage done by subcontractor to personal property11/15/2007Florin NICULESCU
cost plus went way over budget11/13/2007Peter M. Elliott
Compensation for Employer Delays11/12/2007Peter M. Elliott
New roof now lien threat11/11/2007Bogdan Oprea
Prime Cost Contracts - Issues of Reimbursement11/9/2007Florin NICULESCU
New home construction Contract11/8/2007Florin NICULESCU
verbal construction warranty on remodel11/2/2007Peter M. Elliott
EOT Claim11/1/2007Peter M. Elliott
Variation work10/29/2007Daniel Kazado
Variation work10/28/2007Daniel Kazado
Mistake made during contruction- a new house10/27/2007Bogdan Oprea
claims on loss of profit.10/26/2007Florin NICULESCU
I will not pay until the work is done right10/24/2007Florin NICULESCU
Lean on house due to contractor's hot checks10/20/2007Bogdan Oprea
Contractor Pricing Error10/17/2007Peter M. Elliott
FIDIC Clause 6.310/16/2007Daniel Kazado
FIDIC Clause 6.310/16/2007Peter M. Elliott
FIDIC Clause 6.310/16/2007Bogdan Oprea
FIDIC Short Form Of Contract10/16/2007Daniel Kazado
FIDIC Short Form Of Contract10/15/2007Daniel Kazado
Prolongation Cost10/15/2007Bogdan Oprea
Interpretation of Contracts10/13/2007Florin NICULESCU
Slow payment10/13/2007Peter M. Elliott
getting paid10/11/2007Florin NICULESCU
Construction Problems10/9/2007Peter M. Elliott
Concrete contractor10/8/2007Peter M. Elliott
real estate fee10/8/2007Peter M. Elliott
small claims10/6/2007Bogdan Oprea
breakdown of unit rates10/3/2007Peter M. Elliott
Claim for loss of overhead and profit10/1/2007Peter M. Elliott
TOC9/30/2007Daniel Kazado
Discripancies between the contract BoQ and the drawing9/28/2007Bogdan Oprea
Discripancies between the contract BoQ and the drawing9/26/2007Bogdan Oprea
Construction law- Cluase 52.3 of FIDIC condition of contract9/23/2007Bogdan Oprea
Contract signage9/15/2007Bogdan Oprea
variation and claim9/11/2007Daniel Kazado
variation and claim9/11/2007Daniel Kazado
variation and claim9/11/2007Daniel Kazado
Recovery of cost for temporary accomodation9/8/2007Daniel Kazado
construction fraud9/5/2007Bogdan Oprea
time extension8/29/2007Peter M. Elliott
time extension8/28/2007Peter M. Elliott
Recovery of cost for temporary accomodation8/22/2007Peter M. Elliott
Threat of Lein8/20/2007Peter M. Elliott
FIDIC Conditions8/8/2007Peter M. Elliott
CONTRACT LAWSUIT8/8/2007Peter M. Elliott
FIDIC Conditions8/6/2007Peter M. Elliott
mechanical lien8/3/2007Peter M. Elliott
FIDIC Red Book - Extention of Time to 'Part'8/1/2007Peter M. Elliott
profit sum not included in unit rates7/28/2007Peter M. Elliott
Idle rate7/28/2007Peter M. Elliott
underutilization of machinaries7/28/2007Peter M. Elliott
FIDIC Conditions7/27/2007Peter M. Elliott
Extension of time-Fidic 4. English Law7/25/2007Peter M. Elliott
Breech of Contract?7/24/2007Peter M. Elliott
Lifetime Warranties7/24/2007Daniel Kazado
Proposal vs Written contract.7/23/2007Peter M. Elliott
Delay of project due to clients decissions7/22/2007Peter M. Elliott
Home Construction7/19/2007Peter M. Elliott
Contractor breech of contract and change orders7/19/2007Peter M. Elliott
Possession / Access to Site7/19/2007Daniel Kazado
Home Construction7/18/2007Peter M. Elliott
Management Building Contract7/17/2007Daniel Kazado
Payment of Materials delivered to site7/15/2007Peter M. Elliott
damages due to flood.7/10/2007Peter M. Elliott
damages due to flood.7/9/2007Peter M. Elliott
Omissions7/6/2007Daniel Kazado
Construction Perm Loan7/2/2007Peter M. Elliott
claim on strike6/30/2007Md. Malik Lasker
claim on strikes, n road closers6/30/2007Peter M. Elliott
construction contract6/29/2007Md. Malik Lasker
broke contract on construction project6/28/2007Md. Malik Lasker
construction6/27/2007Peter M. Elliott
Workmanship warranty situation6/26/2007Md. Malik Lasker
prolongation costs6/18/2007Peter M. Elliott
eot issue6/17/2007Peter M. Elliott
eot issue6/16/2007Peter M. Elliott
MATERIAL AT SITE PAYMENT ACCORDING TO FIDIC6/16/2007Peter M. Elliott
VO after completion6/13/2007Peter M. Elliott
prolongation costs6/13/2007Peter M. Elliott
Subcontractor's pay when paid clause6/12/2007Peter M. Elliott
breach iin contract6/12/2007Md. Malik Lasker
Re-Painting Dispute6/11/2007Bogdan Oprea
MATERIAL AT SITE PAYMENT ACCORDING TO FIDIC6/11/2007Peter M. Elliott
Shore Construction Lawsuit6/9/2007Md. Malik Lasker
Prolongation Cost associated with EoT6/6/2007Peter M. Elliott
payments6/2/2007Bogdan Oprea
Contractor's completion of "punch list" repairs5/30/2007Peter M. Elliott
Contractor estimate overrun5/26/2007Md. Malik Lasker
Warranties5/25/2007Peter M. Elliott
C 53 liciense5/25/2007Md. Malik Lasker
Warranties5/24/2007Peter M. Elliott
rebate5/23/2007Peter M. Elliott
Loss of profit in a construction project. Can we claim it?5/23/2007Peter M. Elliott
Verbal Agreement5/22/2007Bogdan Oprea
Reimbursement of custom duty.5/20/2007Peter M. Elliott
Breech of contract5/18/2007Bogdan Oprea
CONSTRUCTION LAW5/17/2007Peter M. Elliott
Dispute caused by delay5/17/2007Daniel Kazado
Wrongful Termination5/15/2007Daniel Kazado
Completion penalty clauses5/15/2007Peter M. Elliott
Wrongful Termination5/12/2007Daniel Kazado
Our builder did not follow deed restrictions5/7/2007Bogdan Oprea
clause 52.3 Variations Exceeding 15 percent5/6/2007Peter M. Elliott
clause 52.3 variations exceeding 15 percent5/6/2007Bogdan Oprea
Level of Documentation in EoT claims5/2/2007Bogdan Oprea
Instructions in writing4/30/2007Bogdan Oprea
Delay and Extension of Time4/29/2007Peter M. Elliott
Architects Instructions4/27/2007Peter M. Elliott
cancelling roofing contract4/27/2007Peter M. Elliott
Client Severely Delaying Payment4/25/2007Md. Malik Lasker
Extension of Time4/23/2007Peter M. Elliott
incomplete work4/20/2007Bogdan Oprea
basement delay4/19/2007Peter M. Elliott
what is waiver of liens4/18/2007Bogdan Oprea
Builder problems4/17/2007Peter M. Elliott
Loss of profit4/5/2007Peter M. Elliott
Discount for incomplete job performance4/2/2007Peter M. Elliott
Recourse on lien3/30/2007Peter M. Elliott
FIDIC 1987 Applicable Law3/30/2007Bogdan Oprea
refusal to pay3/29/2007Peter M. Elliott
when a builder runs out an a homeowner3/28/2007Peter M. Elliott
Construction Law3/26/2007Peter M. Elliott
Lien Waivers3/22/2007Bogdan Oprea
Nominated subcontractors3/20/2007Bogdan Oprea
Fence built on our property3/19/2007Md. Malik Lasker
Billing Dispute3/19/2007Peter M. Elliott
breach of contract?3/15/2007Peter M. Elliott
breach of contract?3/15/2007Peter M. Elliott
Can I cancel this contract3/5/2007Peter M. Elliott
Can I cancel this contract3/4/2007Peter M. Elliott
construction lien2/13/2007Peter M. Elliott
small claims court2/12/2007Peter M. Elliott
Release from Performance2/1/2007Peter M. Elliott
perliminary land evaluation1/22/2007Peter M. Elliott
getting out of a contract1/22/2007Md. Malik Lasker
AR new home tbuilder that is overrunning1/16/2007Peter M. Elliott
Slow Subcontractor1/8/2007Peter M. Elliott
clause 52.2 and 52.3 of fidic1/8/2007Peter M. Elliott
placing a lien1/5/2007Peter M. Elliott
water capacity charge12/29/2006Md. Malik Lasker
delays holding up other contractors12/28/2006Peter M. Elliott
our neighbout's new hourse12/12/2006Bogdan Oprea
Liens from materials suppliers12/12/2006Peter M. Elliott
Lien law12/6/2006Md. Malik Lasker
Building Extension12/6/2006Md. Malik Lasker
FIDIC Employers powers12/6/2006Peter M. Elliott
FIDIC Employers powers12/5/2006Peter M. Elliott
Subcontractor Dispute.11/27/2006Md. Malik Lasker
Private road11/26/2006Md. Malik Lasker
penalty for bad work performance11/25/2006Peter M. Elliott
Construction contract failure to perform11/22/2006Peter M. Elliott
remodeling contract11/21/2006Md. Malik Lasker
Contract with basement waterproofer11/20/2006Peter M. Elliott
Contract with basement waterproofer11/19/2006Peter M. Elliott
Construction11/17/2006Peter M. Elliott
Projects transfer of ownership11/16/2006Peter M. Elliott
Cancel contract11/11/2006Bogdan Oprea
PAYMENT TO CONTRACTOR11/9/2006Peter M. Elliott
legal bindance of Fidic rules11/8/2006Peter M. Elliott
Mechanics liens11/7/2006Peter M. Elliott
sub contractor payment by contractor in florida10/29/2006Peter M. Elliott
house built less than 1 yr10/28/2006Peter M. Elliott
sub contractor payment by contractor in florida10/27/2006Peter M. Elliott
Poor Workmanship Suit10/26/2006Peter M. Elliott
roof repair not done correctly10/20/2006Peter M. Elliott
Breach of Contract10/16/2006Peter M. Elliott
construction issue10/14/2006Md. Malik Lasker
Use of adjacent porperty for maintaining your own property10/13/2006Bogdan Oprea
Lien Removal10/13/2006Peter M. Elliott
non performance of contract10/13/2006Peter M. Elliott
Major Changes to a New Construction Community10/12/2006Peter M. Elliott
waiver of leins from contractor for materials and sub contractors10/11/2006Bogdan Oprea
Construction law definition10/11/2006Daniel Kazado
suing the builder10/4/2006Peter M. Elliott
Construction Warranties10/4/2006Peter M. Elliott
deposits10/3/2006Peter M. Elliott
Mechanic's Lien Time Limit Expired10/1/2006Peter M. Elliott
Construction contract failure to perform9/28/2006Peter M. Elliott
FIDIC / national construction laws9/28/2006Bogdan Oprea
PENALTY/BONUS9/27/2006Peter M. Elliott
Definitions9/27/2006Peter M. Elliott
Construction contract failure to perform9/26/2006Peter M. Elliott
Overages with fixed contract9/26/2006Peter M. Elliott
bid9/24/2006Peter M. Elliott
written estimates not signed, but verbally accepted9/23/2006Peter M. Elliott
How to Dispute an Unfair Bill9/22/2006Peter M. Elliott
Termination of lead partner9/21/2006Peter M. Elliott
disagreement on a $10,000 supervisor fee9/20/2006Peter M. Elliott
Retaining Wall9/20/2006Md. Malik Lasker
new home warranty beginning9/17/2006Bogdan Oprea
Over Head and Profit on Deleted item9/16/2006Peter M. Elliott
Breach of Contract/Not built to applicable NEC codes.9/14/2006Peter M. Elliott
When a contractor walks off the job9/13/2006Peter M. Elliott
breech of contract9/12/2006Md. Malik Lasker
Over Head and Profit on Deleted item9/11/2006Peter M. Elliott
breech of contract9/9/2006Md. Malik Lasker
Contractor dissolving without completing project or paying subcontractors9/7/2006Peter M. Elliott
contractor loses license in middle of job9/7/2006Peter M. Elliott
Valuation of material on site9/6/2006Peter M. Elliott
Valuation of material on site9/5/2006Peter M. Elliott
Cancel an Addition Contract9/3/2006Peter M. Elliott
Property Lines8/30/2006Peter M. Elliott
Rights agains poor construction8/28/2006Md. Malik Lasker
NOC8/28/2006Peter M. Elliott
Subcontractor Breach of Contract8/24/2006Peter M. Elliott
Breach of contract8/22/2006Peter M. Elliott
Construction Nightmare8/22/2006Peter M. Elliott
home warranty8/21/2006Md. Malik Lasker
contractor failing to pay subs - terminating our contract8/20/2006Peter M. Elliott
Contract8/19/2006Md. Malik Lasker
Home improvement contract enforcement8/14/2006Peter M. Elliott
Homeowners Right to move in.8/7/2006Peter M. Elliott
JOINT VENTURES8/3/2006Peter M. Elliott
FIDIC 4th ADDITION REPRINTED 19928/2/2006Tony Thomas
FIDIC 4th ADDITION REPRINTED 19928/2/2006Peter M. Elliott
breach of contract7/29/2006Peter M. Elliott
Verbal Contract - Bad Finishing Twice7/29/2006Peter M. Elliott
Undersized beam7/25/2006Peter M. Elliott
property lines/fences7/23/2006Peter M. Elliott
mechanic's lien7/21/2006Peter M. Elliott
mechanic's lien7/20/2006Peter M. Elliott
poor worksmanship and non-disclosure of information7/18/2006Peter M. Elliott
Excessive water leaks in my home7/17/2006Tony Thomas
Non-Verbal Contract7/17/2006Peter M. Elliott
Verbal Agreeements7/16/2006Peter M. Elliott
Verbal Contracts7/1/2006Peter M. Elliott
contractor abandoned job6/25/2006Peter M. Elliott
no subject6/23/2006Peter M. Elliott
silent partner requesting the final draw6/23/2006Peter M. Elliott
Customer refusing to pay on contract6/21/2006Peter M. Elliott
Unauthorized Removal of Shutters6/19/2006Peter M. Elliott
breach of contract defamation6/15/2006Peter M. Elliott
NEW CONSTRUCTION GARAGE6/13/2006Tony Thomas
deed restriction6/13/2006Peter M. Elliott
Verbal agreement6/12/2006Peter M. Elliott
Ins. approv. contractor, homeowner breached6/11/2006Tony Thomas
Fire policy paid contractor6/11/2006Peter M. Elliott
Construction Lien6/8/2006Tony Thomas
verbal contract6/8/2006Peter M. Elliott
Unsatisfactory work6/7/2006Tony Thomas
terminating contract due to fault workmanship6/5/2006Peter M. Elliott
FIDIC 4th ADDITION REPRINTED 19925/31/2006Bogdan Oprea
FIDIC 4th ADDITION REPRINTED 19925/30/2006Tony Thomas
FIDIC 4th ADDITION REPRINTED 19925/30/2006Peter M. Elliott
FIDIC 4th ADDITION REPRINTED 19925/30/2006Bogdan Oprea
Contracted with tennant unknowingly; property owner now does not consent.5/25/2006Tony Thomas
Estimate to build house way off.5/24/2006Peter M. Elliott
lien enforcement5/17/2006Peter M. Elliott
Please help me to solve my assignments5/16/2006Tony Thomas
Contactor will not complete the work5/13/2006Tony Thomas
FIDIC 4th ADDITION REPRINTED 19925/11/2006Bogdan Oprea
FIDIC5/11/2006Peter M. Elliott
FIDIC5/10/2006Peter M. Elliott
FIDIC5/10/2006Bogdan Oprea
non-compliance form5/9/2006Peter M. Elliott
FIDIC5/3/2006Tony Thomas
Describe and explain the differences...4/22/2006Tony Thomas
FIDIC -Which Clause4/18/2006Peter M. Elliott
Access for Demob4/18/2006Bogdan Oprea
Salary4/11/2006Peter M. Elliott
Property issues3/28/2006Tony Thomas
FIDIC3/27/2006Bogdan Oprea
Builder Standard of Workmanship?3/19/2006Peter M. Elliott
Homeowners rights to dismiss builder3/19/2006Peter M. Elliott
Terminating Contractor to hire new Contractor to finish3/18/2006Peter M. Elliott
Breech of contract?3/6/2006Peter M. Elliott
Builder accepted money with no written contract2/3/2006Peter M. Elliott
Contractor's poor work quality1/27/2006Peter M. Elliott
Contractor's poor work quality1/26/2006Peter M. Elliott
Scheduled Payment1/18/2006Peter M. Elliott
Homeowner rights from contractor1/2/2006Peter M. Elliott
verbal agreement in construction12/27/2005Peter M. Elliott
FIDIC11/4/2005Bogdan Oprea
Contractor Dies, continuing the jobs?11/3/2005Peter M. Elliott
new construction floor plan varitations10/20/2005Bogdan Oprea
Who is responsible to pay for wet basement remedy?10/19/2005Peter M. Elliott
construction contract9/17/2005Peter M. Elliott
construction law9/9/2005Peter M. Elliott
REMODELING QUOTE PRICE ADJUST.9/6/2005Peter M. Elliott
legal terms8/22/2005Peter M. Elliott
Construction Contracts and Arbitration7/15/2005Peter M. Elliott
Verbal hip shot7/1/2005Peter M. Elliott
verbal contract7/1/2005Peter M. Elliott
verbal contract6/30/2005Peter M. Elliott
Payment to Home Builder6/29/2005Peter M. Elliott
Verbal hip shot6/29/2005Peter M. Elliott
construction certificate ownership6/24/2005Peter M. Elliott
overstated mechanic liens6/24/2005Peter M. Elliott
BLANKET MORTGAGES : SECURING CLAUSES AND INDIVIDUAL RELEASES OF PAID UP LOANS/PLOTS6/14/2005Peter M. Elliott
Award Contract6/14/2005Peter M. Elliott
Florida Construction Laws6/10/2005Peter M. Elliott
suing builder...6/1/2005Peter M. Elliott
reale state scam, lien.. HELP5/14/2005Peter M. Elliott
Already Paid Bad Contractor5/11/2005Peter M. Elliott
breach of contract for builder as well as lending bank on construction loan5/3/2005Peter M. Elliott
New Construction Warranty5/3/2005Peter M. Elliott
Dear Peter Elliot, I am...4/5/2005Peter M. Elliott
Differences between Site Instructions and Variation Orders3/29/2005Peter M. Elliott
Party Wall act 1996 Award given3/21/2005Peter M. Elliott
late penalty charge3/17/2005Peter M. Elliott
Party Wall act 1996 Award given3/16/2005Peter M. Elliott
Construction Contracts3/15/2005Peter M. Elliott
Qoute versus Actual price3/5/2005Peter M. Elliott
Qoute versus Actual price3/3/2005Peter M. Elliott
statue of limitations2/21/2005Peter M. Elliott
I hired a man who I thought...2/19/2005Peter M. Elliott
Pool Construction2/18/2005Peter M. Elliott
Illegal colvert built by previous owner of home2/10/2005Peter M. Elliott
Problems w/New Construction2/8/2005Peter M. Elliott
Problems w/New Construction2/6/2005Peter M. Elliott
violation of construction contracts2/3/2005Peter M. Elliott
builder and verbal contract breach of2/3/2005Peter M. Elliott
foundations1/24/2005Peter M. Elliott
sub contarctors1/19/2005Peter M. Elliott
verbal contracts12/8/2004Peter M. Elliott
Construction on a Private Way12/8/2004Peter M. Elliott
verbal contracts12/7/2004Peter M. Elliott
mechanics lien11/23/2004Peter M. Elliott
error on blue prints11/19/2004Peter M. Elliott
Homeowner with Mechanics Lien11/10/2004Peter M. Elliott
pool constrruction law11/1/2004Barry Clifford Snyder
education10/26/2004Peter M. Elliott
New Home Warranty/Breach of contract10/20/2004Barry Clifford Snyder
No Certificate of Occupancy10/17/2004Barry Clifford Snyder
Builder built over the property line10/10/2004Barry Clifford Snyder
remodel mishap10/8/2004Barry Clifford Snyder
Breach of Contract10/7/2004Barry Clifford Snyder
property lines reply at bottom9/29/2004Barry Clifford Snyder
property lines9/25/2004Barry Clifford Snyder
dispute Mechanics lien8/31/2004Peter M. Elliott
responsibility for destroyed property during the construction8/13/2004Barry Clifford Snyder
Construction quote8/5/2004Peter M. Elliott
Demobilisation7/31/2004Peter M. Elliott
Unfinished Construction Work7/26/2004Peter M. Elliott
recieving payment /retianage7/25/2004Peter M. Elliott
The right to speak the national minority language7/17/2004Peter M. Elliott
beneficial occupancy6/29/2004Peter M. Elliott
proving my case6/24/2004Peter M. Elliott
GUARANTEED MAXIMUM PRICE FORM OF CONTRACT6/20/2004Peter M. Elliott
Collection from a General Contractor who won't pay.6/18/2004Peter M. Elliott
------------------------- ...6/16/2004Peter M. Elliott
Non-Verbal Contract - Construction6/16/2004Peter M. Elliott
My husband and I are in the...6/15/2004Peter M. Elliott
Non-Verbal Contract - Construction6/15/2004Peter M. Elliott
J.C.T. 1998 with quants6/2/2004Peter M. Elliott
cement sidewalk5/18/2004Peter M. Elliott
In 2001 I had a "repipe specialist"...5/18/2004Peter M. Elliott
Statue of Limitations for Construction Non-payment Case4/28/2004Peter M. Elliott
Contract for home improvement4/15/2004Peter M. Elliott
Contract for home improvement4/14/2004Peter M. Elliott
sub contractor or material supplier4/9/2004Peter M. Elliott
Construction Law - Digital Photos3/26/2004Peter M. Elliott
Not Awarding a bid3/17/2004Peter M. Elliott
major install mistakes hidden3/8/2004Peter M. Elliott
Party Walls England3/7/2004Peter M. Elliott
contract3/6/2004Peter M. Elliott
construction2/15/2004Peter M. Elliott
Contractor walks off the job10/3/2003Peter M. Elliott
Builders lien and time frame9/17/2003Peter M. Elliott
New home construction9/8/2003Peter M. Elliott
losing thirteen year old business to employee8/11/2003Peter M. Elliott
Heavy Machinery Use8/11/2003Peter M. Elliott
Mechanics Lien7/23/2003Peter M. Elliott
Claim for acceration,manpower and services for an increase in scope of work but not time eg manpower5/10/2003Peter M. Elliott
Interest due on Final Payment?1/27/2003Peter M. Elliott
my house1/10/2003Peter M. Elliott
defective materials12/8/2002Peter M. Elliott
Unwanted billboard11/13/2002Peter M. Elliott
Compensation for Damages7/11/2002Peter M. Elliott
We own a construction business...7/2/2002Peter M. Elliott
Small Business Contract6/11/2002Peter M. Elliott
My mother got a price quote...4/13/2002Peter M. Elliott
Major problems with construction workers2/7/2002Peter M. Elliott
Construction Contract Termination1/30/2002Peter M. Elliott
What do we need to do?1/26/2002Peter M. Elliott
what is our next step?12/31/2001Peter M. Elliott
my home8/16/2001Peter M. Elliott
NEW CONSTRUCTION7/25/2001Peter M. Elliott
real estate law5/24/2001Peter M. Elliott
mechanics' lien4/22/2001Peter M. Elliott
dispute about construction costs3/31/2001Peter M. Elliott
lot grade3/29/2001Peter M. Elliott
Faulty Construction/Major Problem in only a 18 mo. old house.3/18/2001Peter M. Elliott
Sub contractors2/24/2001Peter M. Elliott
Mechanic's lien1/21/2001Peter M. Elliott
construction firm bankruptcy11/23/2000Peter M. Elliott
verbal contracts11/14/2000Peter M. Elliott
Mr Elliot, My husband and...11/2/2000Peter M. Elliott

Page:  Most Recent   | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10  |   Oldest

Construction Law

All Answers


Answers by Expert:


Ask Experts

Volunteer


Peter M. Elliott

Top Expert on this page

Expertise

First response to queries regarding extensions of time, variations orders, site instructions and payment using FIDIC and other forms of Conditions of Contract, based on English Law, and derivatives only. Anyone who needs advice about EoT should download and study the SCL Delay & Disruption Protocol www.eotprotocol.com before submitting a question.

Experience

Value . . .
It's unwise to pay too much, but it's unwise to pay too little. When you pay too much you lose a little money, that is all. When you pay too little, you sometimes lose everything, because the thing you bought was incapable of doing the thing you bought it to do.
The common law of business balance prohibits paying a little and getting a lot. It can't be done. If you deal with the lowest bidder, it's well to add something for the risk you run.
And if you do that, you will have enough to pay for something better.
. . . John Ruskin (1819 - 1900)
"We are too poor to buy something cheap"
.Romanian Proverb 2002
A lean compromise is better than a fat lawsuit. George Herbert (English poet 1593-1633)
I said it in Hebrew, I said it in Dutch,
I said it in German and Greek:
But I wholly forgot (and it vexes me much)
That English is what you speak!" Hunting of the Snark - Lewis Caroll
Match your presentation to the reader!
The joy of food lasts but an hour, of sleep but a day, of a woman, but a month, but the joy of a building lasts a lifetime. Syrian proverb.
Comments and observations leading to improvements in the translation of FIDIC Red & Yellow books into Romanian prior to approval by FIDIC (reference 'Preface to the Romanian edition')

Organizations
Institution of Civil Engineers, Association of Chartered and Certified Accountants, Society of Construction Law, Dispute Resolution Board Foundation